Top-rated subcontractors.

Get matched with top subcontractors in Newburg, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Newburg, MD?

Select your specific project to find the pro for you.

TRUSTED BY NEWBURG, MD HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon156
    Verified subcontracting services reviews

Find Subcontractors in Newburg

Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.7(
339
)
Major Home Repairs (General Contractor)

Serving Newburg, MD and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"The master bathroom renovation process we experienced was frustrating and plagued with many unnecessary delays and quality control breakdowns. Having gone through numerous home improvement projects, we carefully researched companies and selected VKB Kitchen and Bath in large part because of the overwhelmingly positive reviews we read on numerous websites, including Angie’s List. Unfortunately, the company we worked with bore little resemblance to the glowing reviews we read. While we are ultimately happy with the finished product, we do not feel anyone should experience the frustrating ordeal we went through to have a bathroom renovated. Consequently, we cannot recommend VKB Kitchen and Bath. We signed a contract with VKB on March 17, 2016, to perform a complete renovation of our master bath. The project was to follow the VKB designer’s specifications, and was to be substantially completed in 2 weeks—their estimate, not ours—with minor items to be addressed in a final third week. The actual renovation began on April 19th, a week later than originally planned. From the beginning, we experienced problems. VKB gave us access to an automated project management tool to check on the job’s status, see what work was scheduled each day, see any change orders for modifications made during the renovation, and communicate any questions or concerns through its message board. VKB was to use the tool to communicate progress, work schedules, and responses to our questions. If actually used and kept current, it would have been a helpful resource to monitor the job’s status and any slippages. However, VKB rarely used it, and when it was used, it presented grossly inaccurate information (ex., noting tasks as “completed” when they had not been started or were well behind). Toward the end of the job, after numerous delays and a turnover in the subcontractor VKB hired to perform the work and the reassignment of the project manager, the lead designer—Joe—used the messaging feature more frequently to timely respond to our questions or concerns and to better inform us as to the new sub-contractor’s work schedule. Demolition of the old master bathroom took several days, primarily because most of the work was done by one worker. This pattern continued during construction of the new bathroom. Each day, several workers would show up to unload equipment, but then typically most would go to another job site, leaving just one person to handle much of the work. We were told that the crew would begin work between 8 a.m. and 9 a.m. and would work full days as long as there was work to be done, yet for the vast majority of the time the initial subcontractor was involved, the crew would not show up until 10 a.m. or later, and would usually leave between 3 and 4 p.m. There were days when no one showed up and we were not notified that no one would be coming that day, despite there being ample work. The lack of sufficient workers and erratic work hours were major factors in the job quickly falling behind schedule. When we raised concerns about job slippages to VKB’s project manager, he dismissed our concerns. Serious communication issues existed between the subcontractor and VKB’s project manager which led to mistakes and delays. For example, one key design decision prior to commencement of the renovation was the removal of a ceiling and wall bulkhead to allow for more open space. The bulkhead wall contained a ventilation register which had to be removed and rerouted through a toe-kick in one of the new vanities. Due to miscommunications, the subcontractor tiled over the ventilation opening on the floor. The crew had to subsequently pull up newly-installed tile to create a ventilation path and install a new vent. However, because of the manner in which this ventilation path was constructed, the floor register did not fit properly flush with the tile floor. It still does not fit properly to this day. To be fair, issues arose which contributed to delays in the job that were not originally anticipated. For example, when the subcontractor finished the demolition, he noted that the floor was not completely level. To his credit, he took steps to fully level the floor, which took a day to complete. Additionally, in designing the new bathroom, the designer envisioned shifting the position of the toilet. As the job progressed, the subcontractor and project manager realized this would not work without extending a wall. We agreed with this change, which added another day to the project. Finally, we were scheduled to be out of town beginning in mid-May, which resulted in the crew not being able to work on the job for 10 days. Yet, had the job met the original contracted timeframes, it should have been completed nearly 2 weeks prior to our trip. When little additional progress had been made 2 weeks after our return, VKB reassigned the project manager and Joe, our lead designer, fired the subcontractor and brought in a new subcontractor to complete the bathroom renovation. However, this subcontractor had to work us into his existing jobs, putting a strain on his crew. To further complicate the new subcontractor’s job, there were numerous instances in which materials delivered were either defective or incomplete. For example, a large wood linen cabinet was unfinished on one side, resulting in VKB having to order a piece to finish the side. Additionally, the cabinet, and two vanities that were to be installed were supposed to have two side-by-side doors. When we inspected the delivered cabinet and vanities, we found that they had single doors. After noting this to VKB, we were told that the manufacturer did not make vanities that had two side-by-side doors, though they were in VKB’s design and the contract specified them. When we noted this would be problematic with respect to the linen cabinet given its placement in the bathroom, VKB said the cabinet could have side-by-side doors but it would require re-ordering them. We later found out that any re-ordering of items would require 2-to-3 weeks from the time of ordering until the items would arrive. While a 2-to-3 week delay was bad enough given the significant slippages already incurred, it turned out that VKB also misjudged other wood materials needed from this same manufacturer to complete the cabinet and vanity installation–such as trim and crown molding we had requested prior to commencement of the renovation–which resulted in another several weeks of delays. The end result of these missteps was that the new subcontractor had to pull out on two occasions for a period of 2 weeks each to allow time for new and/or replacement parts to arrive. Additionally, VKB twice sent out a separate crew to install the shower door and glass, and each time, the crew had to leave without performing the installation because work on the shower was not sufficiently complete for them to install the glass. When they were finally able to attempt the installation, they discovered an error in the manufacturing of one side of the glass. They had to reorder the side, resulting in yet another delay. Perhaps most disturbing is that the door and glass had been ready for weeks, yet no one checked them to ensure the manufacturer had completed them to specification. Other examples of this abound, including delivery of bathroom sinks and countertops which were not properly made and hardware for the cabinet and vanities, which were missing handles. Many of these problems could have been prevented or at least detected and addressed earlier had VKB had an effective process in place to ensure all materials ordered from vendors were inspected for both quantity and quality as soon as they were received. As a result of these problems, our master bathroom renovation—which was to have taken at most 3 weeks—took nearly 4 months to complete. Final work was completed on August 8th. Even at that, we ultimately settled for certain things simply to end the ordeal and move on. For example, the floor register that had been improperly installed by the initial subcontractor was never properly resolved by VKB—its solution was to cut the register bottom"
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
Response rate100%
2 neighbors recently requested a quote
Avatar for John Krause Construction
John Krause Construction
4.4(
169
)
Major Home Repairs (General Contractor)

Serving Newburg, MD and surrounding areas

Approved

In business since 1998

Free estimates

Emergency services offered

"The job went well. Even small problems were handled. The contractor did need to oversee subcontractor for roof better. They agree. They kept me in the loop well most of the time and had numerous suggestions that were helpful. Big quality was top rate because the people doing the work where that type of crew. That makes all the difference for any job."
Pool House Exterior with Floor-to-Ceiling Windows & Doors, Two Pergolas, & Cupola with Windows
Modern Farmhouse Kitchen
Luxury Bathroom Renovation with Free-Standing Clawfoot Tub & Chandelier
Pool House - Side Entrance
Modern Farmhouse Kitchen with Farmhouse Sink, Pull-Down Faucet, Stainless Steel Range, Range Hood, Double Wall Oven, and Dishwasher

+113

Response time2 days
Response rate100%
10 neighbors recently requested a quote
Avatar for City Renovations & Remodeling LLC
City Renovations & Remodeling LLC
4.0(
321
)
Major Home Repairs (General Contractor)

Serving Newburg, MD and surrounding areas

Approved

In business since 1987

Credit card accepted

Customers say: True professional

"I highly recommend City Renovations and Remodeling to new and experienced homeowners and investors. In fact, Mike Wiggs, owner of the company, was highly recommended to me from a trusted source. Mike has been my designer, general contractor and project manager for over three years. He and his team of subcontractors for all the trades and handymen have successfully completed numerous projects for me. The internal big jobs included Mike and his team remodeling my basement into a permitted apartment with an egress window, injection well system, and recessed lighting; remodeling my kitchen into a larger space, better layout and upgraded appliances, cabinets, backsplashes (e.g., switching from an electric cooktop island to a slide-in gas range and installing a peninsula); changing the location of the sliding door and a set of windows in my sunroom for better flow and sightline from the front door entry to the patio door leading to my wooded backyard; replacing the damaged one of the two HVAC systems (i.e., one for the first floor and basement and the other for the second floor); and whole house interior painting and decorative touches (accent walls, trim, etc.) The external big jobs included Mike and his team resolving the sources of severe water damage to my two-story front door entry area and installing a new door, side lites and stoop. He resolved other water problems at my house by installing upgraded, larger gutters connecting to a new underground drainage system, and re-grading a section of the backyard next to my house in order to better collect water coming onto the house and move it away from the house. The other jobs Mike and his team completed include installing decorative lighting in the front of my house and security lighting at the sides and back; installing and repairing wooden privacy fencing in my backyard; washing away years of mold, mildew and stains from the siding of my house; and installing shelving for two closets and the laundry room to increase my storage space. After years of City Renovations and Remodeling successfully improving or repairing my home, I hired the company to help me with an investment rental property. Mike completed a walk-thru assessment and report to supplement the information from the home inspector and appraiser. Through my pre-purchase consultation with Mike, I got a good idea of what it would take improve the property given my goals and budget. I look forward to working with Mike and his team to renovate the property."
Basement Remodel
ISland
Custom Vanity & Backsplash
Custom Bathroom
Custom Bathroom

+225

Response time10 hrs
11 neighbors recently requested a quote
Recommended by84%of homeowners
Simmons Home Improvement LLC
4.9(
87
)
Major Home Repairs (General Contractor)

Serving Newburg, MD and surrounding areas

In business since 2021

Free estimates

Warranties offered

From start to finish, we have you covered from home repairs, to remodeling! TV wall/ceiling mounts, furniture assembly, toilet installs, flooring, drywall, painting and more! We guarantee your satisfaction and we won’t leave until the job is done right. We pride ourselves on the quality work we provide, while delivering great customer service! Check out all the services we offer below and call -- or-- click to schedule a free estimate today! \n

Remodeling - General Project
Painting a (2) car garage
Install Rain shower panel
Bathroom remodeling
Electrical Project

+93

Response time2 days
Recommended by96%of homeowners
Avatar for Supreme Window and Door
Supreme Window and Door
4.8(
69
)
Major Home Repairs (General Contractor)

Serving Newburg, MD and surrounding areas

In business since 2005

Free estimates

Emergency services offered

Supreme Window and Door is a full service exterior residential remodeling company specializing in replacement windows, exterior doors, siding, gutters and trim products. We are committed to providing homeowner’s with high quality exterior replacement products at affordable prices that our major competitors do not even want you to know about while maintaining a supreme level of customer satisfaction. Supreme Window and Door assures a no pressure sales approach, expert product knowledge and quality installation techniques backed with no-nonsense Lifetime product and installation warranties. We are fully licensed, bonded, and insured. We accept all major credit cards. Additional email - [email protected].

Windows
Bay window capped
Sliding Glass Door
Recommended by95%of homeowners
Avatar for STONEBERGER GARAGE DOORS UNLIMITED, INC.
STONEBERGER GARAGE DOORS UNLIMITED, INC.
5.0(
138
)
Major Home Repairs (General Contractor)

Serving Newburg, MD and surrounding areas

In business since 2011

Free estimates

Emergency services offered

We are a family owned and operated garage door company offering products by Clopay, Amarr, Wayne Dalton and Liftmaster. Our employees are highly skilled and trained in the field with over 20 years of experience. Difficult or highly complex installation or service problems are welcomed. We have many model doors and openers that are in stock. Same Day service is available.

Grand Harbor
Wayne Dalton Wood Doors
Clopay Gallery Door
Clopay Coachman
Clopay Canyon Ridge

+11

Recommended by100%of homeowners
Avatar for StudioTek Builders
StudioTek Builders
4.8(
45
)
Major Home Repairs (General Contractor)

Serving Newburg, MD and surrounding areas

In business since 1990

Warranties offered

Small jobs welcome

"

In the fall of 2014 we set out to hire a general contractor to perform a complete gut and remodel of our cooperative apartment kitchen.  The space was original to this 1966 structure and was in dire need of some TLC.  We had been planning for well over a year before we even started looking for a contractor, so we had a very good idea on the design and didn't need any help in that arena.

We opted to go with Green Studio Builders (GSB) for a couple of reasons.  The first is that we saw their work first hand in another apartment within our building and we were very impressed with the craftsmanship especially considering the complexities of that project.  Our project was similarly complex and it was reassuring to know that they had experience to tackle more than the run of the mill project. It's also nice to work with a contractor that already knows the building, the management staff, the rules and regulations, etc. The second reason was the result of our interaction with the owner of the company during his onsite visit to our apartment during the assessment phase.  One could describe Chris as passionate.  During the walkthrough he was a terrific listener and clearly was able to grasp the intensity of the project.

The project consisted of gutting a 20' x 12' kitchen right down to the studs and concrete sub floor, removing walls between the kitchen and living room, walls between the kitchen and dining room as well as a wall between the living room and dining room.  We were going for an open concept and amidst that there was re-routing of trunk phone lines for apartments above and below us as well as a thermostat relocation.

Work began in February and completed 4 months later in June.  We were assigned an operations manager and supervisor to the project.  Between them they were to coordinate all of the onsite activities.   Despite the assigned leadership, I assure you that I was keeping a strict eye on the project at all times.  We were not about to part with this kind of money with no personal oversite regardless of GSB?s reputation.  While the project was a huge success, I assure you that there were several conversations throughout the project to have minor elements corrected or to re-educate the crew members on the expectations of the project elements.  This type of open communication was vital and GSB?s entire crew was excellent at following through on my every concern without ever making us feel like we were overbearing.

The demolition was completed in two phases; the first was an early prep to remove the old cabinetry and appliances to prepare the space for the asbestos abatement company (with whom we were expected to contract independently with).  Once the asbestos abatement was complete, GSB returned immediately to resume with phase two of the demolition where they removed the walls.  During this process our apartment was thoroughly draped to try and contain the dust and protection was laid on our hard wood floors to protect them from damage.  The debris was removed from the apartment in a timely manner.  With demolition complete, the new walls were framed and GSB coordinated for the electrical and plumbing sub-contractors to complete the necessary work.  The walls were then drywalled, mudded, sanded and primed.  GSB then installed the floor tile absolutely perfectly.  They followed through on my pattern flawlessly and the installer took great care to insure a proper installation.  We opted for long and narrow tiles and if the thinset underneath is not perfect it can cause future cracking , the installer took his time to ensure our complete satisfaction.  GSB did a great job of coordinating the timeliness of the subcontractor for cabinet delivery and installation.

One of our longest delays followed cabinet installation.  We opted to go through GSB and their subcontractor for countertop installation and had already selected out stone, but there were several breakdowns in communication which resulted in a couple week delay.  While this was a sore subject for a few days, I assure you that GSB took complete ownership of the issue and made the situation right in a way that was agreeable to both us and them.  We never expected the project to be easy, but when snags do occur you need an organization that will own up to their promises and GSB did exactly that.

Backsplash tile installation followed the countertop install.  Good news is that GSB sent the same crew back and like the floor work, the tile was installed exactly to specifications.  Once this was complete, GSB coordinated the final electrical and plumbing work as well as painting.  The operations manager came onsite for a physical assessment and the creation of a punch list of final to do?s and those tasks were completed expeditiously.

We have enjoyed out new kitchen now for just shy of two months and every day we are appreciative of the fine work that was done to bring us to this point.  We recommend GSB and their crew.


"
RESIDENTIAL
RESTAURANT
KITCHEN
Recommended by100%of homeowners
Avatar for All Pro Exteriors
All Pro Exteriors
4.6(
62
)
Major Home Repairs (General Contractor)

Serving Newburg, MD and surrounding areas

In business since 1991

Emergency services offered

"Mr. Yoder started construction in November, approximately three weeks later than planned. This was due to his having been unexpectedly hospitalized with appendicitis. However, in that time he kept us completely informed as to his status and when he expected to start by calling us at least once a week. He also ensured all government paperwork and permits were obtained and this effort was part of the final bill.

The work went very smoothly, with some inevitable, though minor delays due to bad weather (it was November and December, after all). He cleard the foundation area and three-foot-deep holes for the main support posts, which were anchored with cement. He next put up all of the framing, siding, roof, etc. and installed the windows and doors.

Work such as laying the concrete for the floor, intalling gutters and downspouts and electrical work were handled by subcontractors, the price of which also was included in the final bill. Please note, the original asking price was about $19,000, but we requested some additions, such as wall insulation and installing a new sidewalk concurrent with the garage foundation, which added to the price.

The work began on Nov. 16, 2011, and was finished just before Christmas.

We have photographs of the work in progress and the finished garage available to be emailed to anyone interested in seeing Mr. Yoder's work."
Recommended by94%of homeowners
CRG Remodeling
4.5(
106
)
Major Home Repairs (General Contractor)

Serving Newburg, MD and surrounding areas

In business since 2008

Free estimates

Emergency services offered

We are owner operated and specialize in kitchen and bathroom remodeling. With over 15 years of experience in the construction we know the quality you expect from your residential or commercial renovation projects and our experienced and put your projects in the hands of a construction company with a foundation as strong supporting your home. We are licensed, bonded and insured. Satisfaction is first priority. No job to big or small.Additional email is: [email protected]

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+13

Recommended by95%of homeowners
...
Showing 1-10 of 281
Subcontractors questions, answered by experts

Regular meetings, reviewing drafts, and providing input on materials help align the project with your vision.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.

Balancing aesthetics with functionality amidst space planning is important. To do so, you could consider consulting both an interior designer and an architect to fulfill both these needs. Or you can tackle it on your own by prioritizing personal touches amidst space planning that add to the look but don't take away from the livability of the space.

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

The Newburg, MD homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.