Top-rated basement remodelers.

Get matched with top basement remodelers in Saddlebrooke, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Saddlebrooke, AZ?

Select your specific project to find the pro for you.

Find Basement remodelers in Saddlebrooke

Avatar for Shepherd Contracting
Shepherd Contracting
5.0(
15
)
Basement - Remodel

Serving Saddlebrooke, AZ and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"Shepherd Contracting goes above and beyond- Thomas and his team were polite, efficient, and did outstanding work on a home remodel for a design client. My client and I were thrilled with the quality and attention to detail. An added bonus-they finished on time and within the budget!"
My jobs
My jobs
My jobs
My jobs
My jobs

+40

5 neighbors recently requested a quote
Avatar for Handyman Connection of Pima County
Handyman Connection of Pima County
4.6(
40
)
Basement - Remodel

Serving Saddlebrooke, AZ and surrounding areas

In business since 1997

Free estimates

Warranties offered

"The job was very well done, however I noticed that their was light coming through the door. Upon calling the Co. They were very quick to set up and appointment to repair this very minor problem. It was quite the job, however the Man that did it was very good and the clean up was excellent. I will do much business with these people in the future. I would recommend them to any of my friends. lyfordb"
Kitchen remodel 1
Kitchen remodel 2
guest bathroom
hall bathroom
Kitchen and Bath Remdoels

+1

Recommended by97%of homeowners
Avatar for AAA COMPANIES INC.
AAA COMPANIES INC.
4.3(
29
)
Basement - Remodel

Serving Saddlebrooke, AZ and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"Service itself was excellent. Some trouble setting up appointment: AAA didn't not contact me to arrange appt as Angie's List said they would when I bought the discount coupon from them. (Don't know if this is Angie's List problem or problem with AAA.) But once the serviceman arrived, the service and attitude were excellent."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+33

Recommended by92%of homeowners
Showing 1-10 of 31
Basement Remodel questions, answered by experts

Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.

Unless you have extensive experience in construction work, remodeling a basement is best left to a professional. There are several tasks associated with this project that require exact precision, including:

  • Replacing insulation 

  • Replacing carpet or other flooring 

  • Adding heating and cooling

  • Adjusting or adding walls and doors

  • Altering or adding plumbing elements

If any of these elements is done incorrectly, it could severely impact the quality of your basement remodel and be dangerous. Changing a basement often comes with code safety requirements, like egress windows and proper ventilation. Therefore, leaving it up to a professional is often the best decision.

You can paint your ceiling or install a drywall ceiling if the ceiling is unfinished, as they take up less headroom than drop ceilings. 

If there are pipes in the way of ceiling installation, you can do one of two things: reroute the pipes or adjust the installation to fit, which will cost extra.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

The Saddlebrooke, AZ homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.