Top-rated subcontractors.

Get matched with top subcontractors in Colmar Manor, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Colmar Manor, MD?

Select your specific project to find the pro for you.

TRUSTED BY COLMAR MANOR, MD HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon2.8k+
    Verified subcontracting services reviews

Find Subcontractors in Colmar Manor

Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.7(
339
)
Major Home Repairs (General Contractor)

Serving Colmar Manor, MD and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"The master bathroom renovation process we experienced was frustrating and plagued with many unnecessary delays and quality control breakdowns. Having gone through numerous home improvement projects, we carefully researched companies and selected VKB Kitchen and Bath in large part because of the overwhelmingly positive reviews we read on numerous websites, including Angie’s List. Unfortunately, the company we worked with bore little resemblance to the glowing reviews we read. While we are ultimately happy with the finished product, we do not feel anyone should experience the frustrating ordeal we went through to have a bathroom renovated. Consequently, we cannot recommend VKB Kitchen and Bath. We signed a contract with VKB on March 17, 2016, to perform a complete renovation of our master bath. The project was to follow the VKB designer’s specifications, and was to be substantially completed in 2 weeks—their estimate, not ours—with minor items to be addressed in a final third week. The actual renovation began on April 19th, a week later than originally planned. From the beginning, we experienced problems. VKB gave us access to an automated project management tool to check on the job’s status, see what work was scheduled each day, see any change orders for modifications made during the renovation, and communicate any questions or concerns through its message board. VKB was to use the tool to communicate progress, work schedules, and responses to our questions. If actually used and kept current, it would have been a helpful resource to monitor the job’s status and any slippages. However, VKB rarely used it, and when it was used, it presented grossly inaccurate information (ex., noting tasks as “completed” when they had not been started or were well behind). Toward the end of the job, after numerous delays and a turnover in the subcontractor VKB hired to perform the work and the reassignment of the project manager, the lead designer—Joe—used the messaging feature more frequently to timely respond to our questions or concerns and to better inform us as to the new sub-contractor’s work schedule. Demolition of the old master bathroom took several days, primarily because most of the work was done by one worker. This pattern continued during construction of the new bathroom. Each day, several workers would show up to unload equipment, but then typically most would go to another job site, leaving just one person to handle much of the work. We were told that the crew would begin work between 8 a.m. and 9 a.m. and would work full days as long as there was work to be done, yet for the vast majority of the time the initial subcontractor was involved, the crew would not show up until 10 a.m. or later, and would usually leave between 3 and 4 p.m. There were days when no one showed up and we were not notified that no one would be coming that day, despite there being ample work. The lack of sufficient workers and erratic work hours were major factors in the job quickly falling behind schedule. When we raised concerns about job slippages to VKB’s project manager, he dismissed our concerns. Serious communication issues existed between the subcontractor and VKB’s project manager which led to mistakes and delays. For example, one key design decision prior to commencement of the renovation was the removal of a ceiling and wall bulkhead to allow for more open space. The bulkhead wall contained a ventilation register which had to be removed and rerouted through a toe-kick in one of the new vanities. Due to miscommunications, the subcontractor tiled over the ventilation opening on the floor. The crew had to subsequently pull up newly-installed tile to create a ventilation path and install a new vent. However, because of the manner in which this ventilation path was constructed, the floor register did not fit properly flush with the tile floor. It still does not fit properly to this day. To be fair, issues arose which contributed to delays in the job that were not originally anticipated. For example, when the subcontractor finished the demolition, he noted that the floor was not completely level. To his credit, he took steps to fully level the floor, which took a day to complete. Additionally, in designing the new bathroom, the designer envisioned shifting the position of the toilet. As the job progressed, the subcontractor and project manager realized this would not work without extending a wall. We agreed with this change, which added another day to the project. Finally, we were scheduled to be out of town beginning in mid-May, which resulted in the crew not being able to work on the job for 10 days. Yet, had the job met the original contracted timeframes, it should have been completed nearly 2 weeks prior to our trip. When little additional progress had been made 2 weeks after our return, VKB reassigned the project manager and Joe, our lead designer, fired the subcontractor and brought in a new subcontractor to complete the bathroom renovation. However, this subcontractor had to work us into his existing jobs, putting a strain on his crew. To further complicate the new subcontractor’s job, there were numerous instances in which materials delivered were either defective or incomplete. For example, a large wood linen cabinet was unfinished on one side, resulting in VKB having to order a piece to finish the side. Additionally, the cabinet, and two vanities that were to be installed were supposed to have two side-by-side doors. When we inspected the delivered cabinet and vanities, we found that they had single doors. After noting this to VKB, we were told that the manufacturer did not make vanities that had two side-by-side doors, though they were in VKB’s design and the contract specified them. When we noted this would be problematic with respect to the linen cabinet given its placement in the bathroom, VKB said the cabinet could have side-by-side doors but it would require re-ordering them. We later found out that any re-ordering of items would require 2-to-3 weeks from the time of ordering until the items would arrive. While a 2-to-3 week delay was bad enough given the significant slippages already incurred, it turned out that VKB also misjudged other wood materials needed from this same manufacturer to complete the cabinet and vanity installation–such as trim and crown molding we had requested prior to commencement of the renovation–which resulted in another several weeks of delays. The end result of these missteps was that the new subcontractor had to pull out on two occasions for a period of 2 weeks each to allow time for new and/or replacement parts to arrive. Additionally, VKB twice sent out a separate crew to install the shower door and glass, and each time, the crew had to leave without performing the installation because work on the shower was not sufficiently complete for them to install the glass. When they were finally able to attempt the installation, they discovered an error in the manufacturing of one side of the glass. They had to reorder the side, resulting in yet another delay. Perhaps most disturbing is that the door and glass had been ready for weeks, yet no one checked them to ensure the manufacturer had completed them to specification. Other examples of this abound, including delivery of bathroom sinks and countertops which were not properly made and hardware for the cabinet and vanities, which were missing handles. Many of these problems could have been prevented or at least detected and addressed earlier had VKB had an effective process in place to ensure all materials ordered from vendors were inspected for both quantity and quality as soon as they were received. As a result of these problems, our master bathroom renovation—which was to have taken at most 3 weeks—took nearly 4 months to complete. Final work was completed on August 8th. Even at that, we ultimately settled for certain things simply to end the ordeal and move on. For example, the floor register that had been improperly installed by the initial subcontractor was never properly resolved by VKB—its solution was to cut the register bottom"
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
Response rate100%
2 neighbors recently requested a quote
Avatar for Elite Home Remodeling Group
Elite Home Remodeling Group
4.9(
37
)
Major Home Repairs (General Contractor)

Serving Colmar Manor, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2008

Free estimates

Warranties offered

At Elite Home Remodeling Group, LLC, we specialize in Kitchen and Bath Remodeling--is your premier remodeling company for all your home improvement needs. With over 14 years in the industry, we are dedicated to success and looking forward to doing business with you.

General Remodeling Project
Remodeling - Kitchen & Bathroom Project
Remodeling - General Project
Painting - Interior Project
Kitchen and Bath Remodeling Project

+25

Response time12 hrs
Response rate100%
8 neighbors recently requested a quote
Avatar for MARVEL HOMES LLC
MARVEL HOMES LLC
4.9(
43
)
Major Home Repairs (General Contractor)

Serving Colmar Manor, MD and surrounding areas

Approved

In business since 2002

Warranties offered

Customers say: True professional

"When our renovation project fell apart, we heard of Marvel Home Improvement through friends who had used Devin's services and were very satisfied with the experience. We checked several references, all of which were glowing. We asked Devin, the owner of the business who serves as general contractor for all projects, to assess the condition of our house and advise us on how to fix it and complete the project. The house was empty and unlivable at the time. We needed a contractor who could accurately provide a timeline, a good cost estimate and contracting process. Marvel has a reputation for on-time delivery and excellent cost and project management. Devin impressed us with his experience and responsiveness. He quickly also referred us to an excellent architectural designer who helped us to move forward with fixing design issues and finalizing a design. Devin's team started the project on schedule. The workers were courteous, tidy, and respectful of the property every single day. They cleaned up the job site at the end of the day and worked quickly and competently throughout the day. All sub-contractors on the project obviously had long-established, positive professional relationships with Devin. From the painters to the flooring company to the tile installer to the electrician to the mason who built a stone fireplace, the subcontractors provided pricing and service that obviously reflected an outstanding relationship with Marvel Homes. Devin also provided accurate updates on costs on a regular basis and made excellent suggestions on where/how to save money without sacrificing quality. He personally arrived on the job site daily. When questions or issues inevitably arose, he addressed them immediately. He communicated with us on a daily basis, never hesitating to let us know the status of the project or about any structural or materials issues. As a result, we were well-informed throughout the project. Devin is also outstanding at on-time delivery. He provided a schedule of work at the start of the project and then emailed us regularly to make sure that we were making decisions and keeping up with the project. He often collected information for us about pricing and delivery times and dealt directly with materials providers, ensuring that the project would stay on track. The choreography of the work was a great demonstration of strong organizational and time management. Most importantly, we will actually be sorry for the project to end, as we've enjoyed working with Devin so much. He is a rare blend of integrity, humor, competence, personal responsibility and experience. We went from disappointment and despair about our home renovation, to great satisfaction at the beautiful work that has been done. We endorse Devin and Marvel Homes without reservation and will hire them again should the need arise."
Before 2
After 2
Exterior
Exterior
Exterior

+8

1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for CHEVY CHASE REMODELING
CHEVY CHASE REMODELING
4.3(
222
)
Major Home Repairs (General Contractor)

Serving Colmar Manor, MD and surrounding areas

Approved

In business since 2000

Free estimates

Emergency services offered

"Chevy Chase Remodeling did an exterior renovation for us, including replacing our roof and siding, painting our house, replacing a window, and adding a new screened-in porch and patio in our backyard. They took care of the design work as well as arranging all the subcontracting to perform the construction work. The owner, Steven, and all the subcontractors were friendly, easy to work with, and professional. It took a while, as we expected, but they worked overtime to complete on time the one part of the project we needed done by a certain date. And they did a great job overall--we are very pleased with the final results. The house looks totally remade and the porch and patio are just what we were hoping for. We recommend them!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+10

Response time1 day
Response rate100%
15 neighbors recently requested a quote
Avatar for John Krause Construction
John Krause Construction
4.4(
169
)
Major Home Repairs (General Contractor)

Serving Colmar Manor, MD and surrounding areas

Approved

In business since 1998

Free estimates

Emergency services offered

"The job went well. Even small problems were handled. The contractor did need to oversee subcontractor for roof better. They agree. They kept me in the loop well most of the time and had numerous suggestions that were helpful. Big quality was top rate because the people doing the work where that type of crew. That makes all the difference for any job."
Pool House Exterior with Floor-to-Ceiling Windows & Doors, Two Pergolas, & Cupola with Windows
Modern Farmhouse Kitchen
Luxury Bathroom Renovation with Free-Standing Clawfoot Tub & Chandelier
Pool House - Side Entrance
Modern Farmhouse Kitchen with Farmhouse Sink, Pull-Down Faucet, Stainless Steel Range, Range Hood, Double Wall Oven, and Dishwasher

+113

Response time2 days
Response rate100%
14 neighbors recently requested a quote
Avatar for Omar's General Contracting
Omar's General Contracting
4.1(
196
)
Major Home Repairs (General Contractor)

Serving Colmar Manor, MD and surrounding areas

Approved

Super Service Award Winner

In business since 1988

Free estimates

Warranties offered

"It looks like we have a new house!  Everything looks very professional, excellent quality work.  They finished on time, with some minor touch-ups to be completed on the finish date.  We would definitely use him again.

Omar is very professional and courteous and knows a lot about construction.  They have great service, they always responded promptly to any requests, and any changes we asked for were made right away.  They went above and beyond to make us happy with the work.  Omar took a lot of time to make sure we were happy with the floor stain and paint colors and did lots of test patches for us. They did extra stuff like install a baby gate at the top of our stairs, and came back to do some touch ups after we moved in.  After we moved in I was also concerned about the type of baseboard heater that was installed in our basement (dangerous opening for children), and Omar came back to install a different one at no charge.  They also ran into some issues and had their work cut out for them moving our upstairs toilet, but he said he would compelete the job he promised at no additional charge, eventhough it turned out to be a lot more work and effort for them than anticipated.  

There were some increases in price due to things we added on, upgrades for a better carpet (we didn't like the builder grade), and we added on extra wiring for speakers.  The subcontractor Juan Carlos knew a lot about electronics and did a great job!  Despite our add-ons and changes they still stayed pretty on-target for the finish date.  And Omar was very clear about what increases in charges would be made and what was included in pricing, and what items we would have to buy ourselves."
Basement Kitchen Renovation and Flooring
Custom made Basement Kitchen Built-ins and Painting
Basement Bedroom Built-ins
Before House Renovations
During Renovations

+15

Response time1 day
7 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for D & H Demolition, LLC
D & H Demolition, LLC
5.0(
11
)
Major Home Repairs (General Contractor)

Serving Colmar Manor, MD and surrounding areas

Approved

In business since 2013

Free estimates

Emergency services offered

Leading the industry by providing a comprehensive service to residential & commercial clients in need of selective & structural demolition , hazardous material abatement and disposal , as well as mold remediation services. Call or click for your FREE estimate today!\n

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+9

Response time8 hrs
Response rate100%
8 neighbors recently requested a quote
Avatar for Pablo & Jr Construction
Pablo & Jr Construction
5.0(
8
)
Major Home Repairs (General Contractor)

Serving Colmar Manor, MD and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

Pablo & Jr Construction is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Life Science Logistics
Life Science Logistics
Life Science Logistics
Life Science Logistics
Life Science Logistics

+2

Response time6 hrs
31 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for City Renovations & Remodeling LLC
City Renovations & Remodeling LLC
4.0(
321
)
Major Home Repairs (General Contractor)

Serving Colmar Manor, MD and surrounding areas

Approved

In business since 1987

Credit card accepted

Customers say: True professional

"I highly recommend City Renovations and Remodeling to new and experienced homeowners and investors. In fact, Mike Wiggs, owner of the company, was highly recommended to me from a trusted source. Mike has been my designer, general contractor and project manager for over three years. He and his team of subcontractors for all the trades and handymen have successfully completed numerous projects for me. The internal big jobs included Mike and his team remodeling my basement into a permitted apartment with an egress window, injection well system, and recessed lighting; remodeling my kitchen into a larger space, better layout and upgraded appliances, cabinets, backsplashes (e.g., switching from an electric cooktop island to a slide-in gas range and installing a peninsula); changing the location of the sliding door and a set of windows in my sunroom for better flow and sightline from the front door entry to the patio door leading to my wooded backyard; replacing the damaged one of the two HVAC systems (i.e., one for the first floor and basement and the other for the second floor); and whole house interior painting and decorative touches (accent walls, trim, etc.) The external big jobs included Mike and his team resolving the sources of severe water damage to my two-story front door entry area and installing a new door, side lites and stoop. He resolved other water problems at my house by installing upgraded, larger gutters connecting to a new underground drainage system, and re-grading a section of the backyard next to my house in order to better collect water coming onto the house and move it away from the house. The other jobs Mike and his team completed include installing decorative lighting in the front of my house and security lighting at the sides and back; installing and repairing wooden privacy fencing in my backyard; washing away years of mold, mildew and stains from the siding of my house; and installing shelving for two closets and the laundry room to increase my storage space. After years of City Renovations and Remodeling successfully improving or repairing my home, I hired the company to help me with an investment rental property. Mike completed a walk-thru assessment and report to supplement the information from the home inspector and appraiser. Through my pre-purchase consultation with Mike, I got a good idea of what it would take improve the property given my goals and budget. I look forward to working with Mike and his team to renovate the property."
Basement Remodel
ISland
Custom Vanity & Backsplash
Custom Bathroom
Custom Bathroom

+225

Response time10 hrs
11 neighbors recently requested a quote
Recommended by84%of homeowners
...
Showing 1-10 of 517
Subcontractors questions, answered by experts

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

You likely need to hire an architect for your new house design and build, unless you have the design skills and experience with building regulations and standards needed to get your plans approved. If you are able to meet the design requirements, you can hire a draftsperson to create the blueprints for the builders to follow.

It is technically possible to draw your own blueprints, but the process is extremely involved and really demands help from an expert. A professional architect has an understanding of design elements, interior design, the functionality of different rooms in a home, and how everything from furniture, outlets, and light switches should be laid out to serve you and your family best. Hiring an architect for blueprints can get expensive, but it’s the most responsible way to begin a new construction project. If you’re keen on DIYing, you could consider starting the process and then having a professional take over.

You don’t have to commit to a complete home renovation to age in place comfortably—those can get pricey. Instead, focus on a few impactful changes. Consider adding a stair lift or installing ramps to eliminate barriers. Upgrading to non-slip flooring can prevent falls while adding brighter lighting can improve visibility throughout your home. These thoughtful updates can make your home much easier to navigate and enhance your comfort and safety without the stress and cost of a complete overhaul.

Yes, such as using eco-friendly materials and energy-efficient designs for long-term savings.

The Colmar Manor, MD homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.