Get matched with top contractors in Queens, NY

Queens homeowners rate contractors in our network

4.7

(33 reviews)

Top-rated contractors.

Need a pro for your contractor service project in Queens, NY?

Select your specific project to find the pro for you.
Unfinished Carpentry questions, answered by experts

Duration varies by project size, but average-sized homes typically take a weeks.

Proper Murphy bed installation minimizes the risk of wall damage. A secure attachment requires making some holes for anchors or brackets, but these can be easily patched if the bed is removed. To ensure the installation is done correctly and safely, hiring a professional is recommended, especially if you have limited DIY experience.

Costs depend on furniture type, size, complexity, and whether additional modifications are needed.

Costs depend on desk size, labor, included features like drawers or motorized height adjustments, and required wall anchoring.

Framing most homes takes anywhere between five and eight weeks to complete. You’ll need to account for inclement weather conditions, material shipment times, the number of crew members, and the weight of your materials. If the weather is too hot, wet, or cold for the installation, this process could take closer to eight weeks.