Top-rated subcontractors.

Best subcontractors near Minerva park, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Minerva park, OH?

Select your specific project to find the pro for you.

TRUSTED BY MINERVA PARK, OH HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon19.4k+
    Verified subcontracting services reviews

Top-Rated Subcontractors in Minerva park - Updated Nov 2026

Mose Troyer Carpentry/Cabinetry
5.0(
52
)
Major Home Repairs (General Contractor)

Serving Minerva park, OH and surrounding areas

Approved

In business since 2000

Emergency services offered

Customers say: True professional

"Mose, was able to create the front panels for a new KitchenAid refrigerator. He also had to match the type of wood and stain to match the rest of the kitchen. The work was excellent. I would definitely hire again."
Bookcase
Response time3 days
Response rate100%
2 neighbors recently requested a quote
Avatar for Dave's Carpentry
Dave's Carpentry
4.5(
87
)
Major Home Repairs (General Contractor)

Serving Minerva park, OH and surrounding areas

Approved

In business since 1996

Free estimates

Warranties offered

"I wanted straighter/level deck & edges of a 97 year old slate roof before removing the slate, replacing the deck, and replacing the slate with asphalt shingle. My thought was to prop low spots in the wavy front edge in front, and prop the sagging corners in back; then, to build triangular braces similar to one extant on the house, like many on houses of similar age and design in the neighborhood. The idea of propping the low spots was dismissed, discussed again, and eventually dismissed as unnecessary; the low spots were forced up by hand, and fascia boards attached. While I was told the weight of the new roof might drop the level of the low spots again, this may have been more than anticipated; in retrospect it may have been preferable to force the low spots higher than could be done by hand, as the discrepancies from linear in the edges of the roof have, I think, caused inability to properly interface the drip edges and guttering at many places. I would though hire Dave's again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+15

Response time1 day
Response rate100%
1 neighbors recently requested a quote
Avatar for Steger Renovations
Steger Renovations
4.5(
31
)
Major Home Repairs (General Contractor)

Serving Minerva park, OH and surrounding areas

Approved

In business since 2013

Free estimates

Emergency services offered

"Tim did a fantastic job with our kitchen. He worked with us through the process, coming up with solutions when we encountered unexpected challenges. His craftmanship is remarkable. Tim tore out our kitchen and drywall, installed new drywall and overhead lights, a new ceiling, installed new cabinets, and installed the tile backsplash. Everything looks better than we could have imagined! We will certainly hire him for any future projects. His estimated timeline was perfect and he started right when expected. Fantastic contractor!"
3 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Holy Roller Painting
Holy Roller Painting
4.2(
25
)
Major Home Repairs (General Contractor)

Serving Minerva park, OH and surrounding areas

Approved

In business since 2000

Free estimates

Customers say: Quality work

"Jim from Holy Rollers submitted an estimate to us and was very professional & thorough. I will be looking them up for further jobs needed & definitely recommend them to anyone looking for an upstanding company and professional job to be done."
High-end
Transformation
After
Decks
Pergola

+5

Response time10 mins
Recommended by85%of homeowners
...
Showing 1-10 of 316
Subcontractors FAQs, answered by experts

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

Expect excavation below grade, creating a well for access, weatherproofing, and thorough inspections during setup.

Yes, professionals offer custom designs, including lattice tops and decorative post caps.

When conducting space planning, building codes and regulations need to be considered. As long as you are taking them into account and discussing them with the architect, you should be able to do your space planning appropriately.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The Minerva park, OH homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.