Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Big Timber, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Big Timber, MT?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Big Timber

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Big Timber, MT and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

It is a good idea to brush a pool before shocking. Brushing the sides and floor loosen up anything that is growing on the surface, such as algae. It is then easier for the pool shock to kill the contaminants because more of it will come in contact with the chemicals.

Yes, you can absolutely use a sand filter with a saltwater pool, but you’ll have to make sure you have the right grade of sand to catch smaller particles, just like in a standard pool. To choose the right pool filter, consider the degree of filtration you’ll need. Cartridge or diatomaceous earth filters can remove smaller particles, so they’re better suited for a less chlorinated saltwater pool.

If you put too much baking soda in your pool, your alkalinity will rise. That means you’ll need to take steps to lower your alkalinity. You can either add more water (which will require more chemicals because they’ll be diluted), wait for the alkalinity to lower naturally, or use a chemical like muriatic acid to lower it. 

These pools are cost-effective, customizable, and offer smooth, non-abrasive surfaces.

Pool concrete or gunite can take several weeks to cure, or an average of 30 days, before workers can resume construction. Additional work and finishes push the time to build a pool out of concrete to between three and six months. There are many types of pools that take far less time, so keep these in mind if you're on a short timeline.

The Big Timber, MT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.