Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in North Potomac, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in North Potomac, MD?

Select your specific project to find the pro for you.

TRUSTED BY NORTH POTOMAC, MD HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon305
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in North Potomac

Avatar for R George's Paving LLC
R George's Paving LLC
4.7(
329
)
Asphalt SealingAsphalt Paving - InstallAsphalt Paving - Install- For Business+1 more

Serving North Potomac, MD and surrounding areas

Approved

Super Service Award Winner

In business since 1993

Free estimates

Emergency services offered

"He and his crew did a wonderful job on my driveway, they widened the entrance some so now it will be easier to enter. The driveway was in terrible shape now it is something I don’t have to be ashamed of! Thank you Richie and crew."
Driveways - Concrete Project
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+10

Response time1 day
5 neighbors recently requested a quote
Recommended by91%of homeowners
Avatar for Xtra Care Landscaping & Design INC
Xtra Care Landscaping & Design INC
4.7(
229
)
Brick and Stone Driveways & Floors - InstallGravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business+1 more

Serving North Potomac, MD and surrounding areas

Approved

Super Service Award Winner

In business since 1995

Free estimates

Warranties offered

"Unexpected rain unfortunately ruined the initial pour of the new driveway, but before I even realized that this happened XtraCare was tearing up the first pour, and re-poured the new driveway which came out perfect. The retaining wall also had some unexpected complications for getting a good level 1st row of retaining wall blocks, but the guys at XtraCare worked hard at tearing out the old wall & concrete footing to ensure a solid new wall went up well and wouldn't lean over time. It's been almost 2 months since the work has been performed, and we've since had a couple heavy rains which allowed me to watch the runoff run away from the house, which was the intention! Thanks XtraCare!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+30

Response time1 day
Response rate100%
14 neighbors recently requested a quote
Avatar for E Stanley Asphalt Paving
E Stanley Asphalt Paving
4.2(
411
)
Asphalt SealingAsphalt Paving - InstallAsphalt Paving - Install- For Business+1 more

Serving North Potomac, MD and surrounding areas

Approved

In business since 1977

Free estimates

Emergency services offered

"Joe and the crew from E Stanley did a great job widening our driveway. The job consisted of three parts. First, dig under the existing driveway and remove the roots that were growing underneath. Second, dig a couple of feet on both sides of our existing driveway to widen it out. Finally, pour asphalt on top of the driveway to replace the old one. Joe came in at the best price and finish the entire job in a single day.."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+32

Response time1 day
2 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for Frank's Blacktop
Frank's Blacktop
4.6(
17
)
Asphalt Paving - InstallAsphalt SealingAsphalt Paving - Repair or Patch+1 more

Serving North Potomac, MD and surrounding areas

Approved

In business since 1964

Free estimates

Warranties offered

"Frank’s Blacktop delivered an outstanding experience from start to finish. They responded to my request for a quote within two hours and even included a military discount, which was appreciated. Once I confirmed the job, Frank said he could begin the very next day—and he followed through. He arrived on time, removed the entire driveway in under four hours, and made adjustments as needed along the way without hesitation. The crew worked efficiently, cleaned up the area thoroughly, and completed the entire project in less than seven hours. Professional, responsive, and efficient—I would highly recommend Frank’s Blacktop."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+33

Response time1 day
Response rate100%
10 neighbors recently requested a quote
Avatar for Concreto Plus Inc
Concreto Plus Inc
4.8(
38
)
Concrete Driveways - InstallConcrete Driveways & Floors - Install- For Business

Serving North Potomac, MD and surrounding areas

Approved

In business since 2004

Free estimates

Warranties offered

"Dani, Jose, and the Concreto Plus crew did really nice work. I am very pleased with my new concrete driveway. Concreto Plus gave me an initial estimate and worked with me throughout the process to make sure things went smoothly. They also worked well with the needed county inspectors to ensure the new driveway was in compliance with local regulations."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+61

3 neighbors recently requested a quote
Recommended by100%of homeowners
...
Showing 1-10 of 600
Asphalt Driveways questions, answered by experts

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

Professionals restore the surface to a fresh, attractive finish by applying a new, even sealant layer.

Asphalt and tarmac are not the same thing. Traditional tarmac, short for tarmacadam, uses tar as a binder to hold crushed stone together. Asphalt uses bitumen—a byproduct of crude oil—to bind aggregate. Though tarmac was once a go-to for roads, asphalt has become the modern standard. And these days, most surfaces referred to as “tarmac” are actually asphalt. So, while the names may overlap, the key distinction lies in the binder—tar for tarmac and bitumen for asphalt.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

Yes, recycled asphalt driveway costs can be substantially lower than new asphalt. With new asphalt costing between $90 and $190 per ton, this option can cost as much as 10 times more than laying down asphalt millings.

The North Potomac, MD homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.