Install Above Ground Pools questions, answered by experts

Depending on where you live and the demand for pools and spools, a spool may increase your property value and make your home more appealing to potential buyers. It’s worth looking at installation, maintenance, insurance, and safety costs to see if the increase in value is worth the cost of installing a spool.

The steps to fill a swimming pool will depend on your local building codes. However, it starts with draining the pool of all water using a submersible pump. Then your pro will lift the pool shell from the ground or break it into pieces for individual removal. The next step is filling the cavity with dirt and gravel and topping it with topsoil. Once a structural engineer deems the site safe, landscaping can start.

There are some disadvantages to a salt water pool. Besides costing slightly more than chlorine pools, salt water pools require a lot of salt. It's also harder to find a professional with salt water pool experience to do minor maintenance and repairs. Salt water can also damage some materials, so you’ll need to use specific heating, fixtures, lighting, liners, and masonry when building a salt water pool.

Concrete pools have the longest life span. As long as you properly maintain your concrete pool, you can expect it to last 50 to 100 years. That said, you will need to resurface your concrete pool as it ages. Fiberglass is durable, but fiberglass pools generally only last around 25 to 30 years. That said, some high-end fiberglass pools can last more than 50 years if they’re well-maintained.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Glendive, MT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.