Top-rated basement remodelers.

Get matched with top basement remodelers in Saddlebrooke, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Saddlebrooke, AZ?

Select your specific project to find the pro for you.

Find Basement remodelers in Saddlebrooke

Avatar for Shepherd Contracting
Shepherd Contracting
5.0(
15
)
Basement - Remodel

Serving Saddlebrooke, AZ and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"Shepherd Contracting goes above and beyond- Thomas and his team were polite, efficient, and did outstanding work on a home remodel for a design client. My client and I were thrilled with the quality and attention to detail. An added bonus-they finished on time and within the budget!"
My jobs
My jobs
My jobs
My jobs
My jobs

+40

6 neighbors recently requested a quote
Avatar for Handyman Connection of Pima County
Handyman Connection of Pima County
4.6(
40
)
Basement - Remodel

Serving Saddlebrooke, AZ and surrounding areas

In business since 1997

Free estimates

Warranties offered

"The job was very well done, however I noticed that their was light coming through the door. Upon calling the Co. They were very quick to set up and appointment to repair this very minor problem. It was quite the job, however the Man that did it was very good and the clean up was excellent. I will do much business with these people in the future. I would recommend them to any of my friends. lyfordb"
Kitchen remodel 1
Kitchen remodel 2
guest bathroom
hall bathroom
Kitchen and Bath Remdoels

+1

Recommended by97%of homeowners
Avatar for AAA COMPANIES INC.
AAA COMPANIES INC.
4.3(
29
)
Basement - Remodel

Serving Saddlebrooke, AZ and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"Service itself was excellent. Some trouble setting up appointment: AAA didn't not contact me to arrange appt as Angie's List said they would when I bought the discount coupon from them. (Don't know if this is Angie's List problem or problem with AAA.) But once the serviceman arrived, the service and attitude were excellent."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+33

Recommended by92%of homeowners
Showing 1-10 of 31
Basement Remodel questions, answered by experts

Yes, in most cases, finishing a basement is worth the cost. The project adds valuable, usable square footage to your home and typically provides a return on investment (ROI) of 70% to 75%. For example, an average basement refinishing project costing $32,000 could add between $22,400 and $24,000 to your property's value. The final value added depends on factors like your location, the quality of materials and workmanship, and the features you include, such as a living space, bedroom, or bathroom. To be officially counted in your home's total square footage, the finished space must comply with all local building codes, including requirements for points of egress. However, in areas prone to flooding, a finished basement might be seen as a liability by potential buyers and could potentially decrease your home's value.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

Efficient appliance positioning, optimizing existing plumbing, and sourcing energy-efficient materials reduce financial impact and increase sustainability.

Key trends include home gyms, theatre rooms, additional rooms (bedroom/office), and more, with personalized styles reflecting individual preferences.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Saddlebrooke, AZ homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.