Top-rated basement remodelers.

Get matched with top basement remodelers in Arivaca, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Arivaca, AZ?

Select your specific project to find the pro for you.

Find Basement remodelers in Arivaca

Avatar for Shepherd Contracting
Shepherd Contracting
5.0(
15
)
Basement - Remodel

Serving Arivaca, AZ and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"Shepherd Contracting goes above and beyond- Thomas and his team were polite, efficient, and did outstanding work on a home remodel for a design client. My client and I were thrilled with the quality and attention to detail. An added bonus-they finished on time and within the budget!"
My jobs
My jobs
My jobs
My jobs
My jobs

+40

7 neighbors recently requested a quote
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Arivaca, AZ and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Alyar Investments, LLC
Alyar Investments, LLC
3.8(
11
)
Basement - Remodel

Serving Arivaca, AZ and surrounding areas

In business since 1998

"They were initially very good about taking care of everything and being neat. But after fixing one leak new ones occured and it took forever to get them to come back and fix the new leak. When they finally did, there was ANOTHER leak in a new place. Now I have to call them AGAIN to fix this new one. They also never finished one of the projects from the first job."
Recommended by60%of homeowners
Double B Builders LLC
New to Angi
Basement - Remodel

Serving Arivaca, AZ and surrounding areas

In business since 1998

Double B Builders specializes in renovations, remodels and construction. Dan Boveington has been building in the Tucson area for over 32 years.\n\nWe maximize value! Double B Builders provides premier quality and service and for less than our competitors. Double B Builders specializes in remodels, additions, and renovations. Our Remodel Management Specialists have an average of over 20 years construction and remodel experience and are led by Daniel Boveington, Founder, with over 32 years in the construction industry.

Showing 1-10 of 12
Basement Remodel questions, answered by experts

Anything having to do with the structure of your home, such as raising the ceiling, is usually the most expensive part of finishing a basement. Another project component that could be a surprisingly high expense is adding an exterior entrance. 

The cost of a walkout basement can be anywhere from $5,000 to $35,000.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes, most general contractors require an initial down payment, typically between 10% and 25% of the total project cost. This upfront payment helps cover the costs of materials, permits, and subcontractors. The remaining project costs are usually billed after specific project milestones are reached or on set completion dates, as outlined in your contract. Be wary of contractors who require a significant deposit of 50% or more upfront, as this could be a red flag for a scam.

A finished basement does not always count as square footage, as this varies by state regulations. In areas that allow below-grade spaces to be included in a home's official square footage, the basement must typically meet certain conditions. These conditions often include having a functional egress and being a livable space with flooring, finished walls, and temperature control. To be certain, contact your local assessor to confirm your area's specific policies regarding basement square footage.

Yes, adding a walkout basement will usually bump up your property value. Most homeowners prefer walk out basements because the exposed wall that’s level with the ground provides more utility via a ground-level exterior entrance, and they can fit full windows, which adds natural light and ventilation to the basement area. The only exception might be in areas prone to tornadoes, as walkout basements aren’t as safe as regular basements during a tornado, particularly if they include large windows or glass sliding doors.

The Arivaca, AZ homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.