Top-rated subcontractors.

Get matched with top subcontractors in Bristow, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Bristow, VA?

Select your specific project to find the pro for you.

TRUSTED BY BRISTOW, VA HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon7.1k+
    Verified subcontracting services reviews

Find Subcontractors in Bristow

Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.7(
335
)
Major Home Repairs (General Contractor)

Serving Bristow, VA and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"The master bathroom renovation process we experienced was frustrating and plagued with many unnecessary delays and quality control breakdowns. Having gone through numerous home improvement projects, we carefully researched companies and selected VKB Kitchen and Bath in large part because of the overwhelmingly positive reviews we read on numerous websites, including Angie’s List. Unfortunately, the company we worked with bore little resemblance to the glowing reviews we read. While we are ultimately happy with the finished product, we do not feel anyone should experience the frustrating ordeal we went through to have a bathroom renovated. Consequently, we cannot recommend VKB Kitchen and Bath. We signed a contract with VKB on March 17, 2016, to perform a complete renovation of our master bath. The project was to follow the VKB designer’s specifications, and was to be substantially completed in 2 weeks—their estimate, not ours—with minor items to be addressed in a final third week. The actual renovation began on April 19th, a week later than originally planned. From the beginning, we experienced problems. VKB gave us access to an automated project management tool to check on the job’s status, see what work was scheduled each day, see any change orders for modifications made during the renovation, and communicate any questions or concerns through its message board. VKB was to use the tool to communicate progress, work schedules, and responses to our questions. If actually used and kept current, it would have been a helpful resource to monitor the job’s status and any slippages. However, VKB rarely used it, and when it was used, it presented grossly inaccurate information (ex., noting tasks as “completed” when they had not been started or were well behind). Toward the end of the job, after numerous delays and a turnover in the subcontractor VKB hired to perform the work and the reassignment of the project manager, the lead designer—Joe—used the messaging feature more frequently to timely respond to our questions or concerns and to better inform us as to the new sub-contractor’s work schedule. Demolition of the old master bathroom took several days, primarily because most of the work was done by one worker. This pattern continued during construction of the new bathroom. Each day, several workers would show up to unload equipment, but then typically most would go to another job site, leaving just one person to handle much of the work. We were told that the crew would begin work between 8 a.m. and 9 a.m. and would work full days as long as there was work to be done, yet for the vast majority of the time the initial subcontractor was involved, the crew would not show up until 10 a.m. or later, and would usually leave between 3 and 4 p.m. There were days when no one showed up and we were not notified that no one would be coming that day, despite there being ample work. The lack of sufficient workers and erratic work hours were major factors in the job quickly falling behind schedule. When we raised concerns about job slippages to VKB’s project manager, he dismissed our concerns. Serious communication issues existed between the subcontractor and VKB’s project manager which led to mistakes and delays. For example, one key design decision prior to commencement of the renovation was the removal of a ceiling and wall bulkhead to allow for more open space. The bulkhead wall contained a ventilation register which had to be removed and rerouted through a toe-kick in one of the new vanities. Due to miscommunications, the subcontractor tiled over the ventilation opening on the floor. The crew had to subsequently pull up newly-installed tile to create a ventilation path and install a new vent. However, because of the manner in which this ventilation path was constructed, the floor register did not fit properly flush with the tile floor. It still does not fit properly to this day. To be fair, issues arose which contributed to delays in the job that were not originally anticipated. For example, when the subcontractor finished the demolition, he noted that the floor was not completely level. To his credit, he took steps to fully level the floor, which took a day to complete. Additionally, in designing the new bathroom, the designer envisioned shifting the position of the toilet. As the job progressed, the subcontractor and project manager realized this would not work without extending a wall. We agreed with this change, which added another day to the project. Finally, we were scheduled to be out of town beginning in mid-May, which resulted in the crew not being able to work on the job for 10 days. Yet, had the job met the original contracted timeframes, it should have been completed nearly 2 weeks prior to our trip. When little additional progress had been made 2 weeks after our return, VKB reassigned the project manager and Joe, our lead designer, fired the subcontractor and brought in a new subcontractor to complete the bathroom renovation. However, this subcontractor had to work us into his existing jobs, putting a strain on his crew. To further complicate the new subcontractor’s job, there were numerous instances in which materials delivered were either defective or incomplete. For example, a large wood linen cabinet was unfinished on one side, resulting in VKB having to order a piece to finish the side. Additionally, the cabinet, and two vanities that were to be installed were supposed to have two side-by-side doors. When we inspected the delivered cabinet and vanities, we found that they had single doors. After noting this to VKB, we were told that the manufacturer did not make vanities that had two side-by-side doors, though they were in VKB’s design and the contract specified them. When we noted this would be problematic with respect to the linen cabinet given its placement in the bathroom, VKB said the cabinet could have side-by-side doors but it would require re-ordering them. We later found out that any re-ordering of items would require 2-to-3 weeks from the time of ordering until the items would arrive. While a 2-to-3 week delay was bad enough given the significant slippages already incurred, it turned out that VKB also misjudged other wood materials needed from this same manufacturer to complete the cabinet and vanity installation–such as trim and crown molding we had requested prior to commencement of the renovation–which resulted in another several weeks of delays. The end result of these missteps was that the new subcontractor had to pull out on two occasions for a period of 2 weeks each to allow time for new and/or replacement parts to arrive. Additionally, VKB twice sent out a separate crew to install the shower door and glass, and each time, the crew had to leave without performing the installation because work on the shower was not sufficiently complete for them to install the glass. When they were finally able to attempt the installation, they discovered an error in the manufacturing of one side of the glass. They had to reorder the side, resulting in yet another delay. Perhaps most disturbing is that the door and glass had been ready for weeks, yet no one checked them to ensure the manufacturer had completed them to specification. Other examples of this abound, including delivery of bathroom sinks and countertops which were not properly made and hardware for the cabinet and vanities, which were missing handles. Many of these problems could have been prevented or at least detected and addressed earlier had VKB had an effective process in place to ensure all materials ordered from vendors were inspected for both quantity and quality as soon as they were received. As a result of these problems, our master bathroom renovation—which was to have taken at most 3 weeks—took nearly 4 months to complete. Final work was completed on August 8th. Even at that, we ultimately settled for certain things simply to end the ordeal and move on. For example, the floor register that had been improperly installed by the initial subcontractor was never properly resolved by VKB—its solution was to cut the register bottom"
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
4 neighbors recently requested a quote
Recommended by91%of homeowners
Avatar for Jaber Construction, LLC
Jaber Construction, LLC
5.0(
41
)
Major Home Repairs (General Contractor)

Serving Bristow, VA and surrounding areas

Approved

In business since 2017

Free estimates

Credit card accepted

With years of experience serving the area, we are your solution for all your remodeling needs. We take great pride in our extreme professionalism, timeliness and superior customer service on every job. We make sure to develop a lasting relationship so that the next time service is needed there will be no question on who to call. Check out our 5 star reviews from happy customers! Call us today so we can discuss your needs and make a plan that fits your budget. Satisfaction guaranteed!

Master Bath Remodel
Master Bath Remodel
Master Bath Remodel
Master Bath Remodel
Powder Room Remodel

+238

Response time4 hrs
Response rate94%
Recommended by97%of homeowners
Avatar for MANEX GENERAL CONTRACTING & REMODELING, LLC
MANEX GENERAL CONTRACTING & REMODELING, LLC
5.0(
26
)
Major Home Repairs (General Contractor)

Serving Bristow, VA and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Warranties offered

We take great pride in the experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. To understand the needs and expectations of our customers, we take great care to work and professionally communicate with every customer. Our reputation is based on service, safety, and quality, regardless of how large or small the job is.

Response time11 hrs
Response rate94%
10 neighbors recently requested a quote
Avatar for DiJulio Contracting LLC
DiJulio Contracting LLC
4.5(
38
)
Major Home Repairs (General Contractor)

Serving Bristow, VA and surrounding areas

Approved

In business since 2011

Free estimates

Warranties offered

Serving Northern Virginia, DiJulio Contracting, LLC is a Construction and Remodeling General Contractor. We are a fully licensed and insured Class A contractor in Northern Virginia. Our core business is built around Basement Finishing and Bathroom remodeling. We are competitively priced across all fields, and adequately staff and supervise our projects to ensure the work is completed with the highest quality and within reasonable time frames. When you call us for an estimate, we will provide you with a detailed plan, design specifications, schedule, and a complete proposal package with much more info. This is all provided at no cost to you. We do not underbid jobs and try to recover costs with hidden, ambiguous extra charges during the project, as many unethical, unlicensed contractors do. When you accept the contract terms, the project should progress almost flawlessly without any additional costs. Tambien, se habla Espanol. So contact us today. Credit payments are an accepted method of payment for projects that meet specific criteria. Also covering Alexandria City, Fairfax City, and City of Falls Church.

McLean Basement Tray
McLean Basement Bar
Ashburn Bar
Wet Bar
View to Theater Room

+23

3 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for JW Home Improvement
JW Home Improvement
4.4(
5,748
)
Major Home Repairs (General Contractor)

Serving Bristow, VA and surrounding areas

Approved (Corporate)

In business since 2001

Warranties offered

Credit card accepted

"BEWARE OF CONTRACTORS. PERIOD.
I give this a B rating overall because the first handyman (I believe his name was Chris) they sent did MAJOR DAMAGE to my home. He was aloof, very unprofessional, and then drilled several holes straight through a plaster wall as he attempted to wall mount a television. The other side of the wall is fully wallpapered, and the paper has been damaged and has holes in it--this is in my living room. That contractor was horrible and wasted an entire day in my home doing little other than causing damage. He had a p*** poor attitude--stating that "he felt this indoor task of hanging things was beneath him" because he "builds things", and then went on to curse out the woman at JW who assigned him the job as I stood there listening to him on the phone. He also told me snidely that he didn't care that he caused damage because JW would just send somebody out there to clean up his mess--he is just a subcontractor so has zero accountability he said, so he didn't care. Just horrible.
HOWEVER, the JW office team was very apologetically and immediately sent someone out to survey the damage, and they offered to repair the wall and replace the wall paper for free. I ultimately declined because it would be an even greater inconvenience for me to go from what was supposed to be a simple hanging job that should have taken less than 4 hours, to then have JW trash my living room for a day with a construction project that required removing built in bookcases so they can repair small holes and re-wallpaper an entire wall. Just wasn't worth the headache in the end to me, but I unfortunately am stuck living with the damage and am just hiding it behind some books.
Beyond this, they did send out two great guys who I highly recommend--Ever & Johann--who finished up the original job that the first guy botched. Ever & Johann are fantastic, really reliable, very skilled, and fast! I felt bad for them because they were sent to clean up a colleagues mess. I really wish they had been assigned to us in the first place because they were fantastic. I will rehire them for another job I have pending. 
All in all, the problem with companies like JW is that they subcontract their projects to random contractors, and there is little in the way of quality control or accountability. For every great guy like Ever or Johann you get a jerk like the one who trashed my walls. JW is really just a middle man in many ways that takes calls for work and then goes out and finds folks to do it. The people who work for the company are great--from the guy that came out to give an estimate, to the person who took the incident report, to the woman who does the scheduling... but the contractors are hit or miss. I recommend that you ask for Ever & Johann. Otherwise be cautious because you don't know who you'll get.
"
Additional Photos
CARPENTRY SERVICE
EXTERIOR PAINTING
KITCHEN REMODEL
Jesse Wertjes with Angie!

+8

22 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for MARVEL HOMES LLC
MARVEL HOMES LLC
4.9(
43
)
Major Home Repairs (General Contractor)

Serving Bristow, VA and surrounding areas

Approved

In business since 2002

Warranties offered

Customers say: True professional

"When our renovation project fell apart, we heard of Marvel Home Improvement through friends who had used Devin's services and were very satisfied with the experience. We checked several references, all of which were glowing. We asked Devin, the owner of the business who serves as general contractor for all projects, to assess the condition of our house and advise us on how to fix it and complete the project. The house was empty and unlivable at the time. We needed a contractor who could accurately provide a timeline, a good cost estimate and contracting process. Marvel has a reputation for on-time delivery and excellent cost and project management. Devin impressed us with his experience and responsiveness. He quickly also referred us to an excellent architectural designer who helped us to move forward with fixing design issues and finalizing a design. Devin's team started the project on schedule. The workers were courteous, tidy, and respectful of the property every single day. They cleaned up the job site at the end of the day and worked quickly and competently throughout the day. All sub-contractors on the project obviously had long-established, positive professional relationships with Devin. From the painters to the flooring company to the tile installer to the electrician to the mason who built a stone fireplace, the subcontractors provided pricing and service that obviously reflected an outstanding relationship with Marvel Homes. Devin also provided accurate updates on costs on a regular basis and made excellent suggestions on where/how to save money without sacrificing quality. He personally arrived on the job site daily. When questions or issues inevitably arose, he addressed them immediately. He communicated with us on a daily basis, never hesitating to let us know the status of the project or about any structural or materials issues. As a result, we were well-informed throughout the project. Devin is also outstanding at on-time delivery. He provided a schedule of work at the start of the project and then emailed us regularly to make sure that we were making decisions and keeping up with the project. He often collected information for us about pricing and delivery times and dealt directly with materials providers, ensuring that the project would stay on track. The choreography of the work was a great demonstration of strong organizational and time management. Most importantly, we will actually be sorry for the project to end, as we've enjoyed working with Devin so much. He is a rare blend of integrity, humor, competence, personal responsibility and experience. We went from disappointment and despair about our home renovation, to great satisfaction at the beautiful work that has been done. We endorse Devin and Marvel Homes without reservation and will hire them again should the need arise."
Before 2
After 2
Exterior
Exterior
Exterior

+8

Recommended by100%of homeowners
Avatar for Home Equity Contractors
Home Equity Contractors
4.3(
33
)
Major Home Repairs (General Contractor)

Serving Bristow, VA and surrounding areas

Approved

Free estimates

Warranties offered

Credit card accepted

Free Estimates. We understand how stressful and expensive home improvements can be from choosing the right contractor for the job to having your house in disarray for a period of time. If you are updating your home to put on the market, we offer a deferred payment option. We recognize the struggle that sellers face when getting ready to sell their home. Often the main issue is simply not having the finances to make the necessary improvements that will generate a higher sales price. For some it is simply understanding that today's buyers want move in ready homes. ​HEC was started to give sellers and their agents the ability to sell their home quickly and at the highest price possible. There is no secret to selling, UPDATED HOMES SELL FASTER AND HIGHER! Our clients have averaged a 130% Return on Investment when updating their home for sale. \n\nWe can take care of all of your home remodeling needs from finishing a basement, remodeling your kitchen and bathrooms, to replacing your roof. \n\n​Our approach is simple - we use high quality contractors to make smart updates to your home or listing based on our 20 years of experience in the DC Area Real Estate Market. We do not recommend high end upgrades if they will not generate a good return on your investment. We work with you or your agent to establish an expected price after updates to make an informed decision. The owners of Home Equity Contractors are licensed Realtors in VA, MD, and DC.

Response time9 hrs
2 neighbors recently requested a quote
Recommended by86%of homeowners
Marconi Construction LLC
4.7(
23
)
Major Home Repairs (General Contractor)

Serving Bristow, VA and surrounding areas

Approved

In business since 2014

Free estimates

Warranties offered

Thank you for considering Marconi Construction LLC. We have been in business for 11 years. We strive to meet all your service needs and ensure quality craftmanship ! We are a family owned and operated business where customer satisfaction is our TOP PRIORITY! We offer interior & exterior painting, flooring- including hardwood, and remodeling! Call or text us today for an estimate at (571) 287-9865 We look forward to working with you

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+106

Response time5 hrs
5 neighbors recently requested a quote
Recommended by91%of homeowners
Arellano's Painting INC
5.0(
1
)
Major Home Repairs (General Contractor)

Serving Bristow, VA and surrounding areas

Approved

Free estimates

Warranties offered

Customers say: True professional

We have the experience and dedication to get the job done right! Specializing in painting services; We guarantee your satisfaction, and we won't leave until the job is done right. We pride ourselves on the quality work we provide, while delivering great customer service! Call or click for your FREE estimate today!

Before pictures
Before pictures
Add a new  niches
Before pictures
After

+3

Recommended by100%of homeowners
...
Showing 1-10 of 459
Subcontractors questions, answered by experts

While possible for small projects, professional designers ensure compliance with building codes and structural integrity.

If your project is complex, it may make sense to hire an architect to draw plans. An architect might also be a good person to hire if you want to ensure your plans adhere to building codes and regulations.

British architect John Nash is credited with creating the Italianate style of architecture. The style was further popularized in the U.S. by landscape architect Andrew Jackson Downing and architect Calvert Vaux. The style spread across the U.S. due to Downing’s popular book on the style and the availability of plans and materials due to the mass production of the Industrial Revolution.

You don’t have to commit to a complete home renovation to age in place comfortably—those can get pricey. Instead, focus on a few impactful changes. Consider adding a stair lift or installing ramps to eliminate barriers. Upgrading to non-slip flooring can prevent falls while adding brighter lighting can improve visibility throughout your home. These thoughtful updates can make your home much easier to navigate and enhance your comfort and safety without the stress and cost of a complete overhaul.

Yes, most designers tailor plans to fit your budget. Discuss financial constraints during initial consultations.

The Bristow, VA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.