Top-rated subcontractors.

Get matched with top subcontractors in Clarksburg, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Clarksburg, MD?

Select your specific project to find the pro for you.

TRUSTED BY CLARKSBURG, MD HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon4k+
    Verified subcontracting services reviews

Find Subcontractors in Clarksburg

Avatar for Diaz Painting & Renovations LLC
Diaz Painting & Renovations LLC
4.9(
124
)
Major Home Repairs (General Contractor)

Serving Clarksburg, MD and surrounding areas

Approved

In business since 2010

Free estimates

Emergency services offered

"Repair of framing was done quickly and professionally. Window pane teplacent was outsourced to a subcontractor who took much longer than I was told to comete i stallation. When finally finished, the work was very satisfactory"
bathroom remodeling
bathroom remodeling
bathroom remodeling
bathroom remodeling
bathroom remodeling

+62

Response time3 days
Response rate100%
2 neighbors recently requested a quote
Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.7(
338
)
Major Home Repairs (General Contractor)

Serving Clarksburg, MD and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"The master bathroom renovation process we experienced was frustrating and plagued with many unnecessary delays and quality control breakdowns. Having gone through numerous home improvement projects, we carefully researched companies and selected VKB Kitchen and Bath in large part because of the overwhelmingly positive reviews we read on numerous websites, including Angie’s List. Unfortunately, the company we worked with bore little resemblance to the glowing reviews we read. While we are ultimately happy with the finished product, we do not feel anyone should experience the frustrating ordeal we went through to have a bathroom renovated. Consequently, we cannot recommend VKB Kitchen and Bath. We signed a contract with VKB on March 17, 2016, to perform a complete renovation of our master bath. The project was to follow the VKB designer’s specifications, and was to be substantially completed in 2 weeks—their estimate, not ours—with minor items to be addressed in a final third week. The actual renovation began on April 19th, a week later than originally planned. From the beginning, we experienced problems. VKB gave us access to an automated project management tool to check on the job’s status, see what work was scheduled each day, see any change orders for modifications made during the renovation, and communicate any questions or concerns through its message board. VKB was to use the tool to communicate progress, work schedules, and responses to our questions. If actually used and kept current, it would have been a helpful resource to monitor the job’s status and any slippages. However, VKB rarely used it, and when it was used, it presented grossly inaccurate information (ex., noting tasks as “completed” when they had not been started or were well behind). Toward the end of the job, after numerous delays and a turnover in the subcontractor VKB hired to perform the work and the reassignment of the project manager, the lead designer—Joe—used the messaging feature more frequently to timely respond to our questions or concerns and to better inform us as to the new sub-contractor’s work schedule. Demolition of the old master bathroom took several days, primarily because most of the work was done by one worker. This pattern continued during construction of the new bathroom. Each day, several workers would show up to unload equipment, but then typically most would go to another job site, leaving just one person to handle much of the work. We were told that the crew would begin work between 8 a.m. and 9 a.m. and would work full days as long as there was work to be done, yet for the vast majority of the time the initial subcontractor was involved, the crew would not show up until 10 a.m. or later, and would usually leave between 3 and 4 p.m. There were days when no one showed up and we were not notified that no one would be coming that day, despite there being ample work. The lack of sufficient workers and erratic work hours were major factors in the job quickly falling behind schedule. When we raised concerns about job slippages to VKB’s project manager, he dismissed our concerns. Serious communication issues existed between the subcontractor and VKB’s project manager which led to mistakes and delays. For example, one key design decision prior to commencement of the renovation was the removal of a ceiling and wall bulkhead to allow for more open space. The bulkhead wall contained a ventilation register which had to be removed and rerouted through a toe-kick in one of the new vanities. Due to miscommunications, the subcontractor tiled over the ventilation opening on the floor. The crew had to subsequently pull up newly-installed tile to create a ventilation path and install a new vent. However, because of the manner in which this ventilation path was constructed, the floor register did not fit properly flush with the tile floor. It still does not fit properly to this day. To be fair, issues arose which contributed to delays in the job that were not originally anticipated. For example, when the subcontractor finished the demolition, he noted that the floor was not completely level. To his credit, he took steps to fully level the floor, which took a day to complete. Additionally, in designing the new bathroom, the designer envisioned shifting the position of the toilet. As the job progressed, the subcontractor and project manager realized this would not work without extending a wall. We agreed with this change, which added another day to the project. Finally, we were scheduled to be out of town beginning in mid-May, which resulted in the crew not being able to work on the job for 10 days. Yet, had the job met the original contracted timeframes, it should have been completed nearly 2 weeks prior to our trip. When little additional progress had been made 2 weeks after our return, VKB reassigned the project manager and Joe, our lead designer, fired the subcontractor and brought in a new subcontractor to complete the bathroom renovation. However, this subcontractor had to work us into his existing jobs, putting a strain on his crew. To further complicate the new subcontractor’s job, there were numerous instances in which materials delivered were either defective or incomplete. For example, a large wood linen cabinet was unfinished on one side, resulting in VKB having to order a piece to finish the side. Additionally, the cabinet, and two vanities that were to be installed were supposed to have two side-by-side doors. When we inspected the delivered cabinet and vanities, we found that they had single doors. After noting this to VKB, we were told that the manufacturer did not make vanities that had two side-by-side doors, though they were in VKB’s design and the contract specified them. When we noted this would be problematic with respect to the linen cabinet given its placement in the bathroom, VKB said the cabinet could have side-by-side doors but it would require re-ordering them. We later found out that any re-ordering of items would require 2-to-3 weeks from the time of ordering until the items would arrive. While a 2-to-3 week delay was bad enough given the significant slippages already incurred, it turned out that VKB also misjudged other wood materials needed from this same manufacturer to complete the cabinet and vanity installation–such as trim and crown molding we had requested prior to commencement of the renovation–which resulted in another several weeks of delays. The end result of these missteps was that the new subcontractor had to pull out on two occasions for a period of 2 weeks each to allow time for new and/or replacement parts to arrive. Additionally, VKB twice sent out a separate crew to install the shower door and glass, and each time, the crew had to leave without performing the installation because work on the shower was not sufficiently complete for them to install the glass. When they were finally able to attempt the installation, they discovered an error in the manufacturing of one side of the glass. They had to reorder the side, resulting in yet another delay. Perhaps most disturbing is that the door and glass had been ready for weeks, yet no one checked them to ensure the manufacturer had completed them to specification. Other examples of this abound, including delivery of bathroom sinks and countertops which were not properly made and hardware for the cabinet and vanities, which were missing handles. Many of these problems could have been prevented or at least detected and addressed earlier had VKB had an effective process in place to ensure all materials ordered from vendors were inspected for both quantity and quality as soon as they were received. As a result of these problems, our master bathroom renovation—which was to have taken at most 3 weeks—took nearly 4 months to complete. Final work was completed on August 8th. Even at that, we ultimately settled for certain things simply to end the ordeal and move on. For example, the floor register that had been improperly installed by the initial subcontractor was never properly resolved by VKB—its solution was to cut the register bottom"
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
Response rate100%
5 neighbors recently requested a quote
Avatar for Arms Home Improvement
Arms Home Improvement
5.0(
45
)
Major Home Repairs (General Contractor)

Serving Clarksburg, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2013

Free estimates

Warranties offered

ARM’s Home Improvement has been in business since 2013. After 26 years of working for the same home improvement/construction company, working his way to Vice President, Allen Metcalf, 4th generation carpenter, started Arm’s Home Improvement Company. At ARM's Home Improvement, we believe in providing the highest quality work, timeliness, clear communication throughout the entire process and client satisfaction. We specialize in residential construction, such as kitchen and bathroom remodeling. We can help you conceptualize your visions and turn them into reality. Please contact us today to schedule your free in-home estimate! We can show you 3D walk-through of your kitchen, bath or basement remodel. We are also a LEAD SAFE RENOVATOR. See more pictures and visit us on our Facebook page https://www.facebook.com/ArmsHomeImprovement/

Finished Carpentry and Woodworking Project
Finished Carpentry and Woodworking Project
Finished Carpentry and Woodworking Project
Finished Carpentry and Woodworking Project
Finished Carpentry and Woodworking Project

+359

Response time10 mins
4 neighbors recently requested a quote
Recommended by95%of homeowners
Avatar for E&V remodeling innovation
E&V remodeling innovation
5.0(
17
)
Major Home Repairs (General Contractor)

Serving Clarksburg, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Emergency services offered

Our mission is to be a provider that brings back the personal touch with our customers. We will build a relationship that will last a lifetime after you see our quality work. As a locally owned and operated business, we feel invested in our clients and constantly strive for customer satisfaction. Call or message us to schedule an estimate today!

Framing Project
✨
Framing Project
Deck
Deck

+3

Response time3 days
Response rate100%
Recommended by29%of homeowners
Avatar for Willis Builders Inc
Willis Builders Inc
4.3(
392
)
Major Home Repairs (General Contractor)

Serving Clarksburg, MD and surrounding areas

Approved

In business since 2004

Free estimates

Warranties offered

"We hired Matthew and his team to completely gut and renovate our small master bathroom. Very generally, the experience was a positive one. The good: - Matthew and his subcontractor were extremely responsive to emails, texts, and calls - If we pointed out something that we thought wasn't quite perfect, they were happy to fix it - trash was removed fairly regularly and they would always tidy up the work/ storage area if asked (mostly when it was spilling into our walkway) - They always called to ask before adding extra work to the contract, even if it was clearly necessary (i.e. sistering some beams that had dry rot) - bills and itemized receipts were produced promptly and regularly - the estimate for labor was spot-on and we didn't feel like we were upsold - the additional costs came from things we had either anticipated or agreed were necessary (some beam sistering, replacing the ceiling, finding an alternate way to vent a new fan) The bad: - our project manager was only on-site a couple times a week and not for very long, which meant there was no direct supervision of the guys doing the work - it felt like every day or every other day we had to point out stuff that needed to be fixed - a crooked tile, missing waterproofing, regular tile used where there should have been bullnose - which was frustrating - they frequently ran out of things or discovered new supplies they needed that had to be ordered (shower valves, more tile, etc.), leading to delays - the work took about twice as long as they had first estimated Overall, I understand that some of these frustrations and difficulties are just part of dealing with a renovation. While I would have preferred not to have to nudge them about items so frequently, I certainly felt like they were treating us fairly in terms of cost and appreciated the responsiveness."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+111

Response time1 day
Response rate100%
23 neighbors recently requested a quote
Avatar for Dreamville Remodeling
Dreamville Remodeling
5.0(
28
)
Major Home Repairs (General Contractor)

Serving Clarksburg, MD and surrounding areas

Approved

Super Service Award Winner

In business since 1991

Free estimates

Emergency services offered

Dreamville Remodeling is a locally family owned and operated company that values honesty and integrity in all aspects of our business. We take great pride in our experience, expertise, quality, and customer service. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. Our services are customized to your individual needs, paying close attention to the details of each project that we are involved with. Please feel free to contact us today!

Previous unlicensed contractor work
Seamless Gutter & Downspouts
Previous unlicensed contractor work
Seamless Gutter & Downspouts
Previous unlicensed contractor work

+57

Response time12 hrs
Response rate95%
3 neighbors recently requested a quote
APX Home Improvement, Inc.
4.8(
63
)
Major Home Repairs (General Contractor)

Serving Clarksburg, MD and surrounding areas

Approved

In business since 2011

Free estimates

Warranties offered

"Owner Alex is quick to respond on requests and quotes and understands the work requirements. He sent two employees/subcontractors to complete the actual work - they worked very hard and got the job done quickly. Reasonable price - will use again!"
Response time1 day
1 neighbors recently requested a quote
Recommended by86%of homeowners
Avatar for JW Home Improvement
JW Home Improvement
4.4(
5,748
)
Major Home Repairs (General Contractor)

Serving Clarksburg, MD and surrounding areas

Approved (Corporate)

In business since 2001

Warranties offered

Credit card accepted

"BEWARE OF CONTRACTORS. PERIOD.
I give this a B rating overall because the first handyman (I believe his name was Chris) they sent did MAJOR DAMAGE to my home. He was aloof, very unprofessional, and then drilled several holes straight through a plaster wall as he attempted to wall mount a television. The other side of the wall is fully wallpapered, and the paper has been damaged and has holes in it--this is in my living room. That contractor was horrible and wasted an entire day in my home doing little other than causing damage. He had a p*** poor attitude--stating that "he felt this indoor task of hanging things was beneath him" because he "builds things", and then went on to curse out the woman at JW who assigned him the job as I stood there listening to him on the phone. He also told me snidely that he didn't care that he caused damage because JW would just send somebody out there to clean up his mess--he is just a subcontractor so has zero accountability he said, so he didn't care. Just horrible.
HOWEVER, the JW office team was very apologetically and immediately sent someone out to survey the damage, and they offered to repair the wall and replace the wall paper for free. I ultimately declined because it would be an even greater inconvenience for me to go from what was supposed to be a simple hanging job that should have taken less than 4 hours, to then have JW trash my living room for a day with a construction project that required removing built in bookcases so they can repair small holes and re-wallpaper an entire wall. Just wasn't worth the headache in the end to me, but I unfortunately am stuck living with the damage and am just hiding it behind some books.
Beyond this, they did send out two great guys who I highly recommend--Ever & Johann--who finished up the original job that the first guy botched. Ever & Johann are fantastic, really reliable, very skilled, and fast! I felt bad for them because they were sent to clean up a colleagues mess. I really wish they had been assigned to us in the first place because they were fantastic. I will rehire them for another job I have pending. 
All in all, the problem with companies like JW is that they subcontract their projects to random contractors, and there is little in the way of quality control or accountability. For every great guy like Ever or Johann you get a jerk like the one who trashed my walls. JW is really just a middle man in many ways that takes calls for work and then goes out and finds folks to do it. The people who work for the company are great--from the guy that came out to give an estimate, to the person who took the incident report, to the woman who does the scheduling... but the contractors are hit or miss. I recommend that you ask for Ever & Johann. Otherwise be cautious because you don't know who you'll get.
"
Additional Photos
CARPENTRY SERVICE
EXTERIOR PAINTING
KITCHEN REMODEL
Jesse Wertjes with Angie!

+8

30 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for CHEVY CHASE REMODELING
CHEVY CHASE REMODELING
4.3(
222
)
Major Home Repairs (General Contractor)

Serving Clarksburg, MD and surrounding areas

Approved

In business since 2000

Free estimates

Emergency services offered

"Chevy Chase Remodeling did an exterior renovation for us, including replacing our roof and siding, painting our house, replacing a window, and adding a new screened-in porch and patio in our backyard. They took care of the design work as well as arranging all the subcontracting to perform the construction work. The owner, Steven, and all the subcontractors were friendly, easy to work with, and professional. It took a while, as we expected, but they worked overtime to complete on time the one part of the project we needed done by a certain date. And they did a great job overall--we are very pleased with the final results. The house looks totally remade and the porch and patio are just what we were hoping for. We recommend them!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+10

Response time1 day
Response rate100%
14 neighbors recently requested a quote
Avatar for Omar's General Contracting
Omar's General Contracting
4.1(
196
)
Major Home Repairs (General Contractor)

Serving Clarksburg, MD and surrounding areas

Approved

Super Service Award Winner

In business since 1988

Free estimates

Warranties offered

"It looks like we have a new house!  Everything looks very professional, excellent quality work.  They finished on time, with some minor touch-ups to be completed on the finish date.  We would definitely use him again.

Omar is very professional and courteous and knows a lot about construction.  They have great service, they always responded promptly to any requests, and any changes we asked for were made right away.  They went above and beyond to make us happy with the work.  Omar took a lot of time to make sure we were happy with the floor stain and paint colors and did lots of test patches for us. They did extra stuff like install a baby gate at the top of our stairs, and came back to do some touch ups after we moved in.  After we moved in I was also concerned about the type of baseboard heater that was installed in our basement (dangerous opening for children), and Omar came back to install a different one at no charge.  They also ran into some issues and had their work cut out for them moving our upstairs toilet, but he said he would compelete the job he promised at no additional charge, eventhough it turned out to be a lot more work and effort for them than anticipated.  

There were some increases in price due to things we added on, upgrades for a better carpet (we didn't like the builder grade), and we added on extra wiring for speakers.  The subcontractor Juan Carlos knew a lot about electronics and did a great job!  Despite our add-ons and changes they still stayed pretty on-target for the finish date.  And Omar was very clear about what increases in charges would be made and what was included in pricing, and what items we would have to buy ourselves."
Basement Kitchen Renovation and Flooring
Custom made Basement Kitchen Built-ins and Painting
Basement Bedroom Built-ins
Before House Renovations
During Renovations

+15

Response time1 day
8 neighbors recently requested a quote
Recommended by93%of homeowners
...
Showing 1-10 of 493
Subcontractors questions, answered by experts

A designer is a great choice for remodeling projects that don’t require significant structural work. For remodeling that includes structural work like removing load-bearing walls, altering exterior walls, or adding on a room, an architect can design and execute the renovations while ensuring your home remains structurally sound.

Yes, professionals offer design services that ensure cohesive appearances.

Yes, modular homes offer a wide range of customization options for layout, finishes, and features.

When conducting space planning, building codes and regulations need to be considered. As long as you are taking them into account and discussing them with the architect, you should be able to do your space planning appropriately.

The only real drawback to green building is that it’s more expensive up front, with per-square-foot prices sitting 33% higher than what you’d pay to build a traditional home. The higher cost is due to more expensive building materials and more labor to ensure every aspect of the home is as efficient as possible. However, green buildings often save money in the long run, so this is just a temporary downside.

The Clarksburg, MD homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.