Top-rated basement remodelers.

Best basement remodelers near Marana, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Marana, AZ?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Marana - Updated Nov 2026

Avatar for Shepherd Contracting
Shepherd Contracting
5.0(
15
)
Basement - Remodel

Serving Marana, AZ and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"Shepherd Contracting goes above and beyond- Thomas and his team were polite, efficient, and did outstanding work on a home remodel for a design client. My client and I were thrilled with the quality and attention to detail. An added bonus-they finished on time and within the budget!"
My jobs
My jobs
My jobs
My jobs
My jobs

+40

4 neighbors recently requested a quote
Avatar for Handyman Connection of Pima County
Handyman Connection of Pima County
4.6(
40
)
Basement - Remodel

Serving Marana, AZ and surrounding areas

In business since 1997

Free estimates

Warranties offered

"The job was very well done, however I noticed that their was light coming through the door. Upon calling the Co. They were very quick to set up and appointment to repair this very minor problem. It was quite the job, however the Man that did it was very good and the clean up was excellent. I will do much business with these people in the future. I would recommend them to any of my friends. lyfordb"
Kitchen remodel 1
Kitchen remodel 2
guest bathroom
hall bathroom
Kitchen and Bath Remdoels

+1

Recommended by97%of homeowners
Avatar for AAA COMPANIES INC.
AAA COMPANIES INC.
4.3(
29
)
Basement - Remodel

Serving Marana, AZ and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"Service itself was excellent. Some trouble setting up appointment: AAA didn't not contact me to arrange appt as Angie's List said they would when I bought the discount coupon from them. (Don't know if this is Angie's List problem or problem with AAA.) But once the serviceman arrived, the service and attitude were excellent."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+33

Recommended by92%of homeowners
Showing 1-10 of 31
Basement Remodel FAQs, answered by experts

Lifting a house and adding a basement is one way to add usable square footage. Lifting or jacking a house is a complex process, and it can be expensive, not to mention that you won’t be able to live in your house while it’s lifted, due to safety concerns. Lifting a house should only be done by experienced professionals.

Since DIYing a basement remodel isn't typically advised, there are some ways that you can still save money on this project without putting yourself in danger. Some ways to save money on a basement remodel include:

  • Painting walls yourself versus including in the cost of the remodel 

  • Installing light fixtures yourself

  • Choosing prefabricated fixtures, like cabinets, over custom ones

  • Choosing a budget-friendly flooring option, like laminate or vinyl flooring, and add rugs where necessary

Yes, it is possible to turn a regular basement into a walkout basement. Doing so involves excavating the land around at least one side of your basement foundation, installing retaining walls to create a permanent below-grade area outside your home, and then cutting into the foundation to install an exterior door that leads out to the new space. This is an expensive and time-consuming project, but it can add a lot of value and utility to your home.

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Marana, AZ homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.