Top-rated ev charger installation pros.

Best ev charger installation pros near Broken Arrow, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your ev charger installation project in Broken Arrow, OK?

Select your specific project to find the pro for you.

TRUSTED BY BROKEN ARROW, OK HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon1.3k+
    Verified ev charger installation services reviews

Top-Rated Ev charger installation pros in Broken Arrow - Updated Nov 2026

Avatar for Mister Sparky
Mister Sparky
4.5(
452
)
Electric Vehicle Charging Station Installation - Materials Provided by ConsumerElectric Vehicle Charging Station Installation - Materials Not Provided

Serving Broken Arrow, OK and surrounding areas

Approved

Super Service Award Winner

In business since 1978

Free estimates

Emergency services offered

"Lihai and his partner showed up on time and were very polite and professional. They asked questions to make sure what was to be done was what I wanted and where. For my EV Charging Station. Then they went to work. They knew what to do and how to do it. They didn't stumple at all. It was a Cold Day. After awhile it started to snow. So I closed the garage door when they didn't need to go out to there truck. Trying to keep it a little warm. But they kept on working. After awhile I made them Hot Chocolate to drink. They we're thankful. After that. Didn't take long they we're done. Very complete and professional looking. I would use Mister Sparky for any of my Electrical needs."
Smart Home
Options
Ceiling Fan
Panel
Wiring

+1

79 neighbors recently requested a quote
Recommended by88%of homeowners
Avatar for DNA Electrical Services Inc
DNA Electrical Services Inc
4.9(
99
)
Electric Vehicle Charging Station InstallationElectric Vehicle Charging Station Installation - For BusinessElectric Vehicle Charging Station Installation - For Business - Materials Not Provided+3 more

Serving Broken Arrow, OK and surrounding areas

In business since 2012

Free estimates

Emergency services offered

"The recessed LED lighting installation involved substantial ingenuity as there was no available access to these spaces. David and Austin did a great job with this and came up with a great solution that made smart use of existing wiring and switches. They were efficient, professional, pleasant, and eager to please. David even installed a solar light fixture on my gas lamp post just to be nice. I would highly recommend DNA Electrical Services."
Storefront
Moore OK, 2013 Tornado
Recommended by96%of homeowners
...
Showing 1-10 of 71
Ev Charger Installer FAQs, answered by experts

You can plug your electric car into a regular 120-volt household outlet only if you’re using a Level 1 charger. This method is slower and may take several days to fully charge your EV. For faster charging, you’ll need a Level 2 charger, which requires a 220- or 240-volt outlet.

Yes, you should get a quote or an estimate from an electrician. Most electricians offer free estimates or quotes. When getting quotes, do your research and verify each electrician’s license. Get quotes from three different electricians to compare. If the prices or items listed appear different on the quotes, ask the electrician to clarify. Learning as much as you can about the electrical work you want done will help you get the most accurate estimate. 

The cost of installing a 240-volt outlet for an electric car averages between $175 and $300. Depending on the type of outlet as well as labor costs, you might pay as little as $130 or upwards of $400. Hiring a professional electrician makes up the bulk of the expense but ensures a safe and code-compliant installation.

Local electricians with experience in your area understand the local building codes, which is very important when doing new electrical work. They also have experience with the kind of electrical problems homes in your location may have, and even the components that were used in the original construction, which leads them to make faster and better decisions.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

The Broken Arrow, OK homeowners’ guide to ev charger installation services

From average costs to expert advice, get all the answers you need to get your job done.