Top-rated subcontractors.

Get matched with top subcontractors in Rio, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Rio, WI?

Select your specific project to find the pro for you.

TRUSTED BY RIO, WI HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon154
    Verified subcontracting services reviews

Find Subcontractors in Rio

Avatar for GF Company
GF Company
4.6(
152
)
Major Home Repairs (General Contractor)

Serving Rio, WI and surrounding areas

In business since 1974

Free estimates

Credit card accepted

"I would totally recommend this company! Ariel went above and beyond for me when replacing my roof and gutters! Ariel would call me and let me know he was on the way or if he was running even 5 minutes behind. My house looks great and I will be using them again come spring to start replacing some of my windows. Thank you Ariel! Your crew was great, too."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by93%of homeowners
Avatar for Kitchen & Bath Solutions, LLC.
Kitchen & Bath Solutions, LLC.
4.8(
19
)
Major Home Repairs (General Contractor)

Serving Rio, WI and surrounding areas

In business since 2014

Free estimates

Credit card accepted

"About two years ago, the KBS team (including Alberto and Elizabeth) completed a remodel of our house to accommodate a family member with disabilities. They were fantastic: excellent communication, attention to detail, recommendations and project coordination. Super responsive and friendly, too! We are so happy with the results and had a really positive experience in the planning and remodel itself."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+65

Recommended by100%of homeowners
Avatar for PK Pro Contracting
PK Pro Contracting
5.0(
7
)
Major Home Repairs (General Contractor)

Serving Rio, WI and surrounding areas

In business since 1983

Credit card accepted

"They were great. I recently opened my new suite and needed flooring that wouldn’t ruin the base boards and the carpet. They did just that. They finished in a day and some hours. Also I needed them pretty last minute and he came asap and started working on the floors. It looks amazing. Highly recommend."
Before
After
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by100%of homeowners
Avatar for Madison Insulation and Mold Remediation
Madison Insulation and Mold Remediation
3.6(
82
)
Major Home Repairs (General Contractor)

Serving Rio, WI and surrounding areas

In business since 2012

"Arrangement for this was done earlier , he arrived with the time frame given.  Removing the old one and replacing it.  Checking to see it works well, and it still does.  He cleaned up after himself.  I had no problem with the replacement service with him."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+4

Recommended by79%of homeowners
Showing 1-10 of 35
Subcontractors questions, answered by experts

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

A floor plan is a less detailed illustration showing a building or room's layout from above, including elements like windows, doors, walls, and fixtures. It offers a simplified view for homeowners. In contrast, a blueprint is a more detailed, to-scale architectural drawing that includes all parts of the building plans, such as structural elements, construction details, and utility schematics. While a floor plan can be a type of view within a blueprint, the complete blueprint contains all the necessary details to turn the plan into a reality.

While you will always work with a team of professionals at some point during your home build, homeowners with experience can take on some part of the process. Manage the initial brainstorm, brief writeup, and floor layout phase with minimal assistance before contacting a general contractor. And while you can purchase stock blueprints for some home designs, it's always best to speak with professionals when choosing one ideal for your property.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

The Rio, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.