Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Stevens Point, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Stevens Point, WI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Stevens Point

Hamland Construction Company
4.9(
8
)
Brick and Stone Driveways & Floors - InstallConcrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Stevens Point, WI and surrounding areas

Approved

In business since 2008

Free estimates

Customers say: Quick response

"Very helpful. Took on additional work at a reasonable price. Managed to match 60 year old brick. Very fastidious about getting mortar repairs to match existing colors."
Basketball Court
Basketball Court Prep
Brick ledges with Stone Top
Steps with 10 Inch Curb
Steps with Design in Handrail

+25

Response time1 day
2 neighbors recently requested a quote
Recommended by100%of homeowners
B&E Asphalt
4.0(
14
)
Asphalt SealingAsphalt Paving - InstallAsphalt Paving - Install- For Business+3 more

Serving Stevens Point, WI and surrounding areas

Approved

In business since 1995

Free estimates

Credit card accepted

30 Years Experience \nYour satisfaction isn’t just a goal—it’s our promise. We pride ourselves on being more than just a provider; we are a partner you can trust. By combining thorough, high-quality work with a proactive approach to your concerns, we ensure every detail is handled with integrity and speed. We uphold the highest ethical standards so you can rest easy. Let’s get started—call us today! 608-567-9259\n

Asphalt work
Asphalt work
Asphalt work
Asphalt work
Asphalt paving

+8

3 neighbors recently requested a quote
Recommended by72%of homeowners
CM Customs LLC
New to Angi
Interlocking Pavers for Driveways & Floors - Install

Serving Stevens Point, WI and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

I have 20 years of experience in the masonry and concrete industry. I also have 10+ years with carpentry and general trades. 10 years of project management experience managing projects from a few hundred dollars to multimillion dollar. Thank you for taking the time to read and looking forward to working with you..

Showing 1-10 of 48
Asphalt Driveways questions, answered by experts

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Recycled asphalt is not better than gravel, but can be a good alternative. It is inexpensive, but not as low-cost as gravel, and doesn’t tend to last as long. Recycled asphalt isn’t as dusty as gravel and is more environmentally friendly. The black look can be something that homeowners prefer. No matter what, ensure you choose an experienced recycled asphalt contractor. 

The Stevens Point, WI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.