Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Plover, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Plover, WI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Plover

Avatar for Jorge's Lawn Care
Jorge's Lawn Care
4.8(
6
)

Serving Plover, WI and surrounding areas

Approved

In business since 2019

Free estimates

Warranties offered

"They removed all mulch beds and a lot of shrubs. They replaced the mulch with new fabric and added rock. The weather was hot and humid but everything was finished in 2.5 days. It is exactly what I wanted."
White Marble Project
Planter Bed Turf
Natural Gray Veneer Steps
Clean and Natural
Back yard Upgrade

+96

4 neighbors recently requested a quote
Recommended by66%of homeowners
Showing 1-10 of 37
Asphalt Driveways questions, answered by experts

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

When hiring an asphalt paving contractor to install your driveway, ask as many questions up front as possible. Here are a few questions to ask a prospective driveway contractor:

  • How many years of experience do you have?

  • Are you licensed, bonded, and insured?

  • Do you have worker’s compensation?

  • Do you use subcontractors on your projects?

  • Do you clean up after the job is done?

  • Who is responsible for any damage to lawn or landscaping?

  • Do you provide a guarantee or warranty on your work?

  • Do you give free estimates?

  • What is the timeline for completion?

  • How do you handle change orders?

  • Can you provide at least three references?

  • Can I see some of the work you’ve done?

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

Asphalt driveways are affordable and able to withstand sub-zero temperatures. The asphalt surface makes it easy to plow snow, and it has excellent traction for slippery winter days. Another benefit: it absorbs heat from the sun and can then help to melt snow and ice more quickly than other surfaces.

The Plover, WI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.