Top-rated subcontractors.

Get matched with top subcontractors in Winneconne, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Winneconne, WI?

Select your specific project to find the pro for you.

TRUSTED BY WINNECONNE, WI HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon264
    Verified subcontracting services reviews

Find Subcontractors in Winneconne

Avatar for HAPPY HOME REMODELING, LLC
HAPPY HOME REMODELING, LLC
4.7(
30
)
Major Home Repairs (General Contractor)

Serving Winneconne, WI and surrounding areas

Approved

In business since 2017

Free estimates

Warranties offered

"Craig and his crew are great. I first came to know of Happy Home Contracting when my father was battling a terminal form of cancer. I saw Craig's truck down the road and I needed some help remodeling parts of my father's house that had been deeply abused by renters. Craig was reliable, charged a fair price, and does really quality work. He helped recreate a bathroom upstairs that really previously looked like it was from a slum house. The final result was something beautiful, modern, open, and full of light. He is easy to work with. He is someone that I trust deeply. And someone you can feel good about talking through concerns or questions throughout the process."
New countertops, new sink and faucet, painted existing cabinets, new hardware, new stove, and new fridge will arrive soon.
After Picture: New subway tile, grout, caulk, outlets, switches, and faceplates
Zillow proof of purchase, bought for $10,000 and sold for $105,000.
Madison Bathroom Remodel
Before and After of rec room. New everything.

+116

Response time4 days
Response rate100%
4 neighbors recently requested a quote
Avatar for Stendahl Exteriors
Stendahl Exteriors
4.1(
252
)
Major Home Repairs (General Contractor)

Serving Winneconne, WI and surrounding areas

In business since 2005

Credit card accepted

"It was great - they were quick and thorough. They even found a bit of flashing that was loose and repaired it. 
Followed up with an estimate to replace our roof. 
We would definitely use them in the future - I had my eyes out for the same deal from them this year!!
"
Before
During
Completion
Before
During

+3

Recommended by82%of homeowners
Avatar for PK Pro Contracting
PK Pro Contracting
5.0(
7
)
Major Home Repairs (General Contractor)

Serving Winneconne, WI and surrounding areas

In business since 1983

Credit card accepted

"They were great. I recently opened my new suite and needed flooring that wouldn’t ruin the base boards and the carpet. They did just that. They finished in a day and some hours. Also I needed them pretty last minute and he came asap and started working on the floors. It looks amazing. Highly recommend."
Before
After
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by100%of homeowners
Showing 1-10 of 34
Subcontractors questions, answered by experts

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

British architect John Nash is credited with creating the Italianate style of architecture. The style was further popularized in the U.S. by landscape architect Andrew Jackson Downing and architect Calvert Vaux. The style spread across the U.S. due to Downing’s popular book on the style and the availability of plans and materials due to the mass production of the Industrial Revolution.

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

The only real drawback to green building is that it’s more expensive up front, with per-square-foot prices sitting 33% higher than what you’d pay to build a traditional home. The higher cost is due to more expensive building materials and more labor to ensure every aspect of the home is as efficient as possible. However, green buildings often save money in the long run, so this is just a temporary downside.

The Winneconne, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.