Top-rated pool builders and installers.

Best pool builders and installers near Queens, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your pool construction and installation project in Queens, NY?

Select your specific project to find the pro for you.

Top-Rated Pool builders and installers in Queens - Updated Nov 2026

Avatar for S&R Pool & Spa Inc
S&R Pool & Spa Inc
3.9(
52
)
Above Ground Swimming Pool or Accessories - Repair or ServiceIn Ground Swimming Pool or Accessories - Repair or ServiceReplace Vinyl Liner for Swimming Pool+6 more

Serving Queens, NY and surrounding areas

Approved

In business since 1987

Free estimates

Emergency services offered

"Have used S&R pools for many years and always happy with the quality, timeliness and pricing of their work. Kevin is an excellent owner who tells you straight on what services you do and do not need and always super responsive. I would highly recommend using S&R for all of your pool needs (build and service)!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+32

Recommended by78%of homeowners
Avatar for Clear water pools
Clear water pools
5.0(
7
)
Above Ground Swimming Pool or Accessories - Repair or ServiceReplace Vinyl Liner for Swimming PoolSwimming Pool - Opening & Closing Service+1 more

Serving Queens, NY and surrounding areas

In business since 2020

Free estimates

Credit card accepted

"Just had my pool opened for the season and I couldn?t be happier with the service! The team arrived on time, worked efficiently, and had everything cleaned up and running smoothly in no time. They were professional, knowledgeable, and took the time to answer all my questions about maintenance and water chemistry. It?s clear they take pride in their work ? the pool looks amazing and is crystal clear. I?m ready for a great summer thanks to them! Highly recommend to anyone looking for reliable, top-notch pool service."
Vinyl Liner installed perfectly
Recommended by40%of homeowners
...
Showing 1-10 of 123
Pool Construction and Installation FAQs, answered by experts

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

While concrete walls do not need to "breathe" in the traditional sense of the word, they do require waterproofing and dehumidifying methods, particularly in basements below the water table. Concrete both contains moisture from its initial installation and can absorb water when exposed. Ensuring proper basement ventilation , installing a vapor barrier, and controlling water exposure are all important tasks.

If a buyer pays for a survey, the surveyor they hired will only provide results to them. It’s up to the buyer whether they share the survey results with the seller or not, even if they ultimately walk away from the deal. It’s considered good faith to share the results with the seller, though, especially if you back out of the deal, as the seller can then provide that survey to future interested parties.

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

Errors in site preparation can lead to structural failures or appear costly midway. Professionals ensure detailed, reliable home base development layouts.

The Queens, NY homeowners’ guide to pool constructions and installations

From average costs to expert advice, get all the answers you need to get your job done.