Top-rated above ground pool installation pros.

Best above ground pool installation pros near Big Timber, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Big Timber, MT?

Select your specific project to find the pro for you.

Top-Rated Above ground pool installation pros in Big Timber - Updated Nov 2026

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Big Timber, MT and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools FAQs, answered by experts

Spools can come as small as 10 x 6 feet, so they don’t take up a lot of room in your yard. You’ll want to plan for pool decking, fencing, and other features that may take additional space, but for the most part, a spool’s small footprint makes it a great choice when you don’t have much yard space to spare.

The steps to fill a swimming pool will depend on your local building codes. However, it starts with draining the pool of all water using a submersible pump. Then your pro will lift the pool shell from the ground or break it into pieces for individual removal. The next step is filling the cavity with dirt and gravel and topping it with topsoil. Once a structural engineer deems the site safe, landscaping can start.

Completely refreshing the water in an aboveground pool every five to seven years helps keep it free of bacteria and algae. Emptying the pool also allows you to clean, repair, or replace the pool liner. Schedule your water change when the weather is mild, as intense heat or cold can damage the pool liner when the pool is empty.

Remodel costs vary, often 50-70% of new construction costs, depending on remodeling depth and choices for feature additions or modifications.

Building a pool yourself will take at least eight to 12 weeks. After all, this is the building timeline after hiring a pool contractor who knows how to draw up plans, analyze your landscape, and apply for proper permits. If you choose to tackle any part of the process alone, assume building a pool will take two to three months at a minimum.

The Big Timber, MT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.