Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Fishtail, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Fishtail, MT?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Fishtail

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Fishtail, MT and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

When designing your dream pool, it's important to leave enough room for safe walkways, patios, and extras such as outdoor kitchens and fire pits. Your local building codes may specify the minimum space between your pool and your house, utility lines, and property line. In most cases, the area of the patio around the pool should be equal to or greater than the surface area of the pool.

If you want your pool to be ready for summer, spring is the perfect time to put in an inground pool. However, if you are concerned about cost and are looking to save money, you can wait until fall and winter, when some companies may offer discounts on pools and pool materials.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

It is a good idea to brush a pool before shocking. Brushing the sides and floor loosen up anything that is growing on the surface, such as algae. It is then easier for the pool shock to kill the contaminants because more of it will come in contact with the chemicals.

The best temperature to paint a pool deck is between 50 and 90 degrees Fahrenheit, because many paints and sealers require temperatures warm enough for the chemical reaction to take place for proper curing. The paint should not be allowed to freeze, and temperatures above 90 degrees can cause the paint to dry too quickly, also preventing the chemical reaction from following through to completion.

The Fishtail, MT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.