Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Cupertino, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Cupertino, CA?

Select your specific project to find the pro for you.

TRUSTED BY CUPERTINO, CA HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon305
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Cupertino

Avatar for Blue Splash Pool Service Repair & Leak Detection
Blue Splash Pool Service Repair & Leak Detection
4.7(
50
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Cupertino, CA and surrounding areas

In business since 2001

Free estimates

Warranties offered

"Price quote was much lower than others, reviews from others very good, and BBB check showed he is BBB member with no complaints. Work was performed on time, included jackhammering out old skimmer from pool deck, installation of new skimmer, patch concrete, cleanup and rebalance pool water. Very pleased with the results."
BACK YARD REMODEL
BACK YARD REMODEL
BACK YARD REMODEL
BACK YARD REMODEL
BACK YARD REMODEL

+43

Response time7 hrs
Recommended by90%of homeowners
Avatar for LAR Construction & Remodeling
LAR Construction & Remodeling
5.0(
138
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Cupertino, CA and surrounding areas

In business since 2001

Free estimates

Credit card accepted

"We were referred to LAR Construction & Remodeling by a family friend and we contacted Gili, scheduled a meeting and provided him the vision of what we wanted to have and to also know how much we can spend. Gili came back with his laptop and with a 3D design of the pool including all the hardscape that by far surpassed all of our hopes and his proposal estimate was also within our budget (which means that he listened to us and understood our needs very good). Gili even made some modifications to the placement of the pool which maximized the space of the backyard. Gili estimated the remodeling project as a 3 months project (on a daily basis). We believed that it will take much longer because the type of the pool that needed a cut into the hillside, hardscape, sprinklers and more and more... But surly enough, they were done with the project a little bit longer than the 3 months. We do recommend Gili and all his team to anyone who is looking to design and build a pool. Gili helped us picking out all the colors for the stones around the pool."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+369

Recommended by96%of homeowners
Paramount Pool Plaster
3.9(
16
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Cupertino, CA and surrounding areas

In business since 1999

Credit card accepted

"They did an excellent job. The only issue was that after starting to chip away at the old plaster, they called me and told me that my pool had been replastered before. Therefore it had 2 layers of old plaster. That meant more work to chip it all the way down to the gunite. That would cost $1,500 more! I had chosen PPP because of their low bid and good reviews on Angie's List. I was very upset. Jorge said that he could replaster without stripping down to the the gunite. I told him that other companies specified in their estimate and quot;strip down to the guniteand quot;. He agreed to drop the surcharge to $1,200.
Notwithstanding this, PPP were still cheaper and did a superb job.
My recommendation to others is to make the contractor be very specific as to his assumptions and state what are the incremental costs if these assumptions turn out to be incorrect.Jorge is a very pleasant man who is a pleasure to deal with.
"
Recommended by91%of homeowners
Showing 1-10 of 35
Install Above Ground Pools questions, answered by experts

You don’t need to dilute the baking soda before adding it to your pool. While you can if you want, adding too much water into your pool can throw off your math and chemicals. Your pool’s circulation system will do most of the dissolving work for you, so it’s OK to skip the dilution.

You can build a plunge pool in an 8-by-8-foot space. Many plunge pools are about 8 to 12 feet wide, 2 to 24 feet long, and 4 to 8 feet deep. While these pools are smaller than your average swimming pool, you may want additional space for a deck or patio to surround the plunge pool.

Concrete pools have the longest life span. As long as you properly maintain your concrete pool, you can expect it to last 50 to 100 years. That said, you will need to resurface your concrete pool as it ages. Fiberglass is durable, but fiberglass pools generally only last around 25 to 30 years. That said, some high-end fiberglass pools can last more than 50 years if they’re well-maintained.

If your pool’s pH level is too high, chlorine won’t be as effective. Since chlorine is responsible for sanitation and keeping bacteria out of your pool, a high pH level could create a higher risk for bacterial diseases. It can also make you more susceptible to rashes and infections (like swimmer’s ear). Need to lower your pool’s pH? You can do it yourself for between $5 and $40.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Cupertino, CA homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.