Install Above Ground Pools questions, answered by experts

How often you should add water to your pool depends on how quickly the water evaporates. Keep an eye on your skimmer box, if you have one. Top up the water in your pool if you notice the water levels are lower than the bottom third of your skimmer. This helps prevent damage to your pump. 

Replace all the water in your pool every five to seven years, depending on how often you use your pool, the weather, and whether or not you close your pool for the winter.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Some pool professionals recommend adding an extra layer of comfort and protection between your pool and the vinyl liner. Made from a range of plastic blends, these liners can absorb moisture, allow the pool liner to breathe, and act as an extra barrier for pests, burrowing animals, and mildew. They also provide an extra layer of comfort for swimmers.

Most of the time, though there may be some code variations on the local level, a water source like a pool requires a GFCI breaker. These breakers detect electrical leaks of 5 mA or more and trip the breaker. However, the size of the pool and motor type determine the exact GFCI needs. A GFCI outlet with a reset button may be enough for an aboveground pool with a small motor or pump. Consult a pool electrician to determine the appropriate installation and protection measures needed for your pool.

It is a good idea to brush a pool before shocking. Brushing the sides and floor loosen up anything that is growing on the surface, such as algae. It is then easier for the pool shock to kill the contaminants because more of it will come in contact with the chemicals.

The Evergreen, MT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.