Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Queenstown, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Queenstown, MD?

Select your specific project to find the pro for you.

TRUSTED BY QUEENSTOWN, MD HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon52
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Queenstown

Avatar for Accurate Asphalt, LLC
Accurate Asphalt, LLC
4.9(
37
)

Serving Queenstown, MD and surrounding areas

Approved

In business since 2018

Free estimates

Warranties offered

"We had our driveway paved. They gave a great price and the job was completed with 3 days. I would recommend this company to anyone looking to have their driveway paved. Excellent job."
2017 Peterbilt 389
On the Job
Logo
2005 Peterbilt 379
On the Job

+70

Response time2 days
Recommended by100%of homeowners
Avatar for JB Trakas Contractor, LLC
JB Trakas Contractor, LLC
4.6(
10
)

Serving Queenstown, MD and surrounding areas

Approved

In business since 2017

Free estimates

Small jobs welcome

"The professional of this company came out early in the morning and was finished by two in the afternoon. My house is about 2000 ft.² they installed a full 6 foot vinyl fence around the perimeter of my home. I would highly recommend them for additional projects."
Fencing project
Fencing project
Fencing project
Fencing project
Fencing project

+6

Avatar for Leading Edge Avelar Contractors LLC
Leading Edge Avelar Contractors LLC
4.2(
15
)

Serving Queenstown, MD and surrounding areas

Approved

In business since 2005

Free estimates

Credit card accepted

"This company was very professional, timely and responsive to install my 15x12 concrete pad. Oscar and Douglas provided knowledgeable and honest input as a few issues developed. I am very satisfied with the quality of work and would highly recommend them."
Concert porch
Adding a square of concrete
Side walk
Frame
Ready to pour concrete

+60

Response time1 day
8 neighbors recently requested a quote
Recommended by76%of homeowners
Avatar for Bayside excavation & Hauling
Bayside excavation & Hauling
5.0(
2
)

Serving Queenstown, MD and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Response time3 hrs
3 neighbors recently requested a quote
Recommended by100%of homeowners
...
Showing 1-10 of 162
Asphalt Driveways questions, answered by experts

Sometimes, when people talk about asphalt driveways, they’re actually referring to asphalt concrete, which is a completely different compound. Asphalt concrete is asphaltic cement combined with sand or grit. It is significantly more lasting and durable than regular asphalt but also much more expensive. If you’re considering using asphalt concrete, ask an asphalt company for their expert opinions.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Asphalt edging secures the sides of your driveway to prevent crumbling and cracking over time. Most driveways have edges with a 45-degree grading. This helps transfer some of the stress from the asphalt to the ground underneath. If your driveway doesn’t have proper edging, the pressure from your car may break down the edges over time.

Think of the street as a way to capture all the elements on either side of the road, including the road—a street encompasses the homes or other buildings, the trees, and the road of a given area as defined by the beginning and end of the street on a map. A roadway, however, is the component of the street where cars travel.

The Queenstown, MD homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.