Top-rated excavation pros.

Get matched with top excavation pros in Chillicothe, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Chillicothe, MO?

Select your specific project to find the pro for you.

Find Excavation pros in Chillicothe

Avatar for Volkmann Construction, LLC
Volkmann Construction, LLC
5.0(
5
)

Serving Chillicothe, MO and surrounding areas

Approved

In business since 2018

Customers say: Quick response

"Out-standing service. Smart guys with incredible heavy equipment skills. Got severl bids and auditions before i found Volkmann, these guys are the best in my opinion. I got lucky, thanks guys and Home Advisor."
Berserk Athletics
Horse Working Area
Horse Working Area
Horse Working Area
Our Work.

+6

Response time2 days
Recommended by100%of homeowners
Showing 1-10 of 31
Excavating questions, answered by experts

Drilled wells have a pipe sticking up that’s covered in a plastic or metal casing. On the other hand, a dug well will look like a big hole in the ground and is more similar to what you’d see in a fantasy or Western movie. If you want to be sure, contact the city for documentation on your property’s construction and excavation history. 

Yes, chipmunk holes may have two or more entrances. Chipmunks can create an entire network of burrows. Having multiple entrances makes it easier for them when trying to escape from a predator, such as a snake, or if an entrance collapses due to flooding. Each entrance leads to the nesting chamber underground, which is where the chipmunk spends the majority of its time sleeping.

There is no standard depth for burying a septic tank; they are typically buried anywhere from 4 inches to 4 feet underground. The final depth depends on several factors, including the depth of your main sewer line, the height of the bedrock, soil type, local regulations, and the property's landscape. If you plan to grow grass or plants over the tank, a depth of at least 4 to 6 inches is recommended. Deeper tanks can be more difficult to locate, but a septic professional can help find it for you.

Trenches are typically 12 to 24 inches deep and 8 inches wide. However, the required depth depends on the specific project and local ordinances. For example, a French drain may need to be 18 inches deep, while a water pipe might require a depth of 24 inches and a drainage pipe 36 inches. Your city or county may have specific regulations, so it's wise to consult with an excavation professional to determine the correct depth for your project.

If you’re planning to dig on your property, you’ll need to check for underground utility lines. Call the national call-before-you-dig 811 number. Once connected to an operator, you can schedule a site visit to mark underground lines. This way, you won’t accidentally dig into pipes and can cause major (read: costly) issues.

The Chillicothe, MO homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.