Top-rated subcontractors.

Get matched with top subcontractors in Cross Plains, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Cross Plains, WI?

Select your specific project to find the pro for you.

TRUSTED BY CROSS PLAINS, WI HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon3.1k+
    Verified subcontracting services reviews

Find Subcontractors in Cross Plains

Avatar for GF Company
GF Company
4.6(
152
)
Major Home Repairs (General Contractor)

Serving Cross Plains, WI and surrounding areas

In business since 1974

Free estimates

Credit card accepted

"we had a large double window two windows one opening replaced they did a a good job made that room much warmer in winter which is what we were after it is now the warmest room in the house in the winter which is good as it is the room we spend most our time in. will defiantly be having them out to price gutters when we are ready in the spring."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by93%of homeowners
Avatar for Kitchen & Bath Solutions, LLC.
Kitchen & Bath Solutions, LLC.
4.8(
19
)
Major Home Repairs (General Contractor)

Serving Cross Plains, WI and surrounding areas

In business since 2014

Free estimates

Credit card accepted

"About two years ago, the KBS team (including Alberto and Elizabeth) completed a remodel of our house to accommodate a family member with disabilities. They were fantastic: excellent communication, attention to detail, recommendations and project coordination. Super responsive and friendly, too! We are so happy with the results and had a really positive experience in the planning and remodel itself."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+65

Recommended by100%of homeowners
A O Handy
4.1(
133
)
Major Home Repairs (General Contractor)

Serving Cross Plains, WI and surrounding areas

In business since 2002

Free estimates

Emergency services offered

"At the end of the inspection I was positive that I was not going to use him. He gave me like a huge laundry list of things that needed to be done. After he was finished he said that it would cost me $15000. There was no way all of this going be $15000. It was like these little things he tarried about because he wanted to get paid as the coupons were so cheap. He had no suggestions about minimum cost. The thing about him was he did not give us any options, everything he gave was for us to do things. There are always levels of priority and I did not get anything at all from him."
Recommended by87%of homeowners
Showing 1-10 of 50
Subcontractors questions, answered by experts

Most Greek Revival architecture homes are one and a half to two stories, depending on the footprint, which sets them apart from some Federal architecture homes that are three stories. The gabled roof on the second floor can sometimes cut into the living space, especially on smaller homes of this style, which leaves a much smaller living area upstairs.

Services include creating technical drawings, floor plans, and 3D renderings for construction or renovation projects.

No, it’s not legal for unlicensed individuals to conduct structural calculations for buildings or building repairs. Not only do licensing requirements prevent DIYers from tackling this project, but mistakes can also be extremely dangerous and put your property and anyone inside or near it at risk of severe injury or even death. You should always hire a licensed and certified local structural engineer to make structural calculations.

Buying a house is easier than building one from scratch. Buying an existing home is almost always faster, even if you need to make renovations once you move in. When you hire the right team to build a home, they will simplify the design and build phases so that there is little guesswork throughout the process, but building new construction will almost always take longer than buying an existing home.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

The Cross Plains, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.