Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Hatley, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Hatley, WI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Hatley

Avatar for Smith Handyman & Landscaping
Smith Handyman & Landscaping
5.0(
7
)

Serving Hatley, WI and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Emergency services offered

Small jobs welcome

"Installed a small dishwasher in our kitchen and put a whole new shower surround around our cast iron tub and decorated that as well. Looks amazing! Will be reaching out to them again if I need anything done!"
Response time2 days
3 neighbors recently requested a quote
Recommended by28%of homeowners
Avatar for Scott Brandt Mini Excavation And Demo LLC
Scott Brandt Mini Excavation And Demo LLC
5.0(
9
)

Serving Hatley, WI and surrounding areas

Approved

In business since 2024

Free estimates

Emergency services offered

"Scott Brandt did a demolition and hauled away a shed and leveled the area. He showed up when scheduled and did a great job! Also, took down a tree and hauled away and cleaned up after. I would recommend Scott anytime. Fair price and great to work with."
Driveway
Demo
Dirt moving
Mulch
Mulch

+6

Avatar for Jorge's Lawn Care
Jorge's Lawn Care
4.8(
6
)

Serving Hatley, WI and surrounding areas

Approved

In business since 2019

Free estimates

Warranties offered

"Fantastic job done extremely well and effectively. Everything looks better than expected. Will be hiring for another project coming soon."
White Marble Project
Planter Bed Turf
Natural Gray Veneer Steps
Clean and Natural
Back yard Upgrade

+96

4 neighbors recently requested a quote
Recommended by66%of homeowners
Avatar for Jorge's Lawn Care
Jorge's Lawn Care
5.0(
4
)

Serving Hatley, WI and surrounding areas

In business since 2019

Free estimates

Emergency services offered

"They removed all mulch beds and a lot of shrubs. They replaced the mulch with new fabric and added rock. The weather was hot and humid but everything was finished in 2.5 days. It is exactly what I wanted."
Appleton WI project
Lake Front Cabin
Basketball court concrete pad
This is a light gray custom pattern patio with a dark gray boarder.
Stevens Point Patio

+160

Response time1 day
Response rate94%
Recommended by100%of homeowners
Showing 1-10 of 39
Asphalt Driveways questions, answered by experts

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

Even with regular maintenance, most driveways don’t last much longer than 30 years. Alligator cracking is a clear warning sign that your driveway’s foundation is failing, and cracks that are deep and wide can let water in, causing more damage. Standing water is another red flag. If your driveway doesn’t drain properly, it’s going to degrade slowly. Finally, if you’re seeing dips or uneven patches, that’s a sign the base layer or soil is shifting. If these issues pop up, it’s time to replace your driveway.

Chip seal layers gravel and a liquid bitumen one at a time on-site, while asphalt directly pours a pre-combined mixture. Asphalt must be sealed, but it will last up to four times as long as chip seal driveways. Aesthetically, chip seal has a natural, rustic look compared to the traditional asphalt slab.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Like all driveway materials, asphalt can crack in the wrong conditions and with age. Many things can cause asphalt to crack, including shifting soil or settling under the foundation. Other common causes are driving oversized vehicles on the asphalt, tree roots, and using rock salt during the snowy season. Proper installation and sealing the driveway every 10 years can help prevent cracks.

The Hatley, WI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.