Install Above Ground Pools questions, answered by experts

It's not a good idea to drain an aboveground pool into your yard since the pool water's chemicals can harm your plants and the surrounding ecosystem. Instead, it's best to drain the pool into an appropriate sewer so it can be processed at a water treatment plant. You might also be able to drain it into your storm drain, depending on your region. Check with your city to learn about any relevant regulations.

Remodel costs vary, often 50-70% of new construction costs, depending on remodeling depth and choices for feature additions or modifications.

A pool builder can advise you on the best design for your property and vision, and can walk you through the process from design to a swim-ready pool. Knowing which questions to ask a pool builder can help ensure you choose the right person for the job.

Once you use a pH decreaser, you can expect the pH to adjust in two to four hours. If you use a strong chemical like muriatic acid, it could take as little as an hour. Either way, it’s best to wait for a full turnover cycle before retesting. You want to make sure the chemical is completely dissolved and evenly distributed or you won’t have a stable pH level.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.