Top-rated basement remodelers.

Get matched with top basement remodelers in Tucson, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Tucson, AZ?

Select your specific project to find the pro for you.

Find Basement remodelers in Tucson

Avatar for iCrown Homes
iCrown Homes
4.5(
192
)
Basement - Remodel

Serving Tucson, AZ and surrounding areas

In business since 2008

Free estimates

Credit card accepted

"WOW, WOW, and WOW!!! Dana and his crew did a fantastic job! They arrived on time and did what they said they would. The crown molding was really the "crowning touch" for our home. We had no idea how plaln everything looked until it was completed. (I will be adding photos)...EVery room looks gorgeous. The real "Crowning touch" is the way all the corners look, They stand out and really add a decorative touch to the rooms. They moved furniture and did not make any demands on us to be furniture movers etc. Then after, they cleaned up and put everything back the way it was. (I can't get house painters to do that) You really will not be disappointed if you call them."
Vaulted Ceilings
Tony's House
Custom Ideas
Additional Photos
Recommended by91%of homeowners
Avatar for AAA COMPANIES INC.
AAA COMPANIES INC.
4.3(
29
)
Basement - Remodel

Serving Tucson, AZ and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"They came actually early , got a call said they could come early would it be okay , it was great for us ! They did a great job . Fix the pipe quickly efficiently and in less time than expected . Miguel was extremely polite and professional would do business with them anytime . Very grateful for the great job .  The price we paid included parts doesn't get much better than that ."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+33

Recommended by92%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Tucson, AZ and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 45
Basement Remodel questions, answered by experts

Yes, most general contractors require an initial down payment, typically between 10% and 25% of the total project cost. This upfront payment helps cover the costs of materials, permits, and subcontractors. The remaining project costs are usually billed after specific project milestones are reached or on set completion dates, as outlined in your contract. Be wary of contractors who require a significant deposit of 50% or more upfront, as this could be a red flag for a scam.

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

If you don’t have a crawl space but have a partial basement you want to make deeper, you can expect to spend a little less—between $40,000 and $90,000 on average. However, if you’re not adding new finished square footage, you won’t see much in the way of ROI.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Tucson, AZ homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.