Top-rated land surveyors.

Get matched with top land surveyors in Bothell, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your land surveying project in Bothell, WA?

Select your specific project to find the pro for you.

TRUSTED BY BOTHELL, WA HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon48
    Verified land surveying services reviews

Find Land surveyors in Bothell

Avatar for Plein Land Surveying
Plein Land Surveying
4.3(
18
)
Land Surveyor

Serving Bothell, WA and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"On time, on the money. Did the job on a Sunday. Relaxed, solid background in land survey. I think that he cross checked his findings with both modern GPS and practical trigonometry. This impressed me. ( i`m old school) Excellent customer relations. Would hire again if needed. Ed Powers"
Response time2 days
Response rate87%
Recommended by86%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Land Surveyor

Serving Bothell, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
Global Precision Designs
New to Angi
Land Surveyor

Serving Bothell, WA and surrounding areas

In business since 2020

Free estimates

Emergency services offered

Global Precision Designs is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Northwest Construction
New to Angi
Land Surveyor

Serving Bothell, WA and surrounding areas

Hi, my name is Jazmine , and I’m a professional handyman here in Seattle, WA. I specialize in helping homeowners take care of all the repairs and improvements that keep a house safe, comfortable, and looking its best.\nWhat makes me different is my attention to detail and reliability—I treat every project like it’s my own home. Whether it’s fixing something small or tackling a larger repair, I make sure the job is done right the first time. That’s why so many homeowners in Seattle trust me as their go-to handyman

USA Green Builders
New to Angi
Land Surveyor

Serving Bothell, WA and surrounding areas

In business since 2000

Free estimates

Emergency services offered

USA Green Builders is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Land Surveying questions, answered by experts

The age and upkeep of your Bothell property directly affect surveying needs. Older homes in areas like Downtown Bothell may lack reliable records, requiring more in-depth research. Dense landscaping, retaining walls, or proximity to wetlands can limit access and require specialized surveys. If underground utilities are present, mark their locations in advance. Local zoning and environmental rules may also dictate the type and scope of survey required.

Helpful?

Bothell’s wet winters and clay soils can cause survey markers to shift or corrode, especially after heavy rainfall or freeze-thaw cycles. Inspect markers each spring and fall, clearing away moss or overgrown plants. If your property borders wooded areas, watch for root growth displacing markers. Keep digital copies of your survey documents, and schedule a professional boundary check after significant landscaping or construction projects to ensure accuracy.

Helpful?

Homeowners in Bothell often balance the need for a basic boundary survey against the benefits of a detailed topographic survey, especially near wetlands or sloped lots. Choosing the right time—avoiding peak rainy seasons—can reduce delays. Including elevation data may be wise in flood-prone areas like North Creek. Weighing neighbor cooperation and local zoning requirements helps avoid future disputes and ensures compliance with Bothell’s property regulations.

Helpful?

Postponing land surveying in Bothell increases the risk of property boundary disputes, especially in neighborhoods like Canyon Park or North Creek where lot lines can be complex. Unclear boundaries may lead to accidental encroachment, permit denials, or title insurance delays. Over time, shifting soils and new construction can further obscure original survey markers, making future property development or resale in Bothell more challenging and uncertain.

Helpful?

In Bothell, before land surveying begins, check for survey markers near fences, irrigation systems, or utility boxes—especially in older neighborhoods where lines may be less documented. Confirm the exact locations of underground utilities and sprinkler lines, as survey crews may need access or could disturb shallow installations. If you have security sensors or lighting near property boundaries, temporarily disable or relocate them to prevent accidental damage during the survey.

Helpful?

The Bothell, WA homeowners’ guide to land surveying services

From average costs to expert advice, get all the answers you need to get your job done.