Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Queen Anne, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Queen Anne, MD?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Queen Anne

Avatar for Robert & Son Paving
Robert & Son Paving
4.8(
91
)

Serving Queen Anne, MD and surrounding areas

Approved

Super Service Award Winner

In business since 1955

Free estimates

Credit card accepted

"Robert was very nice. He gave me an estimate, which included cutting out parts and replacing sections of my driveway, revealing the entire driveway and was able to do it in the same week. His men did a wonderful job and he came to check on them several times during the process. Highly recommend!!"
Paved
Paved
Paved
Seal Coat
Seal Coat

+38

Response time9 hrs
4 neighbors recently requested a quote
Recommended by73%of homeowners
Avatar for Landscape Artistry, LLC. - Trang ch  Facebook
Landscape Artistry, LLC. - Trang ch Facebook
4.2(
57
)

Serving Queen Anne, MD and surrounding areas

Approved

In business since 1997

Free estimates

Warranties offered

"Landscape Artistry, LLC did an amazing job on installing interlocking pavers and edgestone to create a new patio for us. Paul Ruggerio and his crew were extremely professional and expert in their work. They take pride in doing things right! They were always on time, neat and clean, and very hard workers. We were impressed with this company and we are pleased with the results of their efforts."
 Backyard Paradise
 Night Lighting
 Hanover Paver Driveway
 Retaining Wall and Plant
 Before

+33

2 neighbors recently requested a quote
Recommended by79%of homeowners
Avatar for JB Trakas Contractor, LLC
JB Trakas Contractor, LLC
4.6(
10
)

Serving Queen Anne, MD and surrounding areas

Approved

In business since 2017

Free estimates

Small jobs welcome

"The professional of this company came out early in the morning and was finished by two in the afternoon. My house is about 2000 ft.² they installed a full 6 foot vinyl fence around the perimeter of my home. I would highly recommend them for additional projects."
Fencing project
Fencing project
Fencing project
Fencing project
Fencing project

+6

Response time2 days
Response rate100%
Avatar for Bayside excavation & Hauling
Bayside excavation & Hauling
5.0(
2
)

Serving Queen Anne, MD and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Response time5 hrs
3 neighbors recently requested a quote
Recommended by100%of homeowners
...
Showing 1-10 of 145
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Yes, recycled asphalt driveway costs can be substantially lower than new asphalt. With new asphalt costing between $90 and $190 per ton, this option can cost as much as 10 times more than laying down asphalt millings.

Three inches is a great thickness for a residential asphalt driveway that sees minimal to moderate traffic from cars, SUVs, and pickup trucks. However, a thicker driveway can better withstand the weight of a heavier vehicle, such as a trailer or a recreational vehicle. If you drive a heavy vehicle on a thin driveway, you risk cracking and damaging it.

Driveway aprons typically range between four and seven inches thick, though your town's building codes will likely have specific requirements. Additionally, you may need to add a layer of permeable aggregate in the excavation below your paved apron to ensure proper stormwater drainage.

The Queen Anne, MD homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.