Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Rock Hall, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Rock Hall, MD?

Select your specific project to find the pro for you.

TRUSTED BY ROCK HALL, MD HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon25
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Rock Hall

Avatar for Evans Paving
Evans Paving
4.2(
85
)
Asphalt Paving - InstallAsphalt Paving - Repair or PatchAsphalt Sealing+1 more

Serving Rock Hall, MD and surrounding areas

Approved

In business since 1974

Free estimates

Emergency services offered

"Tom C. ⭐️⭐️⭐️⭐️⭐️ Excellent Service from Evans Paving, LLC I couldn’t be more impressed with the outstanding work Evans Paving did on our challenging driveway. They professionally paved over 1,500 feet of driveway, including two large parking pads, pitched driveway for water runoff and completely transformed our property. Their team didn’t just pave — they went the extra mile by removing and cutting away invasive tree roots that had destroyed the old driveway. The attention to detail was clear from start to finish, and they sealed the entire project beautifully, leaving us with a clean, smooth driveway. Every step of the project was handled with professionalism, quality and attention to detail at a very reasonable price. If you’re looking for quality work, a reliable crew, and a reasonable price, Evans Paving is the team to call. We already recommended them to our family and friends."
Tar n chip
Tar and chip driveway
Tar and chip
Parking lot
Parking lot

+17

Response time2 days
3 neighbors recently requested a quote
Recommended by88%of homeowners
Avatar for Bayside excavation & Hauling
Bayside excavation & Hauling
5.0(
2
)
Gravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Rock Hall, MD and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Response time5 hrs
Recommended by100%of homeowners
Avatar for AC Paving Company
AC Paving Company
4.5(
159
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessConcrete Driveways - Install

Serving Rock Hall, MD and surrounding areas

In business since 1975

Free estimates

Emergency services offered

"It was fabulous . They did such a great job. Joel was so customer focused . He really cared that everything was perfect . They finished in one afternoon . The price was was amazing . Joel was in the neighborhood doing my neighbors driveway and asked me if I was interested . Gave me an excellent price .on the spot started with in an hour . Great to work with and cleaned up after themselves ."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+26

Response time2 days
2 neighbors recently requested a quote
Recommended by94%of homeowners
Avatar for Accurate Asphalt LLC
Accurate Asphalt LLC
5.0(
18
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving Rock Hall, MD and surrounding areas

In business since 2016

Free estimates

Warranties offered

"Accurate Asphalt put my driveway in 4 years ago. I recently had a problem with a small spot on my driveway. I contacted Ace Cooper and he came out the next morning to take a look at it. He said he would fix it, no problem. The relief I felt was tremendous. I would highly recommend Accurate Asphalt for a driveway and for their follow up customer service."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+7

Response time3 days
Response rate100%
Recommended by100%of homeowners
...
Showing 1-10 of 167
Asphalt Driveways questions, answered by experts

While paving a driveway is possible to do as a DIY project, we don’t recommend it. Hiring a driveway professional to pave it will ensure that your driveway looks neat and clean and lasts for years to come, and it will also prevent a weak driveway and, potentially, damage to your foundation. Paving a driveway requires heavy machinery, and while you can rent the equipment needed, operating it close to your garage slab or around your home’s foundation can crack it and lead to structural issues. 

At a depth of two inches, a ton of asphalt covers around 80 to 100 square feet. However, the thicker the asphalt, the less surface area it will cover. That’s why measuring correctly is essential when estimating asphalt needs and costs to ensure you get enough material to cover your entire driveway, patio, or other asphalt surface.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Yes, with colored finishes and decorative stamping for a personalized touch.

The Rock Hall, MD homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.