Top-rated subcontractors.

Get matched with top subcontractors in Minnetonka, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Minnetonka, MN?

Select your specific project to find the pro for you.

TRUSTED BY MINNETONKA, MN HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon9.9k+
    Verified subcontracting services reviews

Find Subcontractors in Minnetonka

Avatar for Landson Construction
Landson Construction
4.8(
37
)

Serving Minnetonka, MN and surrounding areas

Approved

Free estimates

Warranties offered

Customers say: True professional

"Phenomenal work from all involved in this project. Project ran smoothly and Ari went above and beyond to meet our needs. All subs did great work and were professional throughout. We would definitely recommend Landson Construction to others!"
Roofing Project, concrete walkways, window wells
Concrete Driveways Project
Roofing Project, concrete walkways, window wells
Concrete Driveways Project
Roofing Project, concrete walkways, window wells

+14

6 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for HIGGINS CONSTRUCTION
HIGGINS CONSTRUCTION
4.9(
56
)

Serving Minnetonka, MN and surrounding areas

Approved

In business since 1992

Free estimates

Emergency services offered

"Working with Higgins Construction was a great experience for our family. If questions or concerns arose throughout the project we were able to discuss those things and come to a remedy to correct the question or concern. The crew of people that they have working for them and the subcontractors they brought in were all professional and courteous. They are very fair on their pricing and when they discovered some things that would help with insulation on our home or structural issues in our soffits - they immediately had a clear explanation for their suggestion and price for that to be fixed. Our project consisted of the following: Roof, chimney rebuilt from roofline up, new garage door, siding, shutters, cupola, soffits/facia/gutters, cedar posts on porch, lighting in soffits above the garage door."
Complete bathroom remodel featuring a marble counter top, wooden vanity, sconce lighting and updated hardware.
Installed new hardware, crystal sink and marble countertops.
After 2.0
After
Before

+163

9 neighbors recently requested a quote
Recommended by95%of homeowners
Avatar for Fine Line Builders LLC
Fine Line Builders LLC
4.8(
60
)

Serving Minnetonka, MN and surrounding areas

Approved

Super Service Award Winner

In business since 2018

Free estimates

Customers say: Quick response

"Dan at Fine Line Builders was great to work with. He listened and brought back ideas. Project was completed timely and done with a high degree of quality. I would definitely hire him again for a remodeling project the basement looks great, love the bathroom, family room and home theater room."
Completed Projects
Completed Projects
Completed Projects
Completed Projects
Completed Projects

+30

Response time3 hrs
Response rate97%
6 neighbors recently requested a quote
Avatar for Xpres Bath & Shower
Xpres Bath & Shower
4.5(
62
)

Serving Minnetonka, MN and surrounding areas

Approved

In business since 2017

Free estimates

Warranties offered

"XPres did a great job. Roxie was enormously helpful in choosing materials and (bonus) was fun to work with on the project. They were always very responsive to my questions or concerns. I would hire them again."
Decks
Bathroom Remodeling | Showers | Tubs
Showers
Edina Open Kitchen
Edina Open Kitchen

+34

Response time1 day
113 neighbors recently requested a quote
Recommended by57%of homeowners
Baillie Remodeling, Inc.
4.4(
71
)

Serving Minnetonka, MN and surrounding areas

Approved

In business since 1992

Free estimates

Emergency services offered

"Bill did all the finishing work on the basement we are completing. Bill started working for us after we had just let another trim worker go because of his poor workmanship. Bill not only showed excellent quality of work, but he fixed all of the mistakes the 1st guy we hired did. I also appreciated the time that Bill took to communicate the progression of the project every step along the way. We would definitely hire Bill again if we were to do another project!"
New cabinets & corian top
1954 Kitchen Demo.
Partial Bathroom Remodel
 Garage
Siding and Repairs

+32

1 neighbors recently requested a quote
Recommended by95%of homeowners
...
Showing 1-10 of 317
Subcontractors questions, answered by experts

The cost to draw house plans typically ranges from $800 to $2,700, with standard blueprints averaging around $1,800. For a custom home, the cost is higher, with blueprints often falling between $5,000 and $20,000, and potentially more for very complex designs. Several factors influence the total price, including the project's size, the number of rooms, the type of drawings required, and the architect's experience level. You may also need to pay a structural engineer to ensure building safety, particularly for custom homes.

Builder-grade is one of two types of stock cabinets, whereas semi-custom designs allow homeowners some control over the color, finish, or hardware on their cabinets. Stock cabinets are sold in construction-grade and builder-grade designs. Construction-grade cabinets are usually made from inexpensive medium-density fiberboard, which is prone to moisture damage, whereas builder-grade models are a step up with higher-quality materials. Construction-grade designs are the most common type of cabinets in America.

You don’t have to commit to a complete home renovation to age in place comfortably—those can get pricey. Instead, focus on a few impactful changes. Consider adding a stair lift or installing ramps to eliminate barriers. Upgrading to non-slip flooring can prevent falls while adding brighter lighting can improve visibility throughout your home. These thoughtful updates can make your home much easier to navigate and enhance your comfort and safety without the stress and cost of a complete overhaul.

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

The only real drawback to green building is that it’s more expensive up front, with per-square-foot prices sitting 33% higher than what you’d pay to build a traditional home. The higher cost is due to more expensive building materials and more labor to ensure every aspect of the home is as efficient as possible. However, green buildings often save money in the long run, so this is just a temporary downside.

The Minnetonka, MN homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.