Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Milpitas, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Milpitas, CA?

Select your specific project to find the pro for you.

TRUSTED BY MILPITAS, CA HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon36
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Milpitas

Avatar for Blue Splash Pool Service Repair & Leak Detection
Blue Splash Pool Service Repair & Leak Detection
4.7(
50
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Milpitas, CA and surrounding areas

In business since 2001

Free estimates

Warranties offered

"Price quote was much lower than others, reviews from others very good, and BBB check showed he is BBB member with no complaints. Work was performed on time, included jackhammering out old skimmer from pool deck, installation of new skimmer, patch concrete, cleanup and rebalance pool water. Very pleased with the results."
BACK YARD REMODEL
BACK YARD REMODEL
BACK YARD REMODEL
BACK YARD REMODEL
BACK YARD REMODEL

+43

Response time7 hrs
Recommended by90%of homeowners
Avatar for POCO Solar Energy, Inc.
POCO Solar Energy, Inc.
4.3(
77
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Milpitas, CA and surrounding areas

In business since 1984

Free estimates

Credit card accepted

"The panel replacement went reasonably well, however the installers either misplaced or dislodged a part which became stuck farther down the pipes, blocking the plumbing. I decided to cut open the PVC pipes, remove the blockage and re-assemble the lines myself, instead of having them come out and pay their hourly rate. I was also a bit surprised by the cost of the repair."
Recommended by87%of homeowners
Avatar for LAR Construction & Remodeling
LAR Construction & Remodeling
5.0(
138
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Milpitas, CA and surrounding areas

In business since 2001

Free estimates

Credit card accepted

"We were referred to LAR Construction & Remodeling by a family friend and we contacted Gili, scheduled a meeting and provided him the vision of what we wanted to have and to also know how much we can spend. Gili came back with his laptop and with a 3D design of the pool including all the hardscape that by far surpassed all of our hopes and his proposal estimate was also within our budget (which means that he listened to us and understood our needs very good). Gili even made some modifications to the placement of the pool which maximized the space of the backyard. Gili estimated the remodeling project as a 3 months project (on a daily basis). We believed that it will take much longer because the type of the pool that needed a cut into the hillside, hardscape, sprinklers and more and more... But surly enough, they were done with the project a little bit longer than the 3 months. We do recommend Gili and all his team to anyone who is looking to design and build a pool. Gili helped us picking out all the colors for the stones around the pool."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+369

Recommended by96%of homeowners
Paramount Pool Plaster
3.9(
16
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Milpitas, CA and surrounding areas

In business since 1999

Credit card accepted

"They did an excellent job. The only issue was that after starting to chip away at the old plaster, they called me and told me that my pool had been replastered before. Therefore it had 2 layers of old plaster. That meant more work to chip it all the way down to the gunite. That would cost $1,500 more! I had chosen PPP because of their low bid and good reviews on Angie's List. I was very upset. Jorge said that he could replaster without stripping down to the the gunite. I told him that other companies specified in their estimate and quot;strip down to the guniteand quot;. He agreed to drop the surcharge to $1,200.
Notwithstanding this, PPP were still cheaper and did a superb job.
My recommendation to others is to make the contractor be very specific as to his assumptions and state what are the incremental costs if these assumptions turn out to be incorrect.Jorge is a very pleasant man who is a pleasure to deal with.
"
Recommended by91%of homeowners
Avatar for Fine Point Painting
Fine Point Painting
4.6(
54
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Milpitas, CA and surrounding areas

In business since 1997

Free estimates

Emergency services offered

"Bill and the rest of the Fine Point team were incredible.
They sanded and repainted a large kitchen with stained oak cabinets. Since the oak didn't take the paint like other woods, they applied an extra coat of primer and and extra finishing coat to make sure that it looked the way we hoped. They used a spray, which helped give the cabinets a professional, uniform coat. They look fantastic.
When the paint dried, some of the cabinets didn't close properly. This is not a criticism?when we told Bill, he came by the next day to fix those that were misaligned (which could have happened in any project), so the final kitchen looked perfect.
The whole team was really friendly. They put in extra hours to make sure the job was done well, and honored their initial estimate, which was completely reasonably compared to some estimates we received.
They touched up several areas of the house. When we couldn't find a matching paint for the upstairs bathroom, Bill repainted the entire wall with another paint, and he did it for a nominal fee.
What can I say? The team was patient with us as clients, thorough with the job, and masters of the craft. Our house looks fantastic, and I'd hire them or recommend them in a heartbeat.
"
Additional Photos
Additional Photos
Additional Photos
Recommended by93%of homeowners
Showing 1-10 of 34
Install Above Ground Pools questions, answered by experts

A black tarp will indeed heat your pool. Black absorbs more heat than other colors. This heat will transfer down to the water in your pool and help increase the temperature. It will not be extremely effective at raising the overall temperature, but it can help maintain the current temperature.

You can usually use the water from your tap to refill your pool, whether it's city water or well water. If you're going to use well water to fill your pool, make sure you have an adequate amount of water available and that the water is free of contaminants. A water delivery service may also be able to bring water to refill your pool.

You should add one 3-inch chlorine tablet for every 5,000 gallons of water in your pool. If you have a smaller pool, it’s better to use 1-inch chlorine tablets so you don’t accidentally add too much chlorine. Alternatively, you can add two to three ounces of powdered chlorine or half a gallon of liquid chlorine for every 5,000 gallons of water.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The amount of time your fiberglass pool project will take depends on the size of the pool and whether you are installing add-ons like decking and landscaping. Overall, you should expect it to take four to six weeks to install. If you are dreaming of summer pool parties, make sure to budget enough time into the installation schedule to have your pool up and running in time for the swimming season.

The Milpitas, CA homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.