Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Fairview, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Fairview, MT?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Fairview

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Fairview, MT and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

Rectangular pools are the most popular inground pool shape, due to their adaptability to different uses, from swimming laps to hosting parties. These pools can easily include other sought-after features, such as tanning ledges, waterfalls, sport nets, and more. Rectangular pools are also often easier to install and maintain, and prefabricated rectangular pools generally have a shorter installation time, so you can start enjoying your pool faster.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

While you can use a grounding rod when bonding an in-ground pool, that’s necessarily the best option. A grounding rod is an older grounding method that’s not usually used anymore, thanks to modern electrical design and services. Again, if you don’t have electrical experience, your best and safest bet is to hire a pool electrician.

Pool concrete or gunite can take several weeks to cure, or an average of 30 days, before workers can resume construction. Additional work and finishes push the time to build a pool out of concrete to between three and six months. There are many types of pools that take far less time, so keep these in mind if you're on a short timeline.

Yes, pool designs can be customized to accommodate specific preferences, allowing for unique shapes, personalized tiling, special lighting features, water fixtures, and varying depths to create bespoke leisure experiences.

The Fairview, MT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.