Top-rated solar panel pros.

Best solar panel pros near Birmingham, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Birmingham, MI?

Select your specific project to find the pro for you.

Top-Rated Solar panel pros in Birmingham - Updated Nov 2026

Avatar for Affordable Water Heaters LLC
Affordable Water Heaters LLC
4.9(
49
)
Solar Water Heater System - RepairSolar Water Heater System - Repair - For Business

Serving Birmingham, MI and surrounding areas

Approved

In business since 1996

Free estimates

Emergency services offered

Affordable Water Heaters is a full-service water heater repair, replacement and installation company offering residential water heaters. We are a licensed and insured plumbing company that specializes in Water Heaters! Local offices in the Detroit, Kalamazoo, Grand Rapids areas. \n \nAffordable Water Heaters has been specializing in all aspects of water heater replacement and repair service since 1996 and is considered an expert in the industry. Absolutely the highest quality work for the lowest price is our guarantee. Our years of experience, along with the use of quality products and pride in our workmanship has kept our valued customers returning for all their hot water needs.

Recommended by32%of homeowners
Avatar for Solari Energy Consultation
Solari Energy Consultation
5.0(
5
)
Solar Panel Install

Serving Birmingham, MI and surrounding areas

In business since 2018

Free estimates

Credit card accepted

"Solari energy is great. They guided me through financing, and I was able to pay nothing down. I spoke with my tax representative, and I qualified for the federal renewable tax credit as well. They put in a 12 kW system with a 9 kW battery backup at my house. They made the whole process easy. The installation team was fantastic and friendly. Any questions I had, Solari got back to me that day."
5kw Ground Mount
8kw Ground Mount
11.4 kw East/West rood mount
9.6kw Standing seam roof mount
4.3kw Roof mount.

+8

Response time11 hrs
Response rate100%
Recommended by100%of homeowners
...
Showing 1-10 of 61
Solar Panels FAQs, answered by experts

While you can minimally overshoot the number of solar panels you need for your home, it's not smart to go too far. Not only is the extra cost unnecessary, but your state may put caps on how much energy your home can produce and send back to the grid. It is always best to work with a solar energy professional to determine the best system size for you.

It’s possible that installing solar panels can lead to mold on the roof. The panels themselves are not the issue. Problems caused by improper installation—such as roof leaks and mounts that aren’t sealed properly—can cause mold. Another potential cause of mold is debris accumulation under panels, which can trap moisture. If you live somewhere with extreme snow, rain, or hail, your home could be more prone to mold.

The best solar panels to withstand hail are those rated UL 61730. These solar panels are certified to withstand hailstones up to 3 inches in diameter and travel at speeds up to 88 mph. IP68 solar panels are the next most resilient solar panel. Solar panels without these ratings can handle hail up to 1 inch in diameter that travels up to 50 miles per hour. If you live in an area with frequent or severe hailstorms, purchasing UL 61730 solar panels is often worth the investment.

Homeowners replace their solar panels after 25 years. That said, you don’t necessarily need to replace them at the 25-year mark. You’ll notice a declining ability to produce electricity over time. Most homeowners spring for a replacement when they notice their energy bills creeping up to regular levels or when solar panel repairs are extensive, frequent, and no longer economical.

The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.

However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.

The Birmingham, MI homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.