Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Ennis, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Ennis, MT?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Ennis

Install Above Ground Pools questions, answered by experts

Any number between 7.2 and 7.8 is an ideal pH for swimming pools or 80 to 120 ppm. Your pool testing kit should be able to measure both of these numbers. If your pool’s pH is below this range, the water is too acidic and can cause scaling and damage to pool equipment. If the water’s pH is above this range, it can decrease the effectiveness of necessary chemicals, like chlorine.

The best temperature to paint a pool deck is between 50 and 90 degrees Fahrenheit, because many paints and sealers require temperatures warm enough for the chemical reaction to take place for proper curing. The paint should not be allowed to freeze, and temperatures above 90 degrees can cause the paint to dry too quickly, also preventing the chemical reaction from following through to completion.

In most cases, late May or early June are the most popular times to open a pool, depending on your location. It’s a good idea to open your pool when the outdoor temperature sits consistently above 65 to 70 degrees (F). At this point, algae will begin to flourish in your water, so opening the pool and adding the proper chemicals will avoid excessive pool algae growth.

Yes, small pool leaks are fixable with waterproof patches and sealants. It is always best to avoid draining a pool if you can, since doing so safely takes time, patience, and a whole lot of water to refill it. Larger pool leaks may require draining, but in this case, it's best to call in a professional.

It’s a good idea to wait at least 24 hours after opening your pool before you swim in it. Pool opening often involves shocking the water, and the chemical levels need to come down a bit before it’s safe to swim. You can continue testing your water pH and chlorine levels if you’re in a rush. It’s wise to wait until your chlorine levels drop to under four parts per million (ppm) and you have a water pH of between 7.2 and 7.8. You can artificially lower your water pH to speed up the process.

The Ennis, MT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.