Top-rated basement remodelers.

Get matched with top basement remodelers in Dubuque, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Dubuque, IA?

Select your specific project to find the pro for you.

Find Basement remodelers in Dubuque

Avatar for Next Gen Construction
Next Gen Construction
4.7(
15
)
Basement - Remodel

Serving Dubuque, IA and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Emergency services offered

"Quit simply, the best! Fair price, cordial, and on time. In addition, he assisted with another project I needed done that day. Hired again to install a ceiling fan on a high ceiling. I will reach out time and time again for the assuredness of a job well done!"
Modern Bathroom Remodel
Modern Kitchen
Basement remodel
Basement remodel
Basement remodel

+8

Response time2 days
20 neighbors recently requested a quote
Recommended by33%of homeowners
Avatar for Modern Edge Construction, LLC
Modern Edge Construction, LLC
4.4(
49
)
Basement - Remodel

Serving Dubuque, IA and surrounding areas

Approved

In business since 2011

Free estimates

Emergency services offered

"I am very pleased with how professional and courteous Cade is. When he was done he told me to let him know if he missed something or I had an issue with something. There were just a few things I thought could have been done more to my liking and he was here the next day and put my issues right. If I could rate my experience more than 5 stars, I would definitely give it a 10."
Addition/Home Renovation
Addition/Home Renovation
Addition/Home Renovation
Addition/Home Renovation
Addition/Home Renovation

+48

4 neighbors recently requested a quote
Recommended by78%of homeowners
Avatar for Modern Edge Construction
Modern Edge Construction
4.3(
39
)
Basement - Remodel

Serving Dubuque, IA and surrounding areas

In business since 1990

Free estimates

Emergency services offered

"There aren’t enough words to express how happy we are with Cade and Modern Edge Construction! Cade helped us finish our basement and lay down new flooring on the main level. He was at our house within 24hrs to give us an estimate and started working on the house the very next day! Cade always communicated the plan, was extremely fair with pricing, and took a lot of pride in his work! We have a couple more projects and can’t wait to work with him again! Highly recommend! 😃"
7
2
5
1
3

+29

Response time2 days
Recommended by75%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Dubuque, IA and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Dubuque Remodeling
Dubuque Remodeling
5.0(
1
)
Basement - Remodel

Serving Dubuque, IA and surrounding areas

In business since 2024

Free estimates

Small jobs welcome

"We hired Vault Enterprises for a home remodel that included adding a mud room, home office, and bunk area. The work was completed on time, within budget, and to a very high standard. The mud room is functional and well-designed, the office is exactly what we needed for a quiet work space, and the bunk area turned out great ? perfect for guests or kids. Communication throughout the project was clear and consistent. The crew was professional, respectful of our home, and kept the workspace clean. Overall, a solid experience and great results. We?d gladly work with them again."
Bathroom
Bathroom
Kitchen
Loft Space
Living

+16

Response time5 days
Showing 1-10 of 26
Basement Remodel questions, answered by experts

If you have the woodworking experience to build a bar from scratch and you have the time, DIYing the work is a no-brainer and can save a few thousand dollars. However, if you’re looking to include a sink, additional lighting fixtures, or high-end bar tops and cabinets, it’s usually a better idea to call in a pro. It will cost more, but the finished product will likely be worth it.

Yes, adding a walkout basement will usually bump up your property value. Most homeowners prefer walk out basements because the exposed wall that’s level with the ground provides more utility via a ground-level exterior entrance, and they can fit full windows, which adds natural light and ventilation to the basement area. The only exception might be in areas prone to tornadoes, as walkout basements aren’t as safe as regular basements during a tornado, particularly if they include large windows or glass sliding doors.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

It is common for a contractor to ask for a down payment before starting a project, especially for jobs that require purchasing materials and equipment or hiring a crew. The deposit amount can range from 10% to 50% of the total job cost. While a request for up to 50% is not unusual, a contractor should not ask for more than that, and you should never pay for a project in full before the work has begun. To protect yourself, always discuss payment terms before starting and have a written contract that outlines the project timeline and expectations. Additionally, be sure to hire reputable contractors and check their licensing and insurance before the project begins.

Common mistakes when finishing basement walls include neglecting proper insulation, insufficient moisture management, and poor ventilation. Not addressing these issues can lead to mold growth, water damage, and discomfort. Additionally, inadequate planning, improper framing, and rushing the project can result in subpar outcomes. 

It's essential to follow best practices, seek professional guidance if needed, and prioritize thoroughness and attention to detail.

The Dubuque, IA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.