Top-rated subcontractors.

Get matched with top subcontractors in Riner, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Riner, VA?

Select your specific project to find the pro for you.

TRUSTED BY RINER, VA HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon369
    Verified subcontracting services reviews

Find Subcontractors in Riner

Avatar for Titan Handyman LLC
Titan Handyman LLC
5.0(
8
)
Major Home Repairs (General Contractor)

Serving Riner, VA and surrounding areas

Credit card accepted

"I highly recommend Titan! Titan performed a highly quality job at an excellent price. They kept in contact with me, even when I wasn’t in the area. They were recommended to me by a neighbor who used them and was very satisfied. If needed, I will not hesitate to use Titan again."
Roof damage due to leaking
After retaining wall and a whole lot of hard work!
Remodeling - General Project
Roof rot removed
Before retaining wall.

+6

Recommended by100%of homeowners
Avatar for B & B Services
B & B Services
4.5(
16
)
Major Home Repairs (General Contractor)

Serving Riner, VA and surrounding areas

In business since 2018

Free estimates

Emergency services offered

"Our furnace motor was making a loud noise, and Chris Suttles came by and diagnosed the problem shortly after I called. He fixed the problem that afternoon, and the furnace is now quieter than it's ever been. I asked him to come by the next week and give the furnace a tune-up and clean the heating ducts. When Chris opened one of the supply ducts, he found the inside of the ducts had a sticky, oil-like coating. I decided to replace the ductwork, and he replaced all of the ductwork in 2 days. The air coming out of our vents is now cleaner, warmer, and stronger."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+4

Recommended by92%of homeowners
Avatar for Nesting Sensations
Nesting Sensations
5.0(
4
)
Major Home Repairs (General Contractor)

Serving Riner, VA and surrounding areas

In business since 2013

Free estimates

"I had Will come to the house on two separate occasions to install baby gates and to pressure wash the front porch. He did such a good job and I look forward to hiring him for any jobs in the future!"
Underground plumbing and electrical building feeds
Handyman Services Project
Underground plumbing and electrical building feeds
Additional Photos
Additional Photos

+13

Recommended by100%of homeowners
Showing 1-10 of 43
Subcontractors questions, answered by experts

The costs depend on the type of wood, labor, roofing material, permits, and whether additional storage or enclosed walls are included.

An architect is usually involved in the process of determining the layout and structural features and requirements of the home itself, taking into account the local codes, climate, and materials needed to make the home structurally sound. Architects may communicate more with contractors and subcontractors throughout the building process. In comparison to architects, interior designers typically focus on the aesthetics of a home interior and possibly exterior, helping the homeowner decide on color schemes, textures, and materials to incorporate into the design. 

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

The Riner, VA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.