Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Ronan, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Ronan, MT?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Ronan

Install Above Ground Pools questions, answered by experts

It depends. Your pool might need chlorine every day if the water is exposed to direct sunlight and you use your pool frequently. UV light and constant use will deplete chlorine levels more rapidly. Test your water regularly to see where your levels sit and adjust accordingly. Generally speaking, most homeowners need to add chlorine following a water chemical test about one to three times per week.

Pools and pool equipment tend to go on sale in the fall to make room for the next year’s inventory. That means if you’re looking for the lowest cost to install a pool in your outdoor space, you should start looking in the fall rather than the summer. You’ll save money and be ready to dive in during the warm months next year. 

Rectangular pools, particularly those made of vinyl or fiberglass, are the easiest to maintain. The long, straight sides, right angles, and smoother surface make regular cleaning a breeze without having to maneuver into curves and nooks. Rectangular pools also tend to be standard sizes, so you may have an easier time when it comes time to replace liners, covers, and other parts.

Pool leaks most commonly occur at joints or where different materials meet. The most frequent leak spots include:

  • The Pool Skimmer: Where the plastic skimmer meets the pool's liner or shell.

  • The Pool Liner: Tears can develop in vinyl liners, especially those between 5 and 20 years old. Leaks also occur around the liner's edge.

  • Fittings and Accessories: Areas around return lines, the main drain, and pool lights are common culprits.

  • Pool Equipment: The pump, filter, and filter housing can also leak.

While leaks in underground pipes are less common, they can be costly to fix. It's usually best to check the more common spots before investigating the plumbing system.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Ronan, MT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.