Top-rated subcontractors.

Get matched with top subcontractors in Belleville, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Belleville, WI?

Select your specific project to find the pro for you.

TRUSTED BY BELLEVILLE, WI HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon2.8k+
    Verified subcontracting services reviews

Find Subcontractors in Belleville

Avatar for GF Company
GF Company
4.6(
152
)

Serving Belleville, WI and surrounding areas

In business since 1974

Free estimates

Credit card accepted

"we had a large double window two windows one opening replaced they did a a good job made that room much warmer in winter which is what we were after it is now the warmest room in the house in the winter which is good as it is the room we spend most our time in. will defiantly be having them out to price gutters when we are ready in the spring."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by93%of homeowners
Avatar for Kitchen & Bath Solutions, LLC.
Kitchen & Bath Solutions, LLC.
4.8(
19
)

Serving Belleville, WI and surrounding areas

In business since 2014

Free estimates

Credit card accepted

"About two years ago, the KBS team (including Alberto and Elizabeth) completed a remodel of our house to accommodate a family member with disabilities. They were fantastic: excellent communication, attention to detail, recommendations and project coordination. Super responsive and friendly, too! We are so happy with the results and had a really positive experience in the planning and remodel itself."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+65

Recommended by100%of homeowners
A O Handy
4.1(
133
)

Serving Belleville, WI and surrounding areas

In business since 2002

Free estimates

Emergency services offered

"At the end of the inspection I was positive that I was not going to use him. He gave me like a huge laundry list of things that needed to be done. After he was finished he said that it would cost me $15000. There was no way all of this going be $15000. It was like these little things he tarried about because he wanted to get paid as the coupons were so cheap. He had no suggestions about minimum cost. The thing about him was he did not give us any options, everything he gave was for us to do things. There are always levels of priority and I did not get anything at all from him."
Recommended by87%of homeowners
Avatar for Creative Painting
Creative Painting
5.0(
13
)

Serving Belleville, WI and surrounding areas

In business since 2017

Free estimates

"It was excellent. Their communication was good. The expectation was met. They got it done on time. They have good quality. I was the happiest I could be. I just referred him to a friend today."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

Recommended by100%of homeowners
Avatar for Castle Construction
Castle Construction
4.9(
9
)

Serving Belleville, WI and surrounding areas

Free estimates

Credit card accepted

"We called, Alex came out that afternoon, had a bid the next day for the screening. The next day he had a bid on the chimneys. He and a partner began the work and finished in a week. They cleaned up each day, and hauled away trash. Very nice to work with and very thorough. Yes, I would hire again."
Kitchen and Bath Remodeling Project
Remodeling - Kitchen & Bathroom Project
Decks and Porches Project
Landscaping Project
Kitchen and Bath Remodeling Project

+64

Recommended by100%of homeowners
...
Showing 1-10 of 55
Subcontractors questions, answered by experts

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

Designs typically take 2-6 months, depending on factoring, project size, and customization needs. Larger or more complex designs may require additional time for approval and revisions.

The cost to draw house plans typically ranges from $800 to $2,700, with standard blueprints averaging around $1,800. For a custom home, the cost is higher, with blueprints often falling between $5,000 and $20,000, and potentially more for very complex designs. Several factors influence the total price, including the project's size, the number of rooms, the type of drawings required, and the architect's experience level. You may also need to pay a structural engineer to ensure building safety, particularly for custom homes.

Builder-grade is one of two types of stock cabinets, whereas semi-custom designs allow homeowners some control over the color, finish, or hardware on their cabinets. Stock cabinets are sold in construction-grade and builder-grade designs. Construction-grade cabinets are usually made from inexpensive medium-density fiberboard, which is prone to moisture damage, whereas builder-grade models are a step up with higher-quality materials. Construction-grade designs are the most common type of cabinets in America.

Dark academia is more of an interior decorating style than it is a type of architecture, but it calls on themes prevalent in gothic architecture. Part of the appeal of dark academia is that you can achieve the look and feel without renovating or remodeling your home. Instead, you can switch to a dark color palette and introduce metal, natural wood furniture, plaid decor, old books, and gothic decor to get the look and feel just right.

The Belleville, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.