Top-rated basement remodelers.

Get matched with top basement remodelers in Saddlebrooke, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Saddlebrooke, AZ?

Select your specific project to find the pro for you.

Find Basement remodelers in Saddlebrooke

Avatar for Shepherd Contracting
Shepherd Contracting
5.0(
15
)
Basement - Remodel

Serving Saddlebrooke, AZ and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"Shepherd Contracting goes above and beyond- Thomas and his team were polite, efficient, and did outstanding work on a home remodel for a design client. My client and I were thrilled with the quality and attention to detail. An added bonus-they finished on time and within the budget!"
My jobs
My jobs
My jobs
My jobs
My jobs

+40

4 neighbors recently requested a quote
Avatar for Handyman Connection of Pima County
Handyman Connection of Pima County
4.6(
40
)
Basement - Remodel

Serving Saddlebrooke, AZ and surrounding areas

In business since 1997

Free estimates

Warranties offered

"The job was very well done, however I noticed that their was light coming through the door. Upon calling the Co. They were very quick to set up and appointment to repair this very minor problem. It was quite the job, however the Man that did it was very good and the clean up was excellent. I will do much business with these people in the future. I would recommend them to any of my friends. lyfordb"
Kitchen remodel 1
Kitchen remodel 2
guest bathroom
hall bathroom
Kitchen and Bath Remdoels

+1

Recommended by97%of homeowners
Avatar for AAA COMPANIES INC.
AAA COMPANIES INC.
4.3(
29
)
Basement - Remodel

Serving Saddlebrooke, AZ and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"Service itself was excellent. Some trouble setting up appointment: AAA didn't not contact me to arrange appt as Angie's List said they would when I bought the discount coupon from them. (Don't know if this is Angie's List problem or problem with AAA.) But once the serviceman arrived, the service and attitude were excellent."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+33

Recommended by92%of homeowners
Showing 1-10 of 31
Basement Remodel questions, answered by experts

Permits may be required for major repairs, structural work, or electrical and plumbing restoration after a flood. Check with your local building department to determine permit requirements and associated fees for your flooded basement cleanup project. Obtaining the correct permits helps ensure work is done safely and up to code.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes, adding a walkout basement will usually bump up your property value. Most homeowners prefer walk out basements because the exposed wall that’s level with the ground provides more utility via a ground-level exterior entrance, and they can fit full windows, which adds natural light and ventilation to the basement area. The only exception might be in areas prone to tornadoes, as walkout basements aren’t as safe as regular basements during a tornado, particularly if they include large windows or glass sliding doors.

The Saddlebrooke, AZ homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.