Top-rated subcontractors.

Get matched with top subcontractors in Linton Hall, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Linton Hall, VA?

Select your specific project to find the pro for you.

TRUSTED BY LINTON HALL, VA HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon7.3k+
    Verified subcontracting services reviews

Find Subcontractors in Linton Hall

Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.7(
339
)
Major Home Repairs (General Contractor)

Serving Linton Hall, VA and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"The master bathroom renovation process we experienced was frustrating and plagued with many unnecessary delays and quality control breakdowns. Having gone through numerous home improvement projects, we carefully researched companies and selected VKB Kitchen and Bath in large part because of the overwhelmingly positive reviews we read on numerous websites, including Angie’s List. Unfortunately, the company we worked with bore little resemblance to the glowing reviews we read. While we are ultimately happy with the finished product, we do not feel anyone should experience the frustrating ordeal we went through to have a bathroom renovated. Consequently, we cannot recommend VKB Kitchen and Bath. We signed a contract with VKB on March 17, 2016, to perform a complete renovation of our master bath. The project was to follow the VKB designer’s specifications, and was to be substantially completed in 2 weeks—their estimate, not ours—with minor items to be addressed in a final third week. The actual renovation began on April 19th, a week later than originally planned. From the beginning, we experienced problems. VKB gave us access to an automated project management tool to check on the job’s status, see what work was scheduled each day, see any change orders for modifications made during the renovation, and communicate any questions or concerns through its message board. VKB was to use the tool to communicate progress, work schedules, and responses to our questions. If actually used and kept current, it would have been a helpful resource to monitor the job’s status and any slippages. However, VKB rarely used it, and when it was used, it presented grossly inaccurate information (ex., noting tasks as “completed” when they had not been started or were well behind). Toward the end of the job, after numerous delays and a turnover in the subcontractor VKB hired to perform the work and the reassignment of the project manager, the lead designer—Joe—used the messaging feature more frequently to timely respond to our questions or concerns and to better inform us as to the new sub-contractor’s work schedule. Demolition of the old master bathroom took several days, primarily because most of the work was done by one worker. This pattern continued during construction of the new bathroom. Each day, several workers would show up to unload equipment, but then typically most would go to another job site, leaving just one person to handle much of the work. We were told that the crew would begin work between 8 a.m. and 9 a.m. and would work full days as long as there was work to be done, yet for the vast majority of the time the initial subcontractor was involved, the crew would not show up until 10 a.m. or later, and would usually leave between 3 and 4 p.m. There were days when no one showed up and we were not notified that no one would be coming that day, despite there being ample work. The lack of sufficient workers and erratic work hours were major factors in the job quickly falling behind schedule. When we raised concerns about job slippages to VKB’s project manager, he dismissed our concerns. Serious communication issues existed between the subcontractor and VKB’s project manager which led to mistakes and delays. For example, one key design decision prior to commencement of the renovation was the removal of a ceiling and wall bulkhead to allow for more open space. The bulkhead wall contained a ventilation register which had to be removed and rerouted through a toe-kick in one of the new vanities. Due to miscommunications, the subcontractor tiled over the ventilation opening on the floor. The crew had to subsequently pull up newly-installed tile to create a ventilation path and install a new vent. However, because of the manner in which this ventilation path was constructed, the floor register did not fit properly flush with the tile floor. It still does not fit properly to this day. To be fair, issues arose which contributed to delays in the job that were not originally anticipated. For example, when the subcontractor finished the demolition, he noted that the floor was not completely level. To his credit, he took steps to fully level the floor, which took a day to complete. Additionally, in designing the new bathroom, the designer envisioned shifting the position of the toilet. As the job progressed, the subcontractor and project manager realized this would not work without extending a wall. We agreed with this change, which added another day to the project. Finally, we were scheduled to be out of town beginning in mid-May, which resulted in the crew not being able to work on the job for 10 days. Yet, had the job met the original contracted timeframes, it should have been completed nearly 2 weeks prior to our trip. When little additional progress had been made 2 weeks after our return, VKB reassigned the project manager and Joe, our lead designer, fired the subcontractor and brought in a new subcontractor to complete the bathroom renovation. However, this subcontractor had to work us into his existing jobs, putting a strain on his crew. To further complicate the new subcontractor’s job, there were numerous instances in which materials delivered were either defective or incomplete. For example, a large wood linen cabinet was unfinished on one side, resulting in VKB having to order a piece to finish the side. Additionally, the cabinet, and two vanities that were to be installed were supposed to have two side-by-side doors. When we inspected the delivered cabinet and vanities, we found that they had single doors. After noting this to VKB, we were told that the manufacturer did not make vanities that had two side-by-side doors, though they were in VKB’s design and the contract specified them. When we noted this would be problematic with respect to the linen cabinet given its placement in the bathroom, VKB said the cabinet could have side-by-side doors but it would require re-ordering them. We later found out that any re-ordering of items would require 2-to-3 weeks from the time of ordering until the items would arrive. While a 2-to-3 week delay was bad enough given the significant slippages already incurred, it turned out that VKB also misjudged other wood materials needed from this same manufacturer to complete the cabinet and vanity installation–such as trim and crown molding we had requested prior to commencement of the renovation–which resulted in another several weeks of delays. The end result of these missteps was that the new subcontractor had to pull out on two occasions for a period of 2 weeks each to allow time for new and/or replacement parts to arrive. Additionally, VKB twice sent out a separate crew to install the shower door and glass, and each time, the crew had to leave without performing the installation because work on the shower was not sufficiently complete for them to install the glass. When they were finally able to attempt the installation, they discovered an error in the manufacturing of one side of the glass. They had to reorder the side, resulting in yet another delay. Perhaps most disturbing is that the door and glass had been ready for weeks, yet no one checked them to ensure the manufacturer had completed them to specification. Other examples of this abound, including delivery of bathroom sinks and countertops which were not properly made and hardware for the cabinet and vanities, which were missing handles. Many of these problems could have been prevented or at least detected and addressed earlier had VKB had an effective process in place to ensure all materials ordered from vendors were inspected for both quantity and quality as soon as they were received. As a result of these problems, our master bathroom renovation—which was to have taken at most 3 weeks—took nearly 4 months to complete. Final work was completed on August 8th. Even at that, we ultimately settled for certain things simply to end the ordeal and move on. For example, the floor register that had been improperly installed by the initial subcontractor was never properly resolved by VKB—its solution was to cut the register bottom"
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
Response rate100%
2 neighbors recently requested a quote
Avatar for Jaber Construction, LLC
Jaber Construction, LLC
5.0(
42
)
Major Home Repairs (General Contractor)

Serving Linton Hall, VA and surrounding areas

Approved

In business since 2017

Free estimates

Credit card accepted

With years of experience serving the area, we are your solution for all your remodeling needs. We take great pride in our extreme professionalism, timeliness and superior customer service on every job. We make sure to develop a lasting relationship so that the next time service is needed there will be no question on who to call. Check out our 5 star reviews from happy customers! Call us today so we can discuss your needs and make a plan that fits your budget. Satisfaction guaranteed!

Master Bath Remodel
Master Bath Remodel
Master Bath Remodel
Master Bath Remodel
Powder Room Remodel

+238

Response time4 hrs
Response rate94%
Recommended by95%of homeowners
Avatar for MANEX GENERAL CONTRACTING & REMODELING, LLC
MANEX GENERAL CONTRACTING & REMODELING, LLC
5.0(
26
)
Major Home Repairs (General Contractor)

Serving Linton Hall, VA and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Warranties offered

We take great pride in the experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. To understand the needs and expectations of our customers, we take great care to work and professionally communicate with every customer. Our reputation is based on service, safety, and quality, regardless of how large or small the job is.

Response time11 hrs
Response rate96%
Recommended by68%of homeowners
Avatar for DiJulio Contracting LLC
DiJulio Contracting LLC
4.5(
38
)
Major Home Repairs (General Contractor)

Serving Linton Hall, VA and surrounding areas

Approved

In business since 2011

Free estimates

Warranties offered

Serving Northern Virginia, DiJulio Contracting, LLC is a Construction and Remodeling General Contractor. We are a fully licensed and insured Class A contractor in Northern Virginia. Our core business is built around Basement Finishing and Bathroom remodeling. We are competitively priced across all fields, and adequately staff and supervise our projects to ensure the work is completed with the highest quality and within reasonable time frames. When you call us for an estimate, we will provide you with a detailed plan, design specifications, schedule, and a complete proposal package with much more info. This is all provided at no cost to you. We do not underbid jobs and try to recover costs with hidden, ambiguous extra charges during the project, as many unethical, unlicensed contractors do. When you accept the contract terms, the project should progress almost flawlessly without any additional costs. Tambien, se habla Espanol. So contact us today. Credit payments are an accepted method of payment for projects that meet specific criteria. Also covering Alexandria City, Fairfax City, and City of Falls Church.

McLean Basement Tray
McLean Basement Bar
Ashburn Bar
Wet Bar
View to Theater Room

+23

2 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for JW Home Improvement
JW Home Improvement
4.4(
5,749
)
Major Home Repairs (General Contractor)

Serving Linton Hall, VA and surrounding areas

Approved (Corporate)

In business since 2001

Warranties offered

Credit card accepted

"The work was completed to my satisfaction, however it appeared they subcontracted the work as the men who showed up to do the work were not wearing JW uniforms and did speak much english. At one point JW called and asked if they men were wearing their uniforms, when told no, the next thing one of the guys phones rang and they went out to their vehicle and put on JW shirts. We were able to explain with a quite a bit of effort (due to language barrier) what needed done and as I mentioned before it was completed satisfactorily, however when I hired off of Angie's list I don't expect to get what APPEARS to have been sub contractors hired for day work. ."
Additional Photos
CARPENTRY SERVICE
EXTERIOR PAINTING
KITCHEN REMODEL
Jesse Wertjes with Angie!

+8

23 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for MARVEL HOMES LLC
MARVEL HOMES LLC
4.9(
43
)
Major Home Repairs (General Contractor)

Serving Linton Hall, VA and surrounding areas

Approved

In business since 2002

Warranties offered

Customers say: True professional

"Devin and his wonderful crew are in the process of doing all of the remodeling work listed above, but I am so impressed with them I wanted to get some of this down now. 
In mid-April/late May, I found evidence that there was a mouse in my house (ewww), and despite my best efforts, and hiring Orkin (I'll review them, too), I could never find/capture the darn thing. So, I decided I was going to hire a contractor to come "mouse-proof" my house, and while I was at it, I was going to create the kitchen/dining room, laundry room and bathroom I wanted. Just like we are taught, I selected 3 contractors to come and discuss the work I wanted done and to get estimates. One never showed, even though he made an appointment, one told me why I couldn't do the work I wanted done, and then there was Devin. 
From the first time I spoke with Devin (first in email, then on the phone, then in person), I knew we would work well together. He never told me I *couldn't* do any of the things I wanted done, but he gave me a realistic idea of how much it was going to cost me. Then, he did a walkthrough of the house, and not only did he help me put my ideas into a realistic framework, he went the extra mile and went into my crawl space and found some structural damage that had to be repaired before any of the remodeling could be done. He was honest with me about how much the work would cost, and he and the guys have already improved the feel of the whole house by repairing the support structure on the house. Before Devin and his crew got to work, the floor slanted in places, and now the floor is completely level. The one other contractor that came to look at the house (and told me my remodel ideas were wrong), didn't even look at the support beams or the crawl space. 
Once we had the price range set, he brought in a wonderful, patient, architect who drew up such good plans that I could actually visualize what my new space would look like, and then brought in an interior designer to help with the cabinets, appliances and look of the place. 
Devin and his crew have been working on the house for a couple weeks now, and every time I go to look at it (I did mention that they are re-doing the bathroom, right?) there is something new and wonderful to see. One of the best things about the work is that they are cleaning up as they go. In fact, they built a wall between where they are doing the major work and where I was still living in the house (until the bathroom got gone) so that no dust or debris was in the living areas of the house. And, once I moved out due to lack of "facilities", they taped off my rooms to keep the dust out while they installed the lighting and while they worked on the bathroom. 
The bottom line is, just based on the work that's been done so far, I would recommend Marvell Homes LLC to anyone who is looking to upgrade their home. 
I'll update this review (hopefully with pictures) when the work is done.

****************************
So, the work is done, and I love my house! Life got in the way, and I couldn't get to this update as quickly as I wanted to, but I couldn't *not* finish this review. 

The remodel came out better than I had ever hoped, and I *love* my new spaces! Devin and the guys turned my dinky little cramped house into a home I'm proud of. And he did it all within the budget he originally quoted me. Not only that, but he came back and fixed the one minor problem that cropped up after the job was done! Who *does* that these days? 

I was so pleased with the work Devin and the guys did on the public rooms of the house, I've already started saving to have them work their magic on the bedrooms, and I wouldn't even *think* of using another contractor for anything I need done."
Before 2
After 2
Exterior
Exterior
Exterior

+8

1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Home Equity Contractors
Home Equity Contractors
4.3(
33
)
Major Home Repairs (General Contractor)

Serving Linton Hall, VA and surrounding areas

Approved

Free estimates

Warranties offered

Credit card accepted

"We are very happy with the work Home Equity Contractors did for us. Especially appreciated the prompt communications from Brett and that Brett cared about the health and safety of his crew. The crew did a great job, nice cleanup. We would definitely hire them again."
Response time9 hrs
3 neighbors recently requested a quote
Recommended by86%of homeowners
Avatar for Aimz Design & Remodeling, LLC
Aimz Design & Remodeling, LLC
New to Angi
Major Home Repairs (General Contractor)

Serving Linton Hall, VA and surrounding areas

Approved

In business since 2018

Free estimates

Credit card accepted

Welcome to AIMZ Design & Remodeling, \nwhere we turn your dream home into reality. AIMZ is a customer first focusd company with a strong vision for giving customers a personal/unique experience. With years of experience in the home remodeling industry, our team is dedicated to transforming your space with expert craftsmanship and a keen eye for design. Whether you're looking to update a single room or undertake a complete renovation, we provide personalized solutions that reflect your unique style and needs. From concept to completion, we are committed to delivering exceptional quality, attention to detail, and unparalleled customer service. Let us help you create the home you've always envisioned!

...
Showing 1-10 of 457
Subcontractors questions, answered by experts

Yes, many providers offer design consultations to help optimize and maximize space, functionality, and usage. It is recommended to confirm the availability of this service with your specific installer or contractor.

The process typically takes 2-6 weeks, depending on the project size and level of customization.

Costs depend on desk size, labor, included features like drawers or motorized height adjustments, and required wall anchoring.

Buying a house is easier than building one from scratch. Buying an existing home is almost always faster, even if you need to make renovations once you move in. When you hire the right team to build a home, they will simplify the design and build phases so that there is little guesswork throughout the process, but building new construction will almost always take longer than buying an existing home.

Check reviews, compare quotes, and verify licensing. Ensure the builder has experience with modular construction.

The Linton Hall, VA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.