
Serving Triangle, VA and surrounding areas
Approved
In business since 2002
Free estimates
Emergency services offered
"As with a lot of homeowners, we were scared stiff about starting a home remodeling project after all of the horror stories we had heard from friends. We were pushed off the edge by a master shower that stopped working and could not be repaired without tearing up the walls. We dove in after reading great reviews about VKB and totally lucked out by getting matched up with Calvin when we walked into the store. From start to finish this has been an amazing experience starting with the design phase, to demolition, construction, and final walk through. Calvin was perfect for us. He first asked us to collect pictures of bathrooms while he took meticulous measurements of our space. He then held our hands through what he called an “organic process” of designing our dream bath. What was really fantastic was when we had to choose tile, he walked us next door to the humongous tile store (where he was previously the store manager!) and smoothly guided us through one of the hardest choices to make with the perfect recommendations. The project was then handed to Al, the construction manager, and again we totally lucked out. I highly recommend this team of Calvin and Al. The construction phase went super smoothly. The workers are extremely clean and respectful. Everyday they lay down clean tarps and cover the carpet they are walking on with sticky plastic sheets. (We have white carpet upstairs and after they were done and a quick vacuum it is absolutely good as new!) Demo day was painless, no dumpster... just hand carried away in a truck. Construction happened pretty much daily from 8-4. We didn’t have to be home when the team was here and we felt absolutely comfortable leaving them home unsupervised. I am an orthopedic surgeon so I’m very precise about measurements. Each night I would sneak into the bathroom and measure everything, and I’m telling you all of the measurements were spot on! Also of note, they taped up two plastic sheet barrier walls between the master bedroom and bath which left the bedroom perfectly clean and livable with zero dust. We slept in our own master bed during the whole master bath remodel. In the end the project took one week longer than expected (this happened over Xmas holiday) and right on budget with no HGTV surprises. Al kept in close touch throughout the project and would text back immediately whenever we texted him with a question. Jose was also incredible during the entire remodel. We absolutely love our new bathroom and we honestly can’t think of any choice that we would change looking back. After this fantastic experience we are already planning our kitchen remodel with VKB next year. I will absolutely insist on my same team of Calvin, Al, and Jose. I have no fear of my next remodeling project"





+1053























































