Top-rated subcontractors.

Get matched with top subcontractors in Adamstown, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Adamstown, MD?

Select your specific project to find the pro for you.

TRUSTED BY ADAMSTOWN, MD HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon1.4k+
    Verified subcontracting services reviews

Find Subcontractors in Adamstown

Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.7(
335
)
Major Home Repairs (General Contractor)

Serving Adamstown, MD and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"The master bathroom renovation process we experienced was frustrating and plagued with many unnecessary delays and quality control breakdowns. Having gone through numerous home improvement projects, we carefully researched companies and selected VKB Kitchen and Bath in large part because of the overwhelmingly positive reviews we read on numerous websites, including Angie’s List. Unfortunately, the company we worked with bore little resemblance to the glowing reviews we read. While we are ultimately happy with the finished product, we do not feel anyone should experience the frustrating ordeal we went through to have a bathroom renovated. Consequently, we cannot recommend VKB Kitchen and Bath. We signed a contract with VKB on March 17, 2016, to perform a complete renovation of our master bath. The project was to follow the VKB designer’s specifications, and was to be substantially completed in 2 weeks—their estimate, not ours—with minor items to be addressed in a final third week. The actual renovation began on April 19th, a week later than originally planned. From the beginning, we experienced problems. VKB gave us access to an automated project management tool to check on the job’s status, see what work was scheduled each day, see any change orders for modifications made during the renovation, and communicate any questions or concerns through its message board. VKB was to use the tool to communicate progress, work schedules, and responses to our questions. If actually used and kept current, it would have been a helpful resource to monitor the job’s status and any slippages. However, VKB rarely used it, and when it was used, it presented grossly inaccurate information (ex., noting tasks as “completed” when they had not been started or were well behind). Toward the end of the job, after numerous delays and a turnover in the subcontractor VKB hired to perform the work and the reassignment of the project manager, the lead designer—Joe—used the messaging feature more frequently to timely respond to our questions or concerns and to better inform us as to the new sub-contractor’s work schedule. Demolition of the old master bathroom took several days, primarily because most of the work was done by one worker. This pattern continued during construction of the new bathroom. Each day, several workers would show up to unload equipment, but then typically most would go to another job site, leaving just one person to handle much of the work. We were told that the crew would begin work between 8 a.m. and 9 a.m. and would work full days as long as there was work to be done, yet for the vast majority of the time the initial subcontractor was involved, the crew would not show up until 10 a.m. or later, and would usually leave between 3 and 4 p.m. There were days when no one showed up and we were not notified that no one would be coming that day, despite there being ample work. The lack of sufficient workers and erratic work hours were major factors in the job quickly falling behind schedule. When we raised concerns about job slippages to VKB’s project manager, he dismissed our concerns. Serious communication issues existed between the subcontractor and VKB’s project manager which led to mistakes and delays. For example, one key design decision prior to commencement of the renovation was the removal of a ceiling and wall bulkhead to allow for more open space. The bulkhead wall contained a ventilation register which had to be removed and rerouted through a toe-kick in one of the new vanities. Due to miscommunications, the subcontractor tiled over the ventilation opening on the floor. The crew had to subsequently pull up newly-installed tile to create a ventilation path and install a new vent. However, because of the manner in which this ventilation path was constructed, the floor register did not fit properly flush with the tile floor. It still does not fit properly to this day. To be fair, issues arose which contributed to delays in the job that were not originally anticipated. For example, when the subcontractor finished the demolition, he noted that the floor was not completely level. To his credit, he took steps to fully level the floor, which took a day to complete. Additionally, in designing the new bathroom, the designer envisioned shifting the position of the toilet. As the job progressed, the subcontractor and project manager realized this would not work without extending a wall. We agreed with this change, which added another day to the project. Finally, we were scheduled to be out of town beginning in mid-May, which resulted in the crew not being able to work on the job for 10 days. Yet, had the job met the original contracted timeframes, it should have been completed nearly 2 weeks prior to our trip. When little additional progress had been made 2 weeks after our return, VKB reassigned the project manager and Joe, our lead designer, fired the subcontractor and brought in a new subcontractor to complete the bathroom renovation. However, this subcontractor had to work us into his existing jobs, putting a strain on his crew. To further complicate the new subcontractor’s job, there were numerous instances in which materials delivered were either defective or incomplete. For example, a large wood linen cabinet was unfinished on one side, resulting in VKB having to order a piece to finish the side. Additionally, the cabinet, and two vanities that were to be installed were supposed to have two side-by-side doors. When we inspected the delivered cabinet and vanities, we found that they had single doors. After noting this to VKB, we were told that the manufacturer did not make vanities that had two side-by-side doors, though they were in VKB’s design and the contract specified them. When we noted this would be problematic with respect to the linen cabinet given its placement in the bathroom, VKB said the cabinet could have side-by-side doors but it would require re-ordering them. We later found out that any re-ordering of items would require 2-to-3 weeks from the time of ordering until the items would arrive. While a 2-to-3 week delay was bad enough given the significant slippages already incurred, it turned out that VKB also misjudged other wood materials needed from this same manufacturer to complete the cabinet and vanity installation–such as trim and crown molding we had requested prior to commencement of the renovation–which resulted in another several weeks of delays. The end result of these missteps was that the new subcontractor had to pull out on two occasions for a period of 2 weeks each to allow time for new and/or replacement parts to arrive. Additionally, VKB twice sent out a separate crew to install the shower door and glass, and each time, the crew had to leave without performing the installation because work on the shower was not sufficiently complete for them to install the glass. When they were finally able to attempt the installation, they discovered an error in the manufacturing of one side of the glass. They had to reorder the side, resulting in yet another delay. Perhaps most disturbing is that the door and glass had been ready for weeks, yet no one checked them to ensure the manufacturer had completed them to specification. Other examples of this abound, including delivery of bathroom sinks and countertops which were not properly made and hardware for the cabinet and vanities, which were missing handles. Many of these problems could have been prevented or at least detected and addressed earlier had VKB had an effective process in place to ensure all materials ordered from vendors were inspected for both quantity and quality as soon as they were received. As a result of these problems, our master bathroom renovation—which was to have taken at most 3 weeks—took nearly 4 months to complete. Final work was completed on August 8th. Even at that, we ultimately settled for certain things simply to end the ordeal and move on. For example, the floor register that had been improperly installed by the initial subcontractor was never properly resolved by VKB—its solution was to cut the register bottom"
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
4 neighbors recently requested a quote
Recommended by91%of homeowners
Avatar for Arms Home Improvement
Arms Home Improvement
5.0(
45
)
Major Home Repairs (General Contractor)

Serving Adamstown, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2013

Free estimates

Warranties offered

ARM’s Home Improvement has been in business since 2013. After 26 years of working for the same home improvement/construction company, working his way to Vice President, Allen Metcalf, 4th generation carpenter, started Arm’s Home Improvement Company. At ARM's Home Improvement, we believe in providing the highest quality work, timeliness, clear communication throughout the entire process and client satisfaction. We specialize in residential construction, such as kitchen and bathroom remodeling. We can help you conceptualize your visions and turn them into reality. Please contact us today to schedule your free in-home estimate! We can show you 3D walk-through of your kitchen, bath or basement remodel. We are also a LEAD SAFE RENOVATOR. See more pictures and visit us on our Facebook page https://www.facebook.com/ArmsHomeImprovement/

Finished Carpentry and Woodworking Project
Finished Carpentry and Woodworking Project
Finished Carpentry and Woodworking Project
Finished Carpentry and Woodworking Project
Finished Carpentry and Woodworking Project

+359

Response time5 hrs
1 neighbors recently requested a quote
Recommended by95%of homeowners
Avatar for E&V remodeling innovation
E&V remodeling innovation
5.0(
17
)
Major Home Repairs (General Contractor)

Serving Adamstown, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Emergency services offered

Our mission is to be a provider that brings back the personal touch with our customers. We will build a relationship that will last a lifetime after you see our quality work. As a locally owned and operated business, we feel invested in our clients and constantly strive for customer satisfaction. Call or message us to schedule an estimate today!

Framing Project
✨
Framing Project
Deck
Deck

+3

Response time2 days
Response rate86%
Recommended by29%of homeowners
Avatar for MARVEL HOMES LLC
MARVEL HOMES LLC
4.9(
43
)
Major Home Repairs (General Contractor)

Serving Adamstown, MD and surrounding areas

Approved

In business since 2002

Warranties offered

Customers say: True professional

"When our renovation project fell apart, we heard of Marvel Home Improvement through friends who had used Devin's services and were very satisfied with the experience. We checked several references, all of which were glowing. We asked Devin, the owner of the business who serves as general contractor for all projects, to assess the condition of our house and advise us on how to fix it and complete the project. The house was empty and unlivable at the time. We needed a contractor who could accurately provide a timeline, a good cost estimate and contracting process. Marvel has a reputation for on-time delivery and excellent cost and project management. Devin impressed us with his experience and responsiveness. He quickly also referred us to an excellent architectural designer who helped us to move forward with fixing design issues and finalizing a design. Devin's team started the project on schedule. The workers were courteous, tidy, and respectful of the property every single day. They cleaned up the job site at the end of the day and worked quickly and competently throughout the day. All sub-contractors on the project obviously had long-established, positive professional relationships with Devin. From the painters to the flooring company to the tile installer to the electrician to the mason who built a stone fireplace, the subcontractors provided pricing and service that obviously reflected an outstanding relationship with Marvel Homes. Devin also provided accurate updates on costs on a regular basis and made excellent suggestions on where/how to save money without sacrificing quality. He personally arrived on the job site daily. When questions or issues inevitably arose, he addressed them immediately. He communicated with us on a daily basis, never hesitating to let us know the status of the project or about any structural or materials issues. As a result, we were well-informed throughout the project. Devin is also outstanding at on-time delivery. He provided a schedule of work at the start of the project and then emailed us regularly to make sure that we were making decisions and keeping up with the project. He often collected information for us about pricing and delivery times and dealt directly with materials providers, ensuring that the project would stay on track. The choreography of the work was a great demonstration of strong organizational and time management. Most importantly, we will actually be sorry for the project to end, as we've enjoyed working with Devin so much. He is a rare blend of integrity, humor, competence, personal responsibility and experience. We went from disappointment and despair about our home renovation, to great satisfaction at the beautiful work that has been done. We endorse Devin and Marvel Homes without reservation and will hire them again should the need arise."
Before 2
After 2
Exterior
Exterior
Exterior

+8

Recommended by100%of homeowners
Avatar for Home Breakthrough LLC
Home Breakthrough LLC
4.6(
193
)
Major Home Repairs (General Contractor)

Serving Adamstown, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2004

Free estimates

Warranties offered

"

After reading the glowing reviews on Angie's list and meeting with Francisco I had very high hopes for this company.  There were too many ups and downs in our remodel to even go into all of them, but I will do my best to highlight the most important.  I don't know if they were just going through a rough patch during our renovation, but the prior reviews did not at all reflect our experience.    Lets start with the positives.

Pros:

1. The final product of our bathroom is beautiful

2. The subcontractors who did the tile work and drywall/painting were excellent.  I LOVE our tile work. 

3. When mistakes were made they seemed to genuinely be sorry and tried to make things right

4.  They were neat and conscientious about cleaning up

Cons:

1. Project cost twice as much as original estimate--we were expecting to spend around 12k for this and ended up costing 24k (probably more because I stopped counting small charges from home depot on my card after a certain point).  There were some changes to the plan along the way which we agreed to and some unexpected things that came up--that happens.  Just way more than we were expecting to spend. 

2.  Project took 4 months to be completed.  We were quoted 2-3 weeks.  This was for various reasons--some of which were out of their control (vendor issues--but vendors they recommended) and some were within their control (i.e. ordering the wrong thing, installing things wrong, not realizing the wrong thing had been ordered even though it was sitting there for weeks).  Even at the end when there was just a few things to be done, it kept getting put off.  It felt like the remodel that would not end. 

3.  Lack of design ahead of time.  There was no clear design ahead of time which led to scrambling on the back end.  For example, we ordered  toilet topper and then they tell me at the end that the wall cannot support one and acted like I should have known this.  There was no place for towel racks. We eventually found work arounds for these issues, but a design would have been hugely helpful.  I should have known better, but I thought that Francisco was the designer and would have planned for this.  I take 50% responsibility for this one.

4. Things done wrong, sometimes more than once.  I'll just give the most egregious example here.  OK, so the first time they installed our shower door it was not correct and the pieces came unglued within days.  I notified them of this--they were planning to come fix it, but not urgently bc they were busy. Fast forward several days--the glass shower door falls off the track while I'm in the shower and shatters in a million pieces resulting in some minor cuts on my legs and feet.  To their credit, they cleaned up the glass that morning and were extremely apologetic.  I forgave them because they so quickly tried to make it right.  Then several weeks later once the new door comes, they install it wrong--again!  I can tell this just by looking at it.  I call Francisco and he explained that the person who installed it had never done it before--WHAT???!! This was a shower door that THEY recommended and it had already broken once and they send someone who has never done it to install it?  This is inexcusable to me.  So came a third time and installed it right. 

I personally would not use them again, only because the thought of going through all that again gives me palpitations.  But the final product was good, so I would not say that no one should use them.  Again, I got the impression that it was a busy and tumultuous time for their business so this may not be typical.   I would recommend getting a clear design ahead of time, be flexible on time and money (which probably is true for any job like this) and double check things yourself.  




"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+7

Response time1 day
17 neighbors recently requested a quote
Recommended by91%of homeowners
Avatar for Absolute Building and Construction
Absolute Building and Construction
4.9(
8
)
Major Home Repairs (General Contractor)

Serving Adamstown, MD and surrounding areas

Approved

In business since 2008

Free estimates

Warranties offered

Absolute Building and Construction has steadily grown from a small construction company, begun in 2000. We construct and manage projects ranging from minor interior renovations to some of the most complex commercial, public and industrial facilities in our region. Our approach to each project is always cooperative with client and designer satisfaction as the determining factors for success. Our innovative approach to pre-construction services and our self-performed capabilities allow us to deliver solutions that most often exceed our clients expectations. Our reputation is our greatest asset. We know that our reputation is built each and every day by the way we treat our clients, design teams and vendors. At Absolute Building and Construction, our employees are committed to our mission of, Achieving excellence in construction while enhancing the lives of all involved. This means holding ourselves to the Absolute highest ethical and professional standards, always doing what is fair. \nCall us today for your Remodeling needs!\n\nAll electrical and plumbing services are subcontracted out to properly licensed companies

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+50

Response time2 days
2 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Expro Renovators llc
Expro Renovators llc
4.7(
12
)
Major Home Repairs (General Contractor)

Serving Adamstown, MD and surrounding areas

Approved

In business since 2021

Free estimates

Credit card accepted

With Expro Renovators you have the ability to accomplish all your renovations projects, with 20yr experience business owner in the renovation industry, we provide you with the best quality work. From small jobs to big projects , interior / exterior residential and comercial renovation service . With Expro renovators your project is insured and protected . Expro renovators also provides you the home flipping service if you want to buy - fix and sell . Just call us for a free quote , we be glad to work with you

General Remodeling Project
Kitchen and Bath Remodeling Project
General Remodeling Project
Kitchen and Bath Remodeling Project
Basement Remodeling Project

+113

Response time6 days
Response rate90%
4 neighbors recently requested a quote
Avatar for Custom Home Creations LLC
Custom Home Creations LLC
5.0(
8
)
Major Home Repairs (General Contractor)

Serving Adamstown, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Warranties offered

Custom Home Creations was founded with a simple belief: every homeowner deserves a space that reflects their life, their style, and their dreams. Owners Justin and Garrett built the company around craftsmanship, honesty, and a personal approach to every project. We take the time to listen, plan carefully, and deliver custom solutions designed to fit your needs and vision. From the first conversation to the final walk-through, we treat every home as if it were our own. More than just beautiful spaces, we’re proud to build lasting relationships based on trust, care, and quality.

New Market Deck 1
New Market Deck 2
Laundry Area
Primary Bedroom
Hallway

+27

Response time1 day
Response rate96%
2 neighbors recently requested a quote
Avatar for Miracle Contractors LLC
Miracle Contractors LLC
4.6(
10
)
Major Home Repairs (General Contractor)

Serving Adamstown, MD and surrounding areas

Approved

In business since 2006

Free estimates

Emergency services offered

Miracle Contractors is a family owned construction company with over 25 years experience. We were first established in 2006 by Company Owner Carlito Mitchell.\n\n"Where Doing the Perfect Job isn't a Miracle, it's a Standard" \n\n\n\nWhere Doing The Perfect Job Isn't A Miracle, It's A Standard !\n\n

Remodeling - Sunrooms & Patio Enclosures Project
Remodeling - Sunrooms & Patio Enclosures Project
Remodeling - Sunrooms & Patio Enclosures Project
Response time3 days
Response rate90%
5 neighbors recently requested a quote
...
Showing 1-10 of 343
Subcontractors questions, answered by experts

You likely need to hire an architect for your new house design and build, unless you have the design skills and experience with building regulations and standards needed to get your plans approved. If you are able to meet the design requirements, you can hire a draftsperson to create the blueprints for the builders to follow.

While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.

Costs depend on material, size, design complexity, and additional features like lighting or seating.

Costs depend on project complexity, materials, labor, permits, and required revisions.

Make sure you’re getting the right size to meet your space needs, including enough space both side to side and vertically to accommodate your RV’s features and allow you to safely move it in and out of the garage. 

If you’re building an attached and enclosed garage for your RV, you’ll also want to give some thought to whether you’d like to add workspace, water or electricity, or additional storage. If so, you’ll need a garage with larger dimensions.

The Adamstown, MD homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.