Top-rated subcontractors.

Get matched with top subcontractors in Windsor, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Windsor, WI?

Select your specific project to find the pro for you.

TRUSTED BY WINDSOR, WI HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon2.3k+
    Verified subcontracting services reviews

Find Subcontractors in Windsor

Avatar for GF Company
GF Company
4.6(
152
)
Major Home Repairs (General Contractor)

Serving Windsor, WI and surrounding areas

In business since 1974

Free estimates

Credit card accepted

"we had a large double window two windows one opening replaced they did a a good job made that room much warmer in winter which is what we were after it is now the warmest room in the house in the winter which is good as it is the room we spend most our time in. will defiantly be having them out to price gutters when we are ready in the spring."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by93%of homeowners
Avatar for Kitchen & Bath Solutions, LLC.
Kitchen & Bath Solutions, LLC.
4.8(
19
)
Major Home Repairs (General Contractor)

Serving Windsor, WI and surrounding areas

In business since 2014

Free estimates

Credit card accepted

"About two years ago, the KBS team (including Alberto and Elizabeth) completed a remodel of our house to accommodate a family member with disabilities. They were fantastic: excellent communication, attention to detail, recommendations and project coordination. Super responsive and friendly, too! We are so happy with the results and had a really positive experience in the planning and remodel itself."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+65

Recommended by100%of homeowners
A O Handy
4.1(
133
)
Major Home Repairs (General Contractor)

Serving Windsor, WI and surrounding areas

In business since 2002

Free estimates

Emergency services offered

"At the end of the inspection I was positive that I was not going to use him. He gave me like a huge laundry list of things that needed to be done. After he was finished he said that it would cost me $15000. There was no way all of this going be $15000. It was like these little things he tarried about because he wanted to get paid as the coupons were so cheap. He had no suggestions about minimum cost. The thing about him was he did not give us any options, everything he gave was for us to do things. There are always levels of priority and I did not get anything at all from him."
Recommended by87%of homeowners
Avatar for Creative Painting
Creative Painting
5.0(
13
)
Major Home Repairs (General Contractor)

Serving Windsor, WI and surrounding areas

In business since 2017

Free estimates

"It was excellent. Their communication was good. The expectation was met. They got it done on time. They have good quality. I was the happiest I could be. I just referred him to a friend today."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

Recommended by100%of homeowners
...
Showing 1-10 of 60
Subcontractors questions, answered by experts

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

Designs typically take 2-6 months, depending on factoring, project size, and customization needs. Larger or more complex designs may require additional time for approval and revisions.

A pool builder can advise you on the best design for your property and vision, and can walk you through the process from design to a swim-ready pool. Knowing which questions to ask a pool builder can help ensure you choose the right person for the job.

The country's most famous Neoclassical architecture appears in major government buildings and college campuses. The White House is unmistakably the most famous example, though the Capitol Building and Thomas Jefferson's Monticello are also iconic uses of the design.

Universal design costs can be minimal when you add them during construction; however, adding universal design principles to existing homes can sometimes increase renovation costs. For example, a mid-grade bathroom remodel is estimated to cost around $30,000, while a standard universal design remodel can cost closer to $40,000. Adding accessible design components can include widening hallways ($500 to $2,000), curbless showers ($2,000 to $8,000), and widening doors ($400 to $800). Keep in mind that these increased costs can lead to higher resale values because universal homes may appeal to a wider variety of buyers.

The Windsor, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.