Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Ulm, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Ulm, MT?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Ulm

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Ulm, MT and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

You should add one 3-inch chlorine tablet for every 5,000 gallons of water in your pool. If you have a smaller pool, it’s better to use 1-inch chlorine tablets so you don’t accidentally add too much chlorine. Alternatively, you can add two to three ounces of powdered chlorine or half a gallon of liquid chlorine for every 5,000 gallons of water.

You can install an aboveground pool on various surfaces, including dirt, sand, concrete, and grass. You can’t install a pool on an uneven surface, though, so be sure to level the ground before building your pool. You also can’t install your pool on top of a rocky surface. Three or 4 inches of smooth sand or soil is the ideal surface to go under an aboveground pool.

Filter balls don’t work as well as sand filters because they’re unable to handle large debris, are prone to clogging, and require frequent cleaning. While they can seem more convenient and less expensive than sand filters, most need to be removed and washed regularly, or they won’t filter well and struggle with algae and dirt. Speak with your pool maintenance pro about the best filtration option for your pool.

Your contractor will need several days to several weeks as far as a timeline to install your semi-inground pool goes. Adapting an aboveground pool to be semi-inground by excavating and partially burying the liner, for example, will only take three to five days, while installing an in-ground pool with a poured concrete liner and building up the land around it will require several weeks. Keep in mind that the process of hiring a pool contractor and applying for permits can add several additional weeks to the total timeline.

Completely refreshing the water in an aboveground pool every five to seven years helps keep it free of bacteria and algae. Emptying the pool also allows you to clean, repair, or replace the pool liner. Schedule your water change when the weather is mild, as intense heat or cold can damage the pool liner when the pool is empty.

The Ulm, MT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.