Top-rated subcontractors.

Get matched with top subcontractors in Pembroke, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Pembroke, VA?

Select your specific project to find the pro for you.

TRUSTED BY PEMBROKE, VA HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon30
    Verified subcontracting services reviews

Find Subcontractors in Pembroke

Avatar for B & B Services
B & B Services
4.5(
16
)
Major Home Repairs (General Contractor)

Serving Pembroke, VA and surrounding areas

In business since 2018

Free estimates

Emergency services offered

"Our furnace motor was making a loud noise, and Chris Suttles came by and diagnosed the problem shortly after I called. He fixed the problem that afternoon, and the furnace is now quieter than it's ever been. I asked him to come by the next week and give the furnace a tune-up and clean the heating ducts. When Chris opened one of the supply ducts, he found the inside of the ducts had a sticky, oil-like coating. I decided to replace the ductwork, and he replaced all of the ductwork in 2 days. The air coming out of our vents is now cleaner, warmer, and stronger."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+4

Recommended by92%of homeowners
AC Home Improvements
5.0(
6
)
Major Home Repairs (General Contractor)

Serving Pembroke, VA and surrounding areas

In business since 1995

Free estimates

Credit card accepted

"I found A/C Home Improvements through Angie's list and my wife and I are glad we did! Tony and Terry was very professional and what impresses me the most is they stick by their word. Their work shows experience and will stand up with any contractors. They installed the floor, backsplash, a new microwave and under cabinet lighting as well as a ceiling light. We also re-faced our oak cabinets and it was sub-contracted out by Poff's Cabinetry in Martinsville VA and I highly recommend them as well!! We saved over half refacing the cabinets and they look brand new. Amazing work by both and will use them in the future for any kind of job we have!!"
1
2
1
2
3

+24

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Pembroke, VA and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 21
Subcontractors questions, answered by experts

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Check reviews, compare quotes, and verify licensing. Ensure the builder has experience with modular construction.

Mediterranean architecture comes from traditional building styles of countries on the Mediterranean Sea mixed with French, Greek, and Moroccan influences. There are three main types of Mediterranean architecture: Italian Renaissance, Spanish Revival, and modern.

Some signature components of Mediterranean architecture include red terra cotta roofs, archways, stucco siding, and metal detailing on windows. These homes often have balconies and outdoor living areas.

British architect John Nash is credited with creating the Italianate style of architecture. The style was further popularized in the U.S. by landscape architect Andrew Jackson Downing and architect Calvert Vaux. The style spread across the U.S. due to Downing’s popular book on the style and the availability of plans and materials due to the mass production of the Industrial Revolution.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

The Pembroke, VA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.