Top-rated above ground pool installation pros.

Best above ground pool installation pros near Belgrade, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Belgrade, MT?

Select your specific project to find the pro for you.

TRUSTED BY BELGRADE, MT HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon10
    Verified above ground pool installation services reviews

Top-Rated Above ground pool installation pros in Belgrade - Updated Nov 2026

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Belgrade, MT and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools FAQs, answered by experts

Above-ground pools offer affordability, easier installation, portability, and flexibility in placement compared to permanent in-ground pools.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Yes, it’s possible to DIY a plunge pool and shave labor costs off of the project total. If you’re considering a DIY build, keep in mind that you will be responsible for pool installation and landscaping (which may require excavation). This type of DIY project is best left to particularly handy homeowners who have prior pool installation experience. 

Technically, you can fill in a pool yourself—with the caveat that filling in a pool requires the ability to drain the pool properly and move a substantial amount of dirt, which aren’t beginner DIY skills. If you want to fill in a pool, you’re better off hiring a local pool removal professional.

Yes, they provide full-service inspections, identifying and resolving any potential equipment problems.

The Belgrade, MT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.