Top-rated basement remodelers.

Get matched with top basement remodelers in Amado, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Amado, AZ?

Select your specific project to find the pro for you.

Find Basement remodelers in Amado

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Amado, AZ and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Thunder Ridge Industries, Inc.
New to Angi
Basement - Remodel

Serving Amado, AZ and surrounding areas

In business since 2002

Thunder Ridge Industries, Inc., Is a licensed general contractor for both residential and small commercial business. We build custom homes, Monolithic Homes, additions, remodels, garages, decks, sunrooms, and all remodels. We build the future now with superior workmanship and materials, the newest technology with oldworld craftsmanship to last and last. Please see our website at www.domehomedepot.com

Basement Remodel questions, answered by experts

Key trends include home gyms, theatre rooms, additional rooms (bedroom/office), and more, with personalized styles reflecting individual preferences.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

The Amado, AZ homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.