Install Above Ground Pools questions, answered by experts

Pool remodel costs average over $9,000, so what about converting your pool to salt water instead? It is certainly an investment on the front end, but homeowners stand to save money on maintenance by switching to a saltwater pool. You will need to replace the salt cell every five years or so, but you will not have to clean your pool as frequently, either. The smell of chlorine also will not be on your swimsuits or skin, which is a benefit many appreciate.

You'll feel the most comfortable in pool water between 78 and 82 degrees Fahrenheit. Lower temperatures are a bit brisk, while higher temperatures can lead to algae and cloudy pool water. Choose a pool heater that either runs automatically when your water dips below 78 or switch it on several hours before using the pool for the day.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Yes, pool designs can be customized to accommodate specific preferences, allowing for unique shapes, personalized tiling, special lighting features, water fixtures, and varying depths to create bespoke leisure experiences.

Hire a licensed pool contractor in your area with ample experience in your particular pool design. Pool contractors will walk you through both the design and installation process. They will also recommend or hire a team of subcontractors to manage clearing the land, excavating for the pool, and adding all the design and electrical touches that make your pool run smoothly.

The Galata, MT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.