Top-rated subcontractors.

Get matched with top subcontractors in Supply, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Supply, NC?

Select your specific project to find the pro for you.

TRUSTED BY SUPPLY, NC HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon913
    Verified subcontracting services reviews

Find Subcontractors in Supply

Avatar for Advantage Construction
Advantage Construction
4.6(
66
)
Major Home Repairs (General Contractor)

Serving Supply, NC and surrounding areas

Approved

In business since 1988

Free estimates

Warranties offered

"Things went better than we could have ever expected. Corky and his crew were amazing on all accounts. Whenever I thought a project was overwhelming he was calm, cool, and collected and he came up with the best solution for a price that was far below what I had anticipated. Since meeting Corky I have referred him to all of my friends and family. I would never go to anyone else. Thank you immensely, Corky and Crew!!!!"
Response time4 days
7 neighbors recently requested a quote
Recommended by89%of homeowners
Avatar for Maya's Painting & Renovation Services
Maya's Painting & Renovation Services
5.0(
10
)
Major Home Repairs (General Contractor)

Serving Supply, NC and surrounding areas

Approved

In business since 2017

Free estimates

Emergency services offered

"Jimmy was fantastic with his work and communication. I've had contractors + builders that could go days without communicating. Jimmy always got back in an appropriate amount of time. The work his team was fantastic. They converted our dining room to a home office and remodeled all three of our bathrooms."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+11

7 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Bachert Builds
Bachert Builds
4.5(
66
)
Major Home Repairs (General Contractor)

Serving Supply, NC and surrounding areas

In business since 2001

Free estimates

Emergency services offered

"Once again Bachert Builds came through for us in a big way. We couldn't?t be happier with their work on our kitchen remodel.  As was the case with the other jobs they have done for us in our home, Chester and his crew were personable, pleasant, and
wrapped up each day with a thorough cleaning of their workspace and surrounding areas. I can?t say how important it is to find someone who you can not only trust to do the work correctly, but who also takes exceptional pride and care
in that work. Chester and his crew often went above and beyond to make us happy, and it was a relief to know that we could entrust our home with all of them. Over an 8 week* remodel it?s impossible to be present every moment, but we never doubted their care for our home and belongings for a second when we were away. All of Bachert Builds? subcontractors treated us, and our home, with
great respect. Chester?s attention to detail and his understanding of OUR attention to detail helped make this remodel a great success. He was easy to get a hold of and always available to solve problems as they arose, he was also able to help with the issues that came up with the other company we were working with.  We?ll be forever grateful for the love he put into our kitchen, it is the new center of our home and we can?t wait to start the next home project on our list for him.    
*the original timeline was more like 5-6 weeks, the change to 8 weeks was outside their control."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

Recommended by87%of homeowners
Mighty Hands Roofing Inc
4.2(
461
)
Major Home Repairs (General Contractor)

Serving Supply, NC and surrounding areas

In business since 1986

Free estimates

Emergency services offered

"After the repair was done I noticed a leak in my bathroom ceiling where one of the roof vents were replaced. I called the Subcontractor Brian on a Saturday morning. The weather was cold and raining. He was at my house within the hour up on the roof and fixed the leak. I havent had any leaks since. I would hire Brain the Subcontractor again."
Recommended by80%of homeowners
Avatar for ABX Contracting
ABX Contracting
3.9(
79
)
Major Home Repairs (General Contractor)

Serving Supply, NC and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"

On Monday Chuck and the foreman came to start work on the kitchen floor. I was told I needed more tiles so I went and purchased them. When I returned, tile was being laid, I asked if he removed the old tile and was told it wasn't necessary. They came back Tuesday and finished laying tile and when the foreman put the thresholds down it was not level at all. The new tile is thick. I'm not happy with that as it has become a tripping problem. I was told by the foreman to take a wet sponge and wipe the grouting powder the next day as it wasn't worth his while to drive all that way to do. So I had to do it myself with my bad knees. It took 4 months to obtain a receipt for the job.


"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Recommended by88%of homeowners
Avatar for Craftsman Direct Handyman Home Improvement
Craftsman Direct Handyman Home Improvement
4.1(
321
)
Major Home Repairs (General Contractor)

Serving Supply, NC and surrounding areas

In business since 2002

Free estimates

Credit card accepted

"I contacted three different providers to give quotes on adding a 12'x16' deck extension to the existing deck. This would be about 1.5 feet off the ground and covering an existing concrete slab. Craftsman contacted me and scheduled Kevin H. to come out to perform the estimate and he did so on 08-Jun-2015. Kevin's demeanor was professional and he seemed knowledgeable and focused on providing what I wanted. We received the estimate from him 3 days later for $3300-$4000 labor and $750 materials. We were told at that time that scheduling was 1-2 weeks out. While Craftsman was the highest bid, we decided to go with them because they seemed knowledgeable and slightly more "polished" than the other potential contractors, and one of the important factors for us was that they could start work in 1-2 weeks as we were eager to get the deck finished so we could do some other projects around the deck. 
On 14-Jun-2015 we sent the email accepting the proposal and on 15-Jun-2015 Kevin confirmed receipt and stated Laura would send over the contract to sign and schedule us. He re-affirmed that we were 1-2 weeks out on the schedule. Later that day, I received a follow-up email from Kevin informing me that the engineering plan they would work from is my responsibility and provided me with the name of an engineer and told me I will pay the engineer directly. This was the first time that I was told I had to separately contract, schedule, and pay for additional services outside of the bid. I was told at this time we would hold off on the contract until the engineer came out and provided a more concrete plan so the contract could be more accurate. I was assured at that time that we would keep our place in schedule so we didn't go to the end of the line. We weren't happy with this development but moved forward. 
I contacted the engineer (which I am not sure that was needed for such a small deck project) and he agreed to come to the house and meet me on 16-Jun-2015. He arrived on time and gathered the information for the engineer plan. He indicated that the plan would be to me on 18-Jun-2015. When I didn't receive it by 22-Jun-2015 I contacted him and he said he was finishing it up and would send that day. I later that day received an invoice and was told that I couldn't have the sealed plan until I paid the invoice. I paid the $210 and on 23-Jun-2015 finally had an engineer plan which was shared with Kevin. 
Finally on 01-Jul-2015 I received a contract to sign. The contract included $3,358 in labor and an estimated materials of $850 (a minor increase of $100, but certainly acceptable as the first was done without the engineering plan). It is worth noting that one of the reasons I went with this highest bid was because of their scheduling estimates which were to begin work within 1-2 weeks. At this point we are at 2 weeks + 2 days.
Kevin confirmed some information and informed me that he would order materials and have them delivered to the house and that work would begin on Wednesday, 08-Jul-2015. I scheduled to be home from work that day. On Tuesday I was informed that they were running long on another job and wouldn't start until Thursday. On Wednesday I was informed that the materials couldn't be delivered until Friday, so work wouldn't begin until Monday, 13-Jul-2015. We are now beginning work 2 days shy of 4 weeks after accepting the bid, nearly double the time we were told when we chose them over the others.
On 13-Jul-2015, two sub-contractors arrived to begin work, Mike and Steve. They worked through the day and realized they needed a few more materials than were ordered. They came back and worked the next two days and we had the basic work complete. They had another job to do on Thursday, which was fine and then worked again on Friday and ordered more composite as there wasn't enough to complete. They worked again on Monday for a bit and then came back on Tuesday once additional trim was received. The composite was completed on Wednesday morning. 
At some point about half way through the work, I was informed that the materials were going to cost more than estimated. It wasn't a 20% overrun like I would expect. The materials were completely mis-estimated and instead of the $850 that was in the contract, materials were going to run over $2000. At first it was presented to me as though I misread the contract and that these costs were in there, just not spelled out as clearly as they should have been. When I stated this wasn't so and asked that I be shown where in the contract, it was acquiesced that Kevin had simply "messed up" in creating the initial estimate. He stated that this was only the second deck he had done an estimate for, which was a surprise given that during the bid process we were led to believe there was decades of experience going into this process. 
So, on 22-Jul-2015, we had a finished extension to our deck. The final bill was $5663.00, which included $2175 in materials vs. the $850 we agreed to when we signed the contract. We paid Kevin and the transaction was complete. It was another 5 days before the 'bagster' service picked up the bag on our lawn that had all the trash and scrap materials. An unfortunate note on this is that instead of putting this bag on the driveway, where there was ample space to do so, they put it on the grass. several weeks of that bag on grass ended up that my front yard now has a 5'x8' spot of "dead" in the middle of it. That was poor planning on the part of whomever decided that would be where that bag was placed (picture of the dead spot below as well).
I thing or two that I want to note on this review. I tried to give an honest account of how it went. It isn't an indictment of the people involved. Kevin was extremely nice and professional and he was apologetic for the errors in estimating the materials and the delays. Mike and Steve, the guys doing the actual work, were outstanding, professional and did a GREAT job on the deck. We couldn't be happier with the final product (pictures below).
"
Wood Rot
Tiered Deck
Basement finishing
Call The Boss
Recommended by91%of homeowners
Avatar for C & J Hunt Construction Services LLC
C & J Hunt Construction Services LLC
4.1(
68
)
Major Home Repairs (General Contractor)

Serving Supply, NC and surrounding areas

In business since 2007

Free estimates

Credit card accepted

"Charlie is very professional.  His prices may be a bit high, but I am a firm believer you get what you pay for.  The quality of this workers and subs was wonderful.  He even has a division that made a custom vanity for the master bath that matched a cabinet we had in there for towels and linens.  He has a good attention to detail.  He was patient working with our condo association that had problems with the new windows he installed and made sure that both groups were happy in the end with the work he did.  We love the work he did on the two rooms and would hire him again.
"
Bloomfield Garage
Cassata Built-In
Sadler Renovation
Recommended by85%of homeowners
...
Showing 1-10 of 96
Subcontractors questions, answered by experts

You can draw your own house plans using three-dimensional modeling software, but in most cases, you’ll need an architect to draw up the final plans. Architects understand local building regulations and requirements, so their plans will be necessary for getting permits approved, and they’ll also ensure your home is structurally sound. DIY house plans can be a good place to start to help visualize your project, but you should always defer to a professional before trying to proceed with the project.

The country's most famous Neoclassical architecture appears in major government buildings and college campuses. The White House is unmistakably the most famous example, though the Capitol Building and Thomas Jefferson's Monticello are also iconic uses of the design.

Costs depend on project complexity, materials, labor, permits, and required revisions.

Yes, you can finance cottage construction through several options. Construction loans provide funds in stages as work progresses, while home equity loans or lines of credit are available if you have existing property. Some lenders offer a combined construction and permanent mortgage. Always review loan terms and payment milestones before committing.

Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.

The Supply, NC homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.