Top-rated subcontractors.

Get matched with top subcontractors in Chevy Chase, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Chevy Chase, MD?

Select your specific project to find the pro for you.

TRUSTED BY CHEVY CHASE, MD HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon2.3k+
    Verified subcontracting services reviews

Find Subcontractors in Chevy Chase

SMITHWRIGHT HOME IMPROVEMENT SERVICES, LLC
4.6(
123
)
Major Home Repairs (General Contractor)

Serving Chevy Chase, MD and surrounding areas

Approved

In business since 2004

Free estimates

Credit card accepted

Smithwright Home Improvement is a general contracting company providing a broad range of home improvement and home repair services in the Suburban Maryland area. I am a company of one and use subcontractors only when absolutely necessary. 99% of the work I take on is performed by me. Smithwright Home Improvement is licensed with the Maryland Home Improvement Commission since 2004 under license# 89597. I've done mostly flat-fee work under contract with the home owner. Small projects, or handyman related work, bills out at $80/hour with a 3 hour minimum. Angie's List customers receive a 10% discount off labor charges that invoice over $500.00. Discounts do not apply to materials cost which are in addition to labor charges. I do not add any additional costs to materials. You pay what I pay. My business, up to now, has grown strictly through referrals from satisfied customers. In the 20 years since I started this business, I have served hundreds of home owners in this area doing everything from simple drywall work to building large room additions and decks. I pride myself in delivering results that far exceed my customer's expectations. (Please note, the nature of my work can make it quite difficult to take phone calls during the day. The last thing I want is to offend anyone by not picking up or not returning phone calls. Please contact me via text at 410-707-5542 or email at [email protected] as well and I will try to respond to you within 24 to 36 hours. Thank you!).

Roland Park
Woodbine
Silver Spring
Before
After

+16

Response time1 day
1 neighbors recently requested a quote
Recommended by97%of homeowners
Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.7(
335
)
Major Home Repairs (General Contractor)

Serving Chevy Chase, MD and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"The master bathroom renovation process we experienced was frustrating and plagued with many unnecessary delays and quality control breakdowns. Having gone through numerous home improvement projects, we carefully researched companies and selected VKB Kitchen and Bath in large part because of the overwhelmingly positive reviews we read on numerous websites, including Angie’s List. Unfortunately, the company we worked with bore little resemblance to the glowing reviews we read. While we are ultimately happy with the finished product, we do not feel anyone should experience the frustrating ordeal we went through to have a bathroom renovated. Consequently, we cannot recommend VKB Kitchen and Bath. We signed a contract with VKB on March 17, 2016, to perform a complete renovation of our master bath. The project was to follow the VKB designer’s specifications, and was to be substantially completed in 2 weeks—their estimate, not ours—with minor items to be addressed in a final third week. The actual renovation began on April 19th, a week later than originally planned. From the beginning, we experienced problems. VKB gave us access to an automated project management tool to check on the job’s status, see what work was scheduled each day, see any change orders for modifications made during the renovation, and communicate any questions or concerns through its message board. VKB was to use the tool to communicate progress, work schedules, and responses to our questions. If actually used and kept current, it would have been a helpful resource to monitor the job’s status and any slippages. However, VKB rarely used it, and when it was used, it presented grossly inaccurate information (ex., noting tasks as “completed” when they had not been started or were well behind). Toward the end of the job, after numerous delays and a turnover in the subcontractor VKB hired to perform the work and the reassignment of the project manager, the lead designer—Joe—used the messaging feature more frequently to timely respond to our questions or concerns and to better inform us as to the new sub-contractor’s work schedule. Demolition of the old master bathroom took several days, primarily because most of the work was done by one worker. This pattern continued during construction of the new bathroom. Each day, several workers would show up to unload equipment, but then typically most would go to another job site, leaving just one person to handle much of the work. We were told that the crew would begin work between 8 a.m. and 9 a.m. and would work full days as long as there was work to be done, yet for the vast majority of the time the initial subcontractor was involved, the crew would not show up until 10 a.m. or later, and would usually leave between 3 and 4 p.m. There were days when no one showed up and we were not notified that no one would be coming that day, despite there being ample work. The lack of sufficient workers and erratic work hours were major factors in the job quickly falling behind schedule. When we raised concerns about job slippages to VKB’s project manager, he dismissed our concerns. Serious communication issues existed between the subcontractor and VKB’s project manager which led to mistakes and delays. For example, one key design decision prior to commencement of the renovation was the removal of a ceiling and wall bulkhead to allow for more open space. The bulkhead wall contained a ventilation register which had to be removed and rerouted through a toe-kick in one of the new vanities. Due to miscommunications, the subcontractor tiled over the ventilation opening on the floor. The crew had to subsequently pull up newly-installed tile to create a ventilation path and install a new vent. However, because of the manner in which this ventilation path was constructed, the floor register did not fit properly flush with the tile floor. It still does not fit properly to this day. To be fair, issues arose which contributed to delays in the job that were not originally anticipated. For example, when the subcontractor finished the demolition, he noted that the floor was not completely level. To his credit, he took steps to fully level the floor, which took a day to complete. Additionally, in designing the new bathroom, the designer envisioned shifting the position of the toilet. As the job progressed, the subcontractor and project manager realized this would not work without extending a wall. We agreed with this change, which added another day to the project. Finally, we were scheduled to be out of town beginning in mid-May, which resulted in the crew not being able to work on the job for 10 days. Yet, had the job met the original contracted timeframes, it should have been completed nearly 2 weeks prior to our trip. When little additional progress had been made 2 weeks after our return, VKB reassigned the project manager and Joe, our lead designer, fired the subcontractor and brought in a new subcontractor to complete the bathroom renovation. However, this subcontractor had to work us into his existing jobs, putting a strain on his crew. To further complicate the new subcontractor’s job, there were numerous instances in which materials delivered were either defective or incomplete. For example, a large wood linen cabinet was unfinished on one side, resulting in VKB having to order a piece to finish the side. Additionally, the cabinet, and two vanities that were to be installed were supposed to have two side-by-side doors. When we inspected the delivered cabinet and vanities, we found that they had single doors. After noting this to VKB, we were told that the manufacturer did not make vanities that had two side-by-side doors, though they were in VKB’s design and the contract specified them. When we noted this would be problematic with respect to the linen cabinet given its placement in the bathroom, VKB said the cabinet could have side-by-side doors but it would require re-ordering them. We later found out that any re-ordering of items would require 2-to-3 weeks from the time of ordering until the items would arrive. While a 2-to-3 week delay was bad enough given the significant slippages already incurred, it turned out that VKB also misjudged other wood materials needed from this same manufacturer to complete the cabinet and vanity installation–such as trim and crown molding we had requested prior to commencement of the renovation–which resulted in another several weeks of delays. The end result of these missteps was that the new subcontractor had to pull out on two occasions for a period of 2 weeks each to allow time for new and/or replacement parts to arrive. Additionally, VKB twice sent out a separate crew to install the shower door and glass, and each time, the crew had to leave without performing the installation because work on the shower was not sufficiently complete for them to install the glass. When they were finally able to attempt the installation, they discovered an error in the manufacturing of one side of the glass. They had to reorder the side, resulting in yet another delay. Perhaps most disturbing is that the door and glass had been ready for weeks, yet no one checked them to ensure the manufacturer had completed them to specification. Other examples of this abound, including delivery of bathroom sinks and countertops which were not properly made and hardware for the cabinet and vanities, which were missing handles. Many of these problems could have been prevented or at least detected and addressed earlier had VKB had an effective process in place to ensure all materials ordered from vendors were inspected for both quantity and quality as soon as they were received. As a result of these problems, our master bathroom renovation—which was to have taken at most 3 weeks—took nearly 4 months to complete. Final work was completed on August 8th. Even at that, we ultimately settled for certain things simply to end the ordeal and move on. For example, the floor register that had been improperly installed by the initial subcontractor was never properly resolved by VKB—its solution was to cut the register bottom"
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
4 neighbors recently requested a quote
Recommended by91%of homeowners
Avatar for FAMB Construction, LLC
FAMB Construction, LLC
5.0(
22
)
Major Home Repairs (General Contractor)

Serving Chevy Chase, MD and surrounding areas

Approved

In business since 2019

Free estimates

Customers say: True professional

We at FAMB Constuction LLC, we focus on quality services over quantity. We use our years of experience and expertise to complete your project with perfection. Customer service and honesty are the most important aspects of our business and your satisfaction is guaranteed. Please call us today for an estimate.

Regular Wood Deck
Deck
Deck
Frame Moulding
Deck

+37

Response time1 day
Recommended by95%of homeowners
Avatar for Arms Home Improvement
Arms Home Improvement
5.0(
45
)
Major Home Repairs (General Contractor)

Serving Chevy Chase, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2013

Free estimates

Warranties offered

ARM’s Home Improvement has been in business since 2013. After 26 years of working for the same home improvement/construction company, working his way to Vice President, Allen Metcalf, 4th generation carpenter, started Arm’s Home Improvement Company. At ARM's Home Improvement, we believe in providing the highest quality work, timeliness, clear communication throughout the entire process and client satisfaction. We specialize in residential construction, such as kitchen and bathroom remodeling. We can help you conceptualize your visions and turn them into reality. Please contact us today to schedule your free in-home estimate! We can show you 3D walk-through of your kitchen, bath or basement remodel. We are also a LEAD SAFE RENOVATOR. See more pictures and visit us on our Facebook page https://www.facebook.com/ArmsHomeImprovement/

Finished Carpentry and Woodworking Project
Finished Carpentry and Woodworking Project
Finished Carpentry and Woodworking Project
Finished Carpentry and Woodworking Project
Finished Carpentry and Woodworking Project

+359

Response time5 hrs
1 neighbors recently requested a quote
Recommended by95%of homeowners
Avatar for DreamMaker Bath & Kitchen
DreamMaker Bath & Kitchen
4.9(
32
)
Major Home Repairs (General Contractor)

Serving Chevy Chase, MD and surrounding areas

Approved

In business since 1983

Warranties offered

Credit card accepted

"


DreamMaker Bath & Kitchen? of Greater Fredericksburg provided excellent service and support throughout the entire remodeling process.  Steve Everett, the General Manager, planned and negotiated all aspects of the project from start to finish.  We were new to the process, so Steve explained all options and the implications of the various choices.  He made recommendations based upon the quality and durability of the options.  He regularly visited the work site to ensure excellent service.  At the final stages of the project Steve personally performed detail work, to address and resolve our concerns. 

All of his subcontractors were excellent.  They arrived on time, protected the interior of my home from any and all debris throughout the process, and were courteous and professional.  Initially the subcontractors laid down a plastic cover for dust protection.  They put floor runners in place between the work area and exit door.  These stayed in place throughout the project.  The subcontractors cleaned up and removed all debris.

 The contractor who handled installation of the shower valve, shower outlet, and handle bars checked with me regularly to ensure proper placement  of these items,  The tile people went a step above the contract requirements and put a corner seat in the shower for me!  The glass contractors explained out to properly care for the shower enclosure.

My husband and I very pleased with the work and service provided by DreamMaker Bath & Kitchen? of Greater Fredericksburg DreamMaker Bath & Kitchen? of Greater Fredericksburg.  We will happily recommend them.


"
Additional Photos
Additional Photos
Additional Photos
Before
After

+18

Response time2 days
Response rate89%
Recommended by100%of homeowners
Avatar for Diaz Painting & Renovations LLC
Diaz Painting & Renovations LLC
4.9(
124
)
Major Home Repairs (General Contractor)

Serving Chevy Chase, MD and surrounding areas

Approved

In business since 2010

Free estimates

Emergency services offered

"Repair of framing was done quickly and professionally. Window pane teplacent was outsourced to a subcontractor who took much longer than I was told to comete i stallation. When finally finished, the work was very satisfactory"
bathroom remodeling
bathroom remodeling
bathroom remodeling
bathroom remodeling
bathroom remodeling

+62

Response time2 days
Response rate98%
2 neighbors recently requested a quote
Avatar for Willis Builders Inc
Willis Builders Inc
4.3(
392
)
Major Home Repairs (General Contractor)

Serving Chevy Chase, MD and surrounding areas

Approved

In business since 2004

Free estimates

Warranties offered

"We hired Matthew and his team to completely gut and renovate our small master bathroom. Very generally, the experience was a positive one. The good: - Matthew and his subcontractor were extremely responsive to emails, texts, and calls - If we pointed out something that we thought wasn't quite perfect, they were happy to fix it - trash was removed fairly regularly and they would always tidy up the work/ storage area if asked (mostly when it was spilling into our walkway) - They always called to ask before adding extra work to the contract, even if it was clearly necessary (i.e. sistering some beams that had dry rot) - bills and itemized receipts were produced promptly and regularly - the estimate for labor was spot-on and we didn't feel like we were upsold - the additional costs came from things we had either anticipated or agreed were necessary (some beam sistering, replacing the ceiling, finding an alternate way to vent a new fan) The bad: - our project manager was only on-site a couple times a week and not for very long, which meant there was no direct supervision of the guys doing the work - it felt like every day or every other day we had to point out stuff that needed to be fixed - a crooked tile, missing waterproofing, regular tile used where there should have been bullnose - which was frustrating - they frequently ran out of things or discovered new supplies they needed that had to be ordered (shower valves, more tile, etc.), leading to delays - the work took about twice as long as they had first estimated Overall, I understand that some of these frustrations and difficulties are just part of dealing with a renovation. While I would have preferred not to have to nudge them about items so frequently, I certainly felt like they were treating us fairly in terms of cost and appreciated the responsiveness."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+111

Response time1 day
Response rate93%
16 neighbors recently requested a quote
Avatar for D&G Remodeling
D&G Remodeling
5.0(
43
)
Major Home Repairs (General Contractor)

Serving Chevy Chase, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2016

Free estimates

Warranties offered

Electric company established in 2016. Family owned. Commercial and residential electrical repairs & new installations. Renovations & additions. Main panel upgrades, low voltage lighting installations, car charging stations, and lot more. We guarantee your satisfaction, and we won’t leave until the job is done right. We pride ourselves on the quality work we provide, while delivering great customer service! Check out all the services we offer below and call -or- click to schedule a free estimate today!

Electrical Project
kitchen remodel
VIENNA KITCHEN REMODEL
FORT WASHIMGTON KITCHEN
ALEXANDRIA  BATHROOM RENOVATION

+50

Response time10 hrs
Response rate93%
3 neighbors recently requested a quote
Avatar for Dreamville Remodeling
Dreamville Remodeling
5.0(
28
)
Major Home Repairs (General Contractor)

Serving Chevy Chase, MD and surrounding areas

Approved

Super Service Award Winner

In business since 1991

Free estimates

Emergency services offered

Dreamville Remodeling is a locally family owned and operated company that values honesty and integrity in all aspects of our business. We take great pride in our experience, expertise, quality, and customer service. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. Our services are customized to your individual needs, paying close attention to the details of each project that we are involved with. Please feel free to contact us today!

Previous unlicensed contractor work
Seamless Gutter & Downspouts
Previous unlicensed contractor work
Seamless Gutter & Downspouts
Previous unlicensed contractor work

+57

Response time12 hrs
Response rate95%
4 neighbors recently requested a quote
Avatar for General Remodeling Group
General Remodeling Group
4.9(
23
)
Major Home Repairs (General Contractor)

Serving Chevy Chase, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2002

Free estimates

Emergency services offered

"Recommendation for General Remodeling Group: Reliable, Quality Work I hired General Remodeling Group (GRG) for two major projects in my home: a kitchen and dining room remodel ($75k in 2016) and bathroom renovations ($55k in 2018). Visvydas and his team delivered dependable craftmanship, and Iâ m still very satisfied with the results years later. Attention to Detail and Consistent Communication From start to finish, Visvydas kept me updated at every step with straightforward communication, making the whole process run smoothly. GRGs attention to detail also stood out they handled each punch list item promptly, completing everything to a high standard without cutting corners. In addition to my home, I also manage contractors at work, and I know this level of thoroughness is rare. Most contractors leave me frustrated with incomplete tasks, but with GRG, everything was done as it should be. For that reason alone, I feel compelled to recommend GRG, they get the job completed 100% without a fight! Skilled Team with Integrity and Flexibility GRG offers a flexible design-build approach, letting clients be as hands-on or hands-off as they prefer whether you want to make only the big decisions or get involved in the details. I was actively involved and appreciated how Visvydas collaborated with me, offering thoughtful advice and the chance to adjust along the way. Others I know who worked with GRG preferred less involvement and were equally happy with the outcome. They also brought in skilled subcontractors from masons and plumbers to electricians who truly know their craft. When I considered having GRG install new exterior doors and windows (over $100k), they recommended a specialist from another company, showing a real commitment to quality over profit. It reminded me of Miracle on 34th Street, where one shop suggests going to the competition to ensure customer satisfaction. Quality That Holds Up Over Time GRGs work included installing and modifying cabinetry that perfectly matched our kitchen design and detailed tiling that elevated our bathroom, and they performed major plumbing and electrical work without issue. We recently sold our home, and GRGs work still looked new. Even the home inspector praised their craftsmanship; the cabinets, tile, and plumbing looked and worked as if they were just installed. Their work clearly added value to our property. If you want quality work that stands the test of time, I highly recommend General Remodeling Group. GRG delivered for my family and friends, and even eight years later, we are grateful we chose them. PS I rarely see a contractor finish every punch list item 100%, but with GRG, it is like discovering unicorns are real. That alone makes them worth recommending."
Master Bathroom, NW, DC, 2024
Bathroom, NW, DC, 2023
Kitchen, NW, DC, 2022
Master Bathroom, NW, DC, 2024
Bathroom, NW, DC, 2023

+167

Response time12 hrs
Response rate93%
11 neighbors recently requested a quote
...
Showing 1-10 of 739
Subcontractors questions, answered by experts

Services include creating technical drawings, floor plans, and 3D renderings for construction or renovation projects.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

While possible for small projects, professional designers ensure compliance with building codes and structural integrity.

You have three options in terms of professionals who can draw up blueprints: a draftsperson, an architect, or a structural engineer. A draftsperson can sometimes draw up plans for new construction, but they more often work from approved plans for alterations or to provide 3D drawings. Architects are usually the best option for standard residential construction projects. Structural engineers might be necessary for custom home builds or for alterations that could affect your home’s structural integrity. Draftsmen cost the least of the three, followed by architects and then structural engineers.

Professionals optimize layouts, improve energy efficiency, and ensure structural safety and compliance.

The Chevy Chase, MD homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.